groundranger
Active · latest filing Nov 2026Commercial

5200 Harry Hines Blvd

Dallas, TX 75235 · Cardiac Ep Lab Sheel Build Out, Phhs-Ir Renovation + 6 more

Medical renovations include a cardiac EP lab and IR rooms

Permits indicate interior medical renovations at this multi-tenant site, including a cardiac electrophysiology lab and renovations for two new interventional radiology rooms. TDLR registered the 4,005-square-foot IR project on October 6, 2026, and the 1,351-square-foot cardiac EP lab project on November 13, 2026; both descriptions identify Parkland Memorial Hospital.

Summarized from Texas Department of Licensing and Regulation, City of Dallas records · updated Nov 13, 2026

Projects
42
42 filings
Latest filing
Nov 13, 2026
since Nov 20, 2020
Largest scope
66,500 sf
Estimated cost
$36M
state registration

Where this project stands

In state plan review

Cardiac EP Lab Sheel Build Out

1,351 sq ft · $1.2M est.

  1. RegisteredNov 13, 2026
  2. Plan reviewnow
  3. ConstructionFeb '27 – Aug '27
  4. Inspected
  5. Closed

Construction is scheduled to start Feb 28, 2027. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 3 phone numbers

Permit & project history

42 projects
  1. Scope of work includes building out the cardiac ep lab, control room and scrub sink area which is approximately 1,351 s.f. of shell space. upgrades to interior finishes, mechanical, plumbing, electrical and low voltage as required by equipment vendor — parkland memorial hospital

    TDLR project registrationRenovation/AlterationProject Registered1,351 sq ft$1.2M est.
    Tenant / owner
    Cardiac Ep Lab Sheel Build Out
    Design firm
    Pro
    Contact
    Pro
  2. Med gas

    Med gas

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-003995
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. PHHS-IR Renovation

    Renovation of existing reading rooms for 2 new ir rooms and associated support spaces. in addition, renovation of 4 existing prep/recovery stations (including 1 iso) to 4 standard prep/recov stations as well as re-route of existing smoke compartment — parkland memorial hospital

    TDLR project registrationRenovation/AlterationProject Registered4,005 sq ft$3.0M est.
    Tenant / owner
    Phhs-Ir Renovation
    Design firm
    Pro
    Contact
    Pro
  4. Hvac

    Hvac

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-002021
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Changing lights for remodel installing lights and plugs fl1 b and e

    Changing lights for remodel installing lights and plugs fl1 b and e

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-003360
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Install 1"-1/2" rpz, 14th floor room 490

    Install 1"-1/2" rpz, 14th floor room 490

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-002708
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Plumbing fl1 b and e

    Plumbing fl1 b and e

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-002455
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Replace existing exhaust fan 5 with new exhaust fan

    Replace existing exhaust fan 5 with new exhaust fan

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000453
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. – walkway lobby area rework existing receptacle and add (4) new 120v/20a receptacles1) convert existing receptacle to junction boxde-energize existing 120v/20a circuit.remove existing receptacle device.convert existing device box into a junction box.install stainless steel blank cover plate.maintain circuit continuity for downstream devices as required.2) install (4) new 120v / 20a receptacles from the new junction box, extend branch wiring to install:(2) new 120v / 20a duplex receptacles for (2) tv locations.(2) new 120v / 20a duplex receptacles to serve under-counter lighting power supplies

    – walkway lobby area rework existing receptacle and add (4) new 120v/20a receptacles1) convert existing receptacle to junction boxde-energize existing 120v/20a circuit.remove existing receptacle device.convert existing device box into a junction box.install stainless steel blank cover plate.maintain circuit continuity for downstream devices as required.2) install (4) new 120v / 20a receptacles from the new junction box, extend branch wiring to install:(2) new 120v / 20a duplex receptacles for (2) tv locations.(2) new 120v / 20a duplex receptacles to serve under-counter lighting power supplies

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001075
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Mcr selective demolition and renovation of parkland health's first floor areas 'b' and 'e'; in area 'b', a new enclosed room for a pharmacy workroom. in area 'e', the corridor will be extended to accommodate (3) new triage, (2) new exams, and (1) new phlebotomy station

