New schools & daycares in Texas
524 addresses across Texas have permits or project filings for schools & daycares in the last two years. The most recent was filed at 16500 Shadybank Dr.
Latest filings
- 16500 Shadybank Dr · Risd Parkhill JhNov 13, 2026Site utilities to with in 5' of building water sewer storm · 75248
- 10005 TX-75 · Willis High School Multipurpose FacilityNov 13, 2026Willis high school multipurpose facility — new construction — indoor practice facility · 77378
- 1106 Rio Grande StNov 13, 2026Pease community campus · 78701
- 1211 Oltorf StNov 13, 2026Aisd travis echs r2 · 78704
- 1823 Red River Street · Erc & Jhh New Parking Lot And ImprovementsNov 13, 2026Erc & jhh new parking lot and improvements — new construction — consist of connecting the existing jhh parking lot to a new university parking lot on the former erwin center grounds. the lot will operate daily as university permit parking and as event/gameday parking providing 1000+ spaces. 413,820 sq ft · 78712
- 2200 University Club DrNov 13, 2026Sheff's kitchen - the university of texas golf club · 78732
- 4544 S Lamar Blvd SbNov 13, 2026Rooftop solar. rooftop solar backfed breaker interconnection. 2026-125643 da · 78745
- 6875 W Kiest BlvdNov 12, 2026Install (8) split systems ductwork, exhaust fans, dryer, crawl space exhaust, dedicated outside air system · 75211
- 1404 Riverside DrNov 12, 2026Action school redevelopment · 78741
- 2108 Lemon DrNov 12, 2026Installation of 4 playground shades. sp-2024-0112cx · 78744
- 1111 Prescott Dr · Candi's DaycareNov 11, 2026Candi's daycare — new construction — new construction of a daycare facility - 3,800 sq ft · 75146
- 5930 W Interstate 20 · F.o.t.e. School Of Beauty - ArlingtonNov 11, 2026F.o.t.e. school of beauty - arlington — renovation/alteration — remodel of existing retail space. scope of work to include new walls and equipment for offices, classrooms, and cosmetology stations along with associated lighting, electrical and mechanical systems. existing restrooms to remain · 76017
- 901 Audra Lane · Ann Windle School For Young Children RenovationNov 11, 2026Ann windle school for young children renovation — renovation/alteration — renovation of existing preschool. secure vestibule upgrades, interior finish upgrades throughout, foodservice equip. upgrades, resurfacing of exterior courtyard areas, and lighting fire alarm replacement. (37,097 sq ft) · 76209
- 377 Rayzor Rd · E.p. Rayzor Elementary School RenovationNov 11, 2026E.p. rayzor elementary school renovation — renovation/alteration — renovation of existing elementary school. secure vestibule upgrades, interior finish upgrades throughout, standardized classroom setup, foodservice and playground equip. upgrades, and lighting and security upgrades. (77,726 sq ft) · 76226
- 1701 Navo Rd · Navo Middle School RenovationNov 11, 2026Navo middle school renovation — renovation/alteration — renovation of existing middle school. secure vestibule upgrades, interior finish upgrades throughout, extend existing platform, and hvac and lighting upgrades. (158,000 sq ft) · 76227
- 2826 Elsie Faye Heggins StNov 10, 2026New electrical work in segment a addition · 75215
- 1025 W Loop 820 N · White Settlement ISD Brewer High School Partial Hvac ReplacementNov 10, 2026White settlement isd brewer high school partial hvac replacement — renovation/alteration — replacement of geothermal heat pump air conditioning units and addition of two closed circuit fluid cooler machines for geothermal well field temperature management · 76108
- 601 Blue Haze Dr · Blue Haze Elementary School Hvac ReplacementNov 10, 2026Blue haze elementary school hvac replacement — renovation/alteration — replacement of geothermal water-source heat pump air conditioning units and direct expansion gas-fired rooftop outside air units throughout the building. mechanical work requires removal and reinstallation of architectural ceiling systems · 76108
- 1001 Elbel Road · New Student Parking Samuel Clemens High SchoolNov 10, 2026New student parking samuel clemens high school — new construction — clemens hs parking & improvements proposes the development of an approximately 3.5-acre parking lot on the southwestern edge of clemens highschool · 78154
- 2406 Rosewood Ave · Rosewood HallNov 10, 2026Rosewood · 78702
- 2902 Medical Arts StNov 10, 2026Ut austin - law student housing · 78705
- 4611 Tilley StNov 10, 2026Arts education building · 78723
- 2940 Singleton BlvdNov 9, 2026Dsst-disd west dallas junior high removal of existing two (02)-air-cooled chillers and provide two (02) new air-cooled chillers. provide demolition of existing piping and electrical connections and route new piping and electrical to the new chillers · 75212
- 5123 Fm2194 · Bland ISD Es & Ms RenovationNov 9, 2026Bland isd es & ms renovation — renovation/alteration — the project consists of roofing, hvac and kitchen improvements at the existing elementary and middle school campus · 75423
- 6164 Fm2194 · Bland ISD Hs RenovationNov 9, 2026Bland isd hs renovation — renovation/alteration — this project consists of kitchen improvements to the existing high school · 75423
- 105 W. Oak St · Yantis ISD - Elementary RemodelNov 9, 2026Yantis isd - elementary remodel — renovation/alteration — remodel of elementary school · 75497
- 1400 E Nolana Ave · Repair & Renovation Of The School Of OptometryNov 9, 2026Repair & renovation of the school of optometry — renovation/alteration — the mcallen health affairs & logistics building is an existing facility that will be renovated for the school of optometry. spaces to include classrooms, instructional labs, administrative spaces, and a clinic · 78504
