groundranger
Active · latest filing Nov 2026Commercial

5323 Harry Hines Blvd

Dallas, TX 75390 · Y4 Building Office Lab Renovation, Ja1 Holding And Storage Renovation + 26 more

UT Southwestern lab and office renovations at 5323 Harry Hines

Multiple interior renovations are planned at this multi-tenant building site, including lab, office, equipment-galley and support-space work. TDLR project registrations for the address run from December 12, 2025, through November 7, 2026; the latest is a 5,000-square-foot office and lab renovation in Building Y.

Summarized from Texas Department of Licensing and Regulation records · updated Nov 7, 2026

Projects
28
28 filings
Latest filing
Nov 7, 2026
since May 28, 2024
Largest scope
10,000 sf
Estimated cost
$96M
state registration

Where this project stands

In state plan review

Y4 Building Office Lab Renovation

5,000 sq ft · $2.0M est.

  1. RegisteredNov 7, 2026
  2. Plan reviewnow
  3. ConstructionJan '27 – Jul '27
  4. Inspected
  5. Closed

Construction is scheduled to start Jan 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 3 phone numbers

Permit & project history

28 projects
  1. Renovation — y building

    TDLR project registrationRenovation/AlterationProject Registered5,000 sq ft$2.0M est.
    Tenant / owner
    Y4 Building Office Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  2. Partial demolition and renovation of the first floor with ja building to provide infrastructure holding rooms and breakroom — ja building

    TDLR project registrationRenovation/AlterationProject Registered10,000 sq ft$881K est.
    Tenant / owner
    Ja1 Holding And Storage Renovation
    Design firm
    Pro
    Contact
    Pro
  3. The project involves repurposing a 577 square foot room from a large equipment galley to two separate equipment galleys with upgrades to the interior finishes and mep systems to accommodate the laboratory equipment. — harry s. moss clinical science building

    TDLR project registrationRenovation/AlterationReview Complete577 sq ft$132K est.
    Tenant / owner
    123380 - J5.106 Equipment Galley Renovation
    Design firm
    Pro
    Contact
    Pro
  4. Demolition of existing lab to be converted to new research lab with staff workstations and office — ut southwestern f building

    TDLR project registrationRenovation/AlterationReview Complete1,600 sq ft$1.2M est.
    Tenant / owner
    Utsw F4 Pediatric Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  5. Demolition of existing lab to be converted to office staff space for offices, conference room and break area — ut southwestern f building

    TDLR project registrationRenovation/AlterationInspection Complete2,300 sq ft$877K est.
    Tenant / owner
    Utsw F2 Lab To Office Renovation
    Design firm
    Pro
    Contact
    Pro
  6. Renovation of existing lab and lab support spaces on level 9 of building y. — cecil h. and ida green biomedical research building (building y)

    TDLR project registrationRenovation/AlterationReview Complete3,300 sq ft$2.1M est.
    Tenant / owner
    Utsw Y9 Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  7. Partial interior renovation of exiting lab space. 1,644sf — ut southwestern

    TDLR project registrationRenovation/AlterationReview Complete1,644 sq ft$700K est.
    Tenant / owner
    162127 L4.202 Lab Renovation - Phase Two
    Design firm
    Pro
    Contact
    Pro
  8. 288 sq ft tenant-improvement of a conference and storage room of an existing multi-story office building. — university of texas southwestern medical center

    TDLR project registrationRenovation/AlterationProject Registered288 sq ft$80K est.
    Tenant / owner
    E1.410g Glass Wall
    Design firm
    Pro
    Contact
    Pro
  9. UTSW L5 LAB RENOVATION

    Renovations of labs of rooms l5.272, l5.274, l5.274a and l5.600 in the "l" building. — ut southwestern medical center

    TDLR project registrationRenovation/AlterationReview Complete1,579 sq ft$1.0M est.
    Tenant / owner
    Utsw L5 Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  10. Repurpose 334 square feet of existing office space to a break room for the animal resource center (arc) on the south campus of ut southwestern — philip r. jonsson basic science research building