    Mcr selective demolition and renovation of parkland health's first floor areas 'b' and 'e'; in area 'b', a new enclosed room for a pharmacy workroom. in area 'e', the corridor will be extended to accommodate (3) new triage, (2) new exams, and (1) new phlebotomy station

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001419
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Electrical zo bc finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    Electrical zo bc finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001953
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    Finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001972
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Room d26.03 • remove working light fixture and use to replace non-workinglight fixture• remove non-working light fixture and replace with workingfixture removed per note d26.03 in this room• remove and reinstall light fixture in new ceiling tilescope also listed on building permit application

    Room d26.03 • remove working light fixture and use to replace non-workinglight fixture• remove non-working light fixture and replace with workingfixture removed per note d26.03 in this room• remove and reinstall light fixture in new ceiling tilescope also listed on building permit application

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001788
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Remove casework and counters in their entirety includingmounting brackets, hardware, undercabinet lighting, etc.carefully remove fascia panels, protecting ceiling grid andtiles from damage. replace or repair any existing-to-remainmaterials and finishes [ceiling grid, ceiling tile, gypsum board,etc.] damaged during demolition. prepare wall to receive newfinishes.remove carpet tiles designated by owner for replacement.visit the job site to inspect existing conditions and to verifythe amount of carpet tiles to replace. carefully remove and salvage television/monitor and preparefor phhs storageremove working light fixture and use to replace non-workinglight fixtureremove non-working light fixture and replace with workingfixture removed per note d26.03 in this roomremove and reinstall light fixture in new ceiling tilepatch wall base as necessaryremove casework and counters in their entirety including mounting brackets, hardware,undercabinet lighting, etc. carefully remove fascia panels, protecting ceiling grid and tilesfrom damage. replace or repair any existing-to-remain materials and finishes [ceiling grid,ceiling tile, gypsum board, etc.] damaged during demolition. prepare wall to receive new finishes.carefully remove and salvage door, frame, and hardware and prepare for phhs storage.provide 24 hours notice to phhs before removingremove gypsum board ceilings, including framingremove acoustical ceiling grid, hanger wires may remainremove acoustical ceiling tiles and prepare tiles in usable conditionfor reinstallation. dispose of tiles not in usable condition.remove acoustical ceiling tilesremove partition beginning at its perpendicular intersection with the room-side face of thecorridor wallremove carpet tiles designated by owner for replacement. vconditions and to verify the amount of carpet tiles to replace. existing conditions and to verify the amount of carpet tiles to replace.remove partial carpet tiles left from demolition of partitions, casework, etc. and prepare fornew carpet tile installationremove operable partition panels, wall brackets, enclosure door [existing ceiling track to remain]remove corner guard, patch wall and prepare wall for finishingcarefully remove and salvage television/monitor and prepare for phhs storagecarefully remove and salvage ceiling-mounted projector and prepare for phhs storage[ceiling-mounted outlets to remain]carefully remove and salvage audio/visual equipment/controls and prepare for phhs storageremove above-door wall-mounted connection boxcarefully remove and salvage ceiling-mounted exit signage and return to phhsfinish patched surfaces to match finish that existed prior to patching. on continuous surfaces, refinish to nearest intersection or natural break. for an assembly, refinish entire unit. match color, texture, and appearance.new ceiling grid to match existing. reinstall ceiling tiles in usable condition [as approved by owner]. provide new ceiling tilesreplace ceiling tilepatch wall base as necessarypaint room walls sherwin william gray matters – 7066provide sound masking system for reading all roomalt4 install owner-provided wall protection on all areas where it appliesremove and salvage door leaf and hardware [to be removed from door frame] and prepare for phhs storage.remove ceiling grid and acoustical ceiling tiles between wall and next full row of 2x2 acoustical ceiling tilesremove carpet tiles designated by owner for replacement.prepare floor for new carpet tile installationrepair wall damaged by removal of existing construction. prepare wall surface to produce a smooth surface to receive new finishes.new ceiling grid to match existing. provide new ceiling tiles [to match existing] to finish ceiling.patch wall base as necessaryprovide new carpet tiles to match paint room walls

