500 Bethany
Allen, TX 75002 · Spur Ridge Real Estate Company, LLC
Interior renovation registered for All Fleet at 500 Bethany
A 13,651-square-foot interior renovation for new tenant All Fleet was registered at 500 Bethany in Allen on August 22, 2024. The Texas Department of Licensing and Regulation lists an estimated project cost of $420,000 and marks the project closed.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 22, 2024
- since Aug 22, 2024
- Largest scope
- 13,651 sf
- Estimated cost
- $420K
- state registration
Permit & project history
1 projectInterior 2nd generation renovation for new tenant — bethany
TDLR project registrationRenovation/AlterationProject Closed13,651 sq ft$420K est.- Project #
- TABS2024026051
- Tenant / owner
- All Fleet
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 500 Bethany
What is being built at 500 Bethany in Allen?
A TDLR project registration describes a 13,651-square-foot interior renovation for new tenant All Fleet. It was filed August 22, 2024.
Is All Fleet opening at 500 Bethany?
The registration names All Fleet and describes an interior renovation for a new tenant at 500 Bethany. It does not provide an opening date.
How much will the All Fleet renovation cost?
The applicant's estimated cost for the project is $420,000, according to its TDLR registration.
When was the project at 500 Bethany permitted?
The TDLR project registration, number TABS2024026051, was filed on August 22, 2024. Its status is listed as Project Closed.
What's being renovated near QuikTrip on Bethany Drive?
A 13,651-square-foot interior renovation for new tenant All Fleet was registered at 500 Bethany, about 25 meters from QuikTrip Corporation at 450 E. Bethany Drive.
Also being built nearby
All of 75002- 450 E. Bethany Drive · Quiktrip CorporationJul 31, 2025Quiktrip # 926 fryer project — renovation/alteration — includes re-organization of existing kitchen equipment and addition of new fryer units. the existing type 1 hood and wrapped ducts will be replaced with type 1 new equipment. rooftop equipment will remain existing. project 300 sq ft · 25 m away
- 716 S. Greenville Avenue · Greentech One LPNov 7, 2025Castelion corporation - restroom/break area renovation — renovation/alteration — demolishing a single restroom, office and break area to create a mens restroom, womens restroom, shower and break area and providing vinyl flooring at high traffic areas. renovation area is 893sf · 337 m away
- 716 S. Greenville · Greentech One LPJan 7, 2025Castelion — renovation/alteration — new finishes and air conditioning of warehouse · 337 m away
- 919 S Greenville Ave · Allen Flex Center LPFeb 17, 2026Allen flex center lp c — new construction — light industrial - core & shell - building c 16,042 sq ft · 447 m away
- 919 S Greeville Ave · Allen Flex Center LPOct 26, 2026Allen flex suite — renovation/alteration — spec office for a spec warehouse building · 447 m away
- 929 S Greenville Ave · Allen Flex Center LPFeb 17, 2026Allen flex center lp a — new construction — light industrial - core & shell - building a - 28,941 sq ft · 477 m away
- 939 S Greenville Ave · Allen Flex Center LPFeb 17, 2026Allen flex center lp d — new construction — light industrial - core & shell - building d 16,042 sq ft · 507 m away
- 951 S Greenville Ave · Allen Flex Center LPFeb 17, 2026Allen flex center lp b — new construction — light industrial - core & shell - building b - 28,941 sq ft · 544 m away
- 955 S Greenville Ave · Allen Flex Center LPFeb 17, 2026Allen flex center lp e — new construction — light industrial - core & shell - building e - 16,042 sq ft · 556 m away
- 200 E Bethany Drive · Gc PackagingJul 23, 2026Gc packaging shipping office — renovation/alteration — 12,257 sq ft of interior renovation; shipping office and 2 restrooms in warehouse · 590 m away
- 200 E Bethany Dr · Fislb-Tx1 LLC Dba FaropointApr 23, 2026Gc packaging office reno — renovation/alteration — 12,257sf of interior renovation; including new accessible toilets, lobby/office/meeting room upgrades, new drinking fountains · 590 m away
- 201 E Bethany DrFeb 6, 2026Fangtastic music studio — renovation/alteration — interior renovation · 591 m away