2131 Butler St
Dallas, TX 75235
Daycare playground and shade structures planned on Butler Street
Permits indicate an outdoor playground is being built for a daycare at 2131 Butler St, with two shade structures included. City of Dallas permits were filed September 28 and November 3, 2026; the November permit describes work outside the existing building.
Summarized from City of Dallas records · updated Nov 3, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Nov 3, 2026
- since Jan 12, 2021
- Largest scope
- —
- Listed value
- $6K
- partial · often understated
Permit & project history
4 projectsZo bc we are installing a playground at an existing site with 2 single post shade structures included in the design for the new daycare that is to be at this location. the building has already had modifications by others that was not in our scope of work. all the work that we are doing is outside of the existing building in the new playground area in back of the building outside the building footprint. our work is on the same lot as the building
Zo bc we are installing a playground at an existing site with 2 single post shade structures included in the design for the new daycare that is to be at this location. the building has already had modifications by others that was not in our scope of work. all the work that we are doing is outside of the existing building in the new playground area in back of the building outside the building footprint. our work is on the same lot as the building
City of Dallas permitCommercial Alteration Addition PermitWe are building a playground at a daycare for parkland hospital. there are two shade structures that will need to be permitted
We are building a playground at a daycare for parkland hospital. there are two shade structures that will need to be permitted
City of Dallas permitCommercial Accessory Structure Permit
Sources: City of Dallas
Questions about 2131 Butler St
What is being built at 2131 Butler St in Dallas?
City permits describe a playground for a daycare, with two shade structures. The work is outside the existing building.
When were permits filed for the playground at 2131 Butler St?
The City of Dallas filed a commercial accessory structure permit on September 28, 2026, and a commercial alteration and addition permit on November 3, 2026.
Is a new daycare being built at 2131 Butler St?
The permits describe playground work for a daycare at the location, not construction of a new daycare building. The November permit says the work is outside the existing building.
Will the daycare playground at 2131 Butler St have shade structures?
Yes. The permit descriptions include two shade structures as part of the playground design.
How large will the playground at 2131 Butler St be?
An associated project description lists an approximately 2,623-square-foot outdoor playground at the address.
Also being built nearby
All of 75235- 2131 Butler Street · Dallas County Hospital District D/B/A Parkland HealthSep 29, 2026Butler st. employee childcare center - playground — renovation/alteration — scope of work includes construction of an approximately 2,623-square-foot outdoor playground at 2131 butler street, dallas, serving children from 6 weeks to 6 years old. the goal is to create a safe, accessible, shaded, and developmentally appropriat
- 2121 Butler StJul 31, 2025Electrical remodel · 24 m away
- 2115 Butler StNov 18, 2020Gas test · 39 m away
- 5323 Harry Hines Blvd · Ut Southwestern Medical CenterNov 7, 2026Y4 building office lab renovation — renovation/alteration — renovation · 128 m away
- 5323 Harry Hines Blvd. E7212a · University Of Texas Southwestern Medical CenterJan 28, 2026J3 - pediatrics offices — renovation/alteration — 2,070 sq ft pediatric administration office tenant improvement on the third floor in an existing, nine story, office building · 128 m away
- 5323 Harry Hines Blvd, Y8.204, 206, 200 · The University Of TexasOct 5, 2026Y8.204, 206, 200 lab & tissue culture renovation — renovation/alteration — this project is located on the 8th floor of the existing building. scope includes the removal of existing cold storage, renovation of the two existing labs, upgrading finishes in the office. 1950 s.f · 128 m away
- 5323 Harry Hines Blvd · Ut Southwestern Medical Center Of DallasOct 28, 202418966 - e5 dual suite renovatoin — renovation/alteration — minor demolition, new paint, flooring, wall base, electrical and data outlets, new ceiling and lighting in some areas · 128 m away
- 5323 Harry Hines Boulevard · Ut Southwestern Medical CenterDec 18, 2024Senator kay bailey hutchinson drive sidewalk improvements — renovation/alteration — sidewalk/ramp improvements, landscaping, and paving.2800sf · 128 m away
- 5303 Harry Hines Blvd · State Of TexasMay 13, 2026Building ul07 orthopaedics — renovation/alteration — renovation of clinic space on level 07 of the aston building (u) · 180 m away
- 5554 Harry Hines BlvdNov 18, 2026Repipe main line and branch line sewer. repipe of the kitchen sewer also replace cleanouts · 185 m away
- 2213 Butler StNov 11, 2020Install hvac and refrigeration · 197 m away
- 2241 Butler StApr 6, 2026Adding a dedicated 240volt, and 120volts circuits · 221 m away
More medical facilities in 75235, schools & daycares in 75235.