- 3801 Martin Luther King Jr BlvdNov 9, 2026A resubdivision of chernosky subdivision no. 10 lot 1, block 1 · 78721
- 6707 Emerald Forest DrNov 9, 2026Homebuilders loop ref; 2026 073944 bp · 78745
- 901 Main Street · Chireno ISD 2026 Bond Projects - New Elementary SchoolNov 6, 2026Chireno isd 2026 bond projects - new elementary school — additions to existing building — new 23,223 sq ft elementary school addition with classrooms and administrative areas · 75937
- 2206 Lucas Ave · Lucas LoftsNov 6, 2026Lucas lofts — renovation/alteration — historic renovation of existing school building and new construction addition. 37 units in the historic building, 12 units in the new building, to be used as affordable senior housing · 76301
- 2015 Ridgecrest Drive · Ridgecrest Elementary School Playground UpgradesNov 6, 2026Ridgecrest elementary school playground upgrades — renovation/alteration — ridgecrest elementary school. the scope includes selective demolition and site improvements, the installation of new play equipment, updated grading. modifications to existing storm sewer boxes · 77055
- 10805 School House Ln · Grisham Ms Athletic Field And Field HouseNov 6, 2026Rrisd grisham ms artificial turf field · 78750
- 1412 Norseman TerNov 6, 2026Eplan: commercial expedited review - new construction of an elementary school on existing site. building to include 1 story and 3 story portions. (94951 sq ft) · 78758
- 6911 Lemmon Ave · Frontiers Of Flight Museum - LaunchpadNov 5, 2026Bu zo scope of work:conversion of storage space into classroom space within the existing museum · 75209
- 2615 Anson RdNov 5, 2026A new elementary school. the elementary school which was located on this site is currently being demolished · 75235
- 5955 Alpha Road · Paul Mitchell The School DallasNov 5, 2026Paul mitchell the school dallas — renovation/alteration — remodel of tenant space on 1st (1,425 sq ft) + 2nd floors (14,295 sq ft) of a 2 story (33,277 total square foot) building · 75240
- 8845 Long Point Road · The Goddard School - Clark Family Venture, LLCNov 5, 2026The goddard school - clark family venture, llc — renovation/alteration — interior renovation for day care facility with site improvement revising layout of parking for placement of two playground areas, one on the south and one on the west side of the building · 77055
- 10750 Cradlerock DrNov 4, 2026Electrical work · 75217
- 5955 Alpha RdNov 4, 2026This is a tenant remodel of a 1st floor lobby and 2nd floor office space. the proposed use will be for a cosmetology and barbering school. we will be replacing both an interior stair and an exterior egress stair and remodeling most of the space · 75240
- 6601 Canyon Falls Drive, Flower Mound, TX 76226 · Argyle ISD New High School Baseball & Softball ComplexNov 4, 2026Argyle isd new high school baseball & softball complex — new construction — new 9,755 sq ft field house with concession, coaches office, restrooms, laundry room, equipment storage, idf, athletes and coaches locker rooms and showers. new 6,525 sq ft baseball grandstand with 434 sq ft pressbox structure. new 5,212 sq ft softball grandstan · 76226
- 5311 Mercer St · St. George Fellowship Activity Center Phase 1Nov 4, 2026St. george fellowship activity center phase 1 — new construction — construction of a new parish hall & interior finish out of first floor · 77005
- 121 W 6th StNov 4, 2026Change of use from b (admin/ professional offices) to education for private school use · 78701
- 3700 Convict Hill RdNov 4, 2026Per aisd 2022 bond language. secure entry vestibule upgrades storefront and glazing installation. life safety and security improvements. big gym replacement · 78749
- 6525 Old Orchard Dr · Carlisle Elementary SchoolNov 3, 2026Carlisle elementary school — renovation/alteration — flooring renovation and hvac controls · 75023
- 2520 Scenic Dr, Plano · Andrews Elementary SchoolNov 3, 2026Andrews elementary school — new construction — flooring, restroom renovation and fire alarm replacement · 75025
- 2131 Butler StNov 3, 2026Zo bc we are installing a playground at an existing site with 2 single post shade structures included in the design for the new daycare that is to be at this location. the building has already had modifications by others that was not in our scope of work. all the work that we are doing is outside of the existing building in the new playground area in back of the building outside the building footprint. our work is on the same lot as the building · 75235
- 2005 W W Thorne D · Nimitz Hs Athletic ImprovementsNov 3, 2026Nimitz hs athletic improvements — new construction — new athletic facility for existing nimitz high school · 77073
- 502 Oakland AveNov 3, 2026Eplan-expedited review: [approved] interior remodel and change of use from child daycare to personal improvement service. scope of work to include demolition of flooring fans plumbing fixtures light fixtures update parking stalls to meet zoning requirements (2503 sq ft) · 78703
- 8801 Mc Cann DrNov 3, 2026Psh - the crossroads · 78757
Questions
What schools & daycares are being built in Texas?
524 addresses across Texas have permits or project filings for schools & daycares in the last two years. The most recent was filed at 16500 Shadybank Dr. Others include 10005 TX-75, 1106 Rio Grande St, 1211 Oltorf St.
Which Texas ZIP codes have the most new schools & daycares?
78704 (17), 77055 (16), 78703 (15), 76063 (14), 77072 (14).
How can I find out when a new school is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new school permit is filed.