    TDLR project registrationRenovation/AlterationInspection Complete334 sq ft$145K est.
    Tenant / owner
    125107 - K1.504 Renovation
    Design firm
    Pro
    Contact
    Pro
  11. Repurpose an existing laboratory into four private offices, 1 reception area and break area — cecil h and ida green science building

    TDLR project registrationRenovation/AlterationProject Closed754 sq ft$230K est.
    Tenant / owner
    109494 - L3.154 & 156 Lab To Office Renovation
    Design firm
    Pro
    Contact
    Pro
  12. Repurpose a portion of an existing gross anatomy lab into offices and conference space, update the remaining portion of the gross anatomy lab and adjacent corridor finishes. — cecil h and ida green science building

    TDLR project registrationRenovation/AlterationInspection Complete2,615 sq ft$890K est.
    Tenant / owner
    37472 - L1.140 Anatomy Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  13. Total area 2,900 sq ft: demolition and renovation of the fourth floor "f" building to be converted into (1) lab space,microscope room, freezer galley and tissue culture. — utsw f building

    TDLR project registrationRenovation/AlterationProject Closed2,900 sq ft$1.9M est.
    Tenant / owner
    F4 Pediatric Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  14. Renovation of existing lab spaces into tissue culture room, open lab and pi office. — ut southwestern medical center, harry s. moss clinical science building

    TDLR project registrationRenovation/AlterationInspection Complete5,000 sq ft$650K est.
    Tenant / owner
    Utsw J2 Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  15. Remodel of existing lab to accommodate needs of client to include new flooring, paint, refinishing of existing casework, and ceilings. — ut south western building l

    TDLR project registrationRenovation/AlterationInspection Complete735 sq ft$225K est.
    Tenant / owner
    Ut South Western L1 Research Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  16. Repurpose outdated laboratory space into a new tissue culture room — philip r. jonsson basic science research building

    TDLR project registrationRenovation/AlterationProject Closed384 sq ft$270K est.
    Tenant / owner
    40155 - K3.510 Tissue Culture Room Renovation
    Design firm
    Pro
    Contact
    Pro
  17. The scope consists of removing existing desks and millwork in open area suite #420 and installing 26 new cubicles. the project square footage is 2,140 square feet. — physicians office building 1

    TDLR project registrationRenovation/AlterationProject Closed2,140 sq ft$95K est.
    Tenant / owner
    Tsw Hp4.420 Office Suite Renovation
    Design firm
    Pro
    Contact
    Pro
  18. Renovate 2,480 sq ft of an existing laboratory space into new general laboratories and tissue culture rooms. — cecil h. and ida green biomedical research building

    TDLR project registrationRenovation/AlterationProject Closed2,480 sq ft$1.8M est.
    Tenant / owner
    731363 - Y7.208 And 216 Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  19. Renovation existing laboratory, office space, and cold room to repurpose into a new laboratory and tissue culture rooms — cecil h. and ida green biomedical research building

    TDLR project registrationRenovation/AlterationProject Closed1,510 sq ft$1.8M est.
    Tenant / owner
    5249 - Y5.220 Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  20. Removal of an existing walk-in cooler and repurpose the space for freezer galley — cecil h. and ida green biomedical research building

    TDLR project registrationRenovation/AlterationReview Complete240 sq ft$300K est.
    Tenant / owner
    4159 - Y4.326 Freezer Storage Room
    Design firm
    Pro
    Contact
    Pro
  21. Repurpose approximately 370 sq ft laboratory into an employee work area with small break room, renovate the existing men's and women's public toilets. — cecil h. and ida green biomedical research building

    TDLR project registrationRenovation/AlterationProject Closed750 sq ft$300K est.
    Tenant / owner
    2485 - L5.270 Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  22. Renovate an existing laboratory for a new laboratory for the department of internal medicine — cecil h. and ida green biomedical research building

    TDLR project registrationRenovation/AlterationProject Closed2,450 sq ft$594K est.
    Tenant / owner
    695630 - Y6.302 Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  23. To accommodate better conditions for animal holding in existing vivarium rooms. this will require renovating the existing four animal holding rooms and one special procedure room. the existing corridor will also be upgraded with new finishes. — utsw f3/g3 pediatric research building