    Remove casework and counters in their entirety includingmounting brackets, hardware, undercabinet lighting, etc.carefully remove fascia panels, protecting ceiling grid andtiles from damage. replace or repair any existing-to-remainmaterials and finishes [ceiling grid, ceiling tile, gypsum board,etc.] damaged during demolition. prepare wall to receive newfinishes.remove carpet tiles designated by owner for replacement.visit the job site to inspect existing conditions and to verifythe amount of carpet tiles to replace. carefully remove and salvage television/monitor and preparefor phhs storageremove working light fixture and use to replace non-workinglight fixtureremove non-working light fixture and replace with workingfixture removed per note d26.03 in this roomremove and reinstall light fixture in new ceiling tilepatch wall base as necessaryremove casework and counters in their entirety including mounting brackets, hardware,undercabinet lighting, etc. carefully remove fascia panels, protecting ceiling grid and tilesfrom damage. replace or repair any existing-to-remain materials and finishes [ceiling grid,ceiling tile, gypsum board, etc.] damaged during demolition. prepare wall to receive new finishes.carefully remove and salvage door, frame, and hardware and prepare for phhs storage.provide 24 hours notice to phhs before removingremove gypsum board ceilings, including framingremove acoustical ceiling grid, hanger wires may remainremove acoustical ceiling tiles and prepare tiles in usable conditionfor reinstallation. dispose of tiles not in usable condition.remove acoustical ceiling tilesremove partition beginning at its perpendicular intersection with the room-side face of thecorridor wallremove carpet tiles designated by owner for replacement. vconditions and to verify the amount of carpet tiles to replace. existing conditions and to verify the amount of carpet tiles to replace.remove partial carpet tiles left from demolition of partitions, casework, etc. and prepare fornew carpet tile installationremove operable partition panels, wall brackets, enclosure door [existing ceiling track to remain]remove corner guard, patch wall and prepare wall for finishingcarefully remove and salvage television/monitor and prepare for phhs storagecarefully remove and salvage ceiling-mounted projector and prepare for phhs storage[ceiling-mounted outlets to remain]carefully remove and salvage audio/visual equipment/controls and prepare for phhs storageremove above-door wall-mounted connection boxcarefully remove and salvage ceiling-mounted exit signage and return to phhsfinish patched surfaces to match finish that existed prior to patching. on continuous surfaces, refinish to nearest intersection or natural break. for an assembly, refinish entire unit. match color, texture, and appearance.new ceiling grid to match existing. reinstall ceiling tiles in usable condition [as approved by owner]. provide new ceiling tilesreplace ceiling tilepatch wall base as necessarypaint room walls sherwin william gray matters – 7066provide sound masking system for reading all roomalt4 install owner-provided wall protection on all areas where it appliesremove and salvage door leaf and hardware [to be removed from door frame] and prepare for phhs storage.remove ceiling grid and acoustical ceiling tiles between wall and next full row of 2x2 acoustical ceiling tilesremove carpet tiles designated by owner for replacement.prepare floor for new carpet tile installationrepair wall damaged by removal of existing construction. prepare wall surface to produce a smooth surface to receive new finishes.new ceiling grid to match existing. provide new ceiling tiles [to match existing] to finish ceiling.patch wall base as necessaryprovide new carpet tiles to match paint room walls

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000257
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Finsh out shell space for patient rooms, offices and other work areas. includes install of supply air, return air, exhaust air, terminal units and air devices

    Finsh out shell space for patient rooms, offices and other work areas. includes install of supply air, return air, exhaust air, terminal units and air devices

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-000634
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Finish out of shell space for patient rooms, offices, and work areas. includes domestic cold and hot water and sanitary wast and vent piping

    Finish out of shell space for patient rooms, offices, and work areas. includes domestic cold and hot water and sanitary wast and vent piping

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001326
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Finish our of shell space patient rooms, work spaces and offices. includes new aap's. zvb's and mgo's