    TDLR project registrationRenovation/AlterationProject Closed13,346 sq ft$3.0M est.
    Tenant / owner
    F3/G3 Phase 3 Lab Building Renovation
    Design firm
    Pro
    Contact
    Pro
  24. Interior reno of existing space to provide space for seimen's spect ct equipment and a control room with demolition and construction of interior finishes including floors, wall finishes, ceilings, base and wall cabinets. plumbing, hvac and elec. systems — ut southwestern medical center - pob i; second floor

    TDLR project registrationRenovation/AlterationProject Closed590 sq ft$519K est.
    Tenant / owner
    Utswmc - Ha2.146 Spect Ct Room
    Design firm
    Pro
    Contact
    Pro
  25. Central and vendor storage, kitchen/servery; ground/first floor (ct to storage, pst; administration to outpatient therapy space); second floor (including pacu expansion and or suite); third floor- icu toilet, millwork and sink refresh; 4th-6th floors — ut south western medical center

    TDLR project registrationRenovation/AlterationProject Closed63,258 sq ft$96M est.
    Tenant / owner
    Utsw Zale Lipshy Hospital Renovation
    Design firm
    Pro
    Contact
    Pro
  26. 19,600 sq ft this project renovates currently unoccupied spaces into classrooms, huddle rooms, study rooms and conference rooms. removal of existing equipment, finishes and materials and replacing with new. — utsw medical center building y - level 2

    TDLR project registrationRenovation/AlterationProject Closed19,600 sq ft$6.0M est.
    Tenant / owner
    Utsw Y2 Classroom And Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  27. The project involves demolition and renovation as needed to increase staff occupancy within the existing office space, and provide new interior finishes — fred f. florance bioinformation center

    TDLR project registrationRenovation/AlterationProject Closed6,200 sq ft$375K est.
    Tenant / owner
    614235 - E4.350 Office Renovation
    Design firm
    Pro
    Contact
    Pro
  28. Repurpose an existing laboratory into a dry ice storage room. — cecil h. and ida green biomedical research building "y

    TDLR project registrationRenovation/AlterationProject Closed260 sq ft$210K est.
    Tenant / owner
    673057 - Y3.402 Dry Ice Storage
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5323 Harry Hines Blvd

What is being built at 5323 Harry Hines Blvd?

TDLR records list multiple renovations at the multi-tenant site, including lab and office updates, equipment-galley work, and holding and storage space. The latest registration, dated November 7, 2026, is for a 5,000-square-foot renovation in Building Y (TABS2027005403).

Is a new building planned at 5323 Harry Hines Blvd?

The listed projects are renovations and interior alterations, not a new building. They include lab, office, equipment-galley and support-space work.

What lab renovations are planned at 5323 Harry Hines?

The registrations include research-lab work in Building F, lab renovations in Buildings Y and L, and equipment-galley updates in the Harry S. Moss Clinical Science Building. One recent project is a 1,600-square-foot pediatric lab renovation registered September 10, 2026 (TABS2027000712).

What's being renovated near Building Ul07 Orthopaedics?

At 5323 Harry Hines Blvd, TDLR records list multiple interior projects, including a renovation of Building Y's office and lab space registered November 7, 2026. Building Ul07 Orthopaedics is listed about 65 meters away.

What's changing near the Y8.204, 206, 200 lab renovation?

The address has several registered renovation projects. A separate project in the Y8.204, 206 and 200 lab and tissue-culture area was filed October 5, 2026, and covers lab renovations and office finish updates.

What is the JA1 Holding and Storage Renovation?

The project calls for partial demolition and renovation of the first floor to provide infrastructure holding rooms and a breakroom. It was registered October 30, 2026, as a 10,000-square-foot project (TABS2027004855).

Also being built nearby

All of 75390

More demolitions in 75390, warehouses & industrial in 75390, new homes in 75390.

Email me when plan review is complete