    Finish our of shell space patient rooms, work spaces and offices. includes new aap's. zvb's and mgo's

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001332
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Finish out patient room, offices and common work areas. install supply & return air and accociated termianal units and air devices

    Finish out patient room, offices and common work areas. install supply & return air and accociated termianal units and air devices

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-000633
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. New medgas finish out for shell space paitent rooms, oxygen, medical air, medical vaccuum. includes new aap's, zvb's, mgo's

    New medgas finish out for shell space paitent rooms, oxygen, medical air, medical vaccuum. includes new aap's, zvb's, mgo's

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001325
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Finish existing shell space for patient rooms, offices, conference rooms, equipment storage rooms and restrooms. plumbing to include new domestic cold and hot water and sanitary waste and vent piping

    Finish existing shell space for patient rooms, offices, conference rooms, equipment storage rooms and restrooms. plumbing to include new domestic cold and hot water and sanitary waste and vent piping

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001324
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  21. Hvac

    Hvac

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-000500
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  22. Level 9 - finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    Level 9 - finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000040
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. Level 8 -- finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    Level 8 -- finish out of existing shell space. will include new patient rooms, offices, conference rooms, equipment storage rooms, and restrooms

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000036
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  24. Interior demolition of level 8 and 9 only. architectural demolition includes window shades, flooring, ceiling, and millwork. electrical demolition includes outlets and lights. mechanical demolition includes duct, grills, and mechanical piping. plumbing demolition includes medgas, plumbing fixtures, domestic water, and vents

    Interior demolition of level 8 and 9 only. architectural demolition includes window shades, flooring, ceiling, and millwork. electrical demolition includes outlets and lights. mechanical demolition includes duct, grills, and mechanical piping. plumbing demolition includes medgas, plumbing fixtures, domestic water, and vents

    City of Dallas permitCommercial Demolition Permit
    Record
    COM-DEM-25-000034
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  25. Selective demolition and renovation of areas 'b' and 'e': in area 'b', a new enclosed room for a pharmacy workroom. in area 'e', the corridor will be extended to accommodate (3) new triage, (2) new exam, and (1) new phlebotomy station — parkland memorial hospital

    TDLR project registrationRenovation/AlterationReview Complete3,000 sq ft$1.7M est.
    Tenant / owner
    Parkland Health - Doris Nelson, Rn Triage Facility & Pharmacy Workroom
    Design firm
    Pro
    Contact
    Pro
  26. Finish out of shell space for 112 patient beds between 2 floors. — parkland health

    TDLR project registrationRenovation/AlterationInspection Complete66,500 sq ft$36M est.
    Tenant / owner
    Wish 8th And 9th Floors Finish-Out
    Design firm
    Pro
    Contact
    Pro
  27. Renovation of a classroom and office in parkland hospital [phhs], and a workroom in adjacent ron j. anderson clinic building [rja], to serve as new ir reading rooms. — parkland memorial hospital

    TDLR project registrationRenovation/AlterationProject Closed2,060 sq ft$235K est.
    Tenant / owner
    Phhs-Ir Reading Room Renovation
    Design firm
    Pro
    Contact
    Pro
  28. Parkland - Ultrasound

    Conversion of (2) offices into (1) ultrasound room with new equipment and (1) storage room with new equipment. — parkland health & hospital systems

    TDLR project registrationRenovation/AlterationProject Closed600 sq ft$295K est.
    Tenant / owner
    Parkland - Ultrasound
    Design firm
    Pro
    Contact
    Pro
  29. Psych Intake Design

    Expansion into an exterior breezeway to support the psych intake and evaluation area. — parkland hospital

    TDLR project registrationAdditions to Existing BuildingProject Closed1,115 sq ft$600K est.
    Tenant / owner
    Psych Intake Design
    Design firm
    Pro
    Contact
    Pro
  30. Hybrid OR Addition

    Build out of a currently shelled space on the third level of parkland hospital to accommodate a new hybrid or. — parkland hospital

    TDLR project registrationAdditions to Existing BuildingProject Closed1,250 sq ft$1.5M est.
    Tenant / owner
    Hybrid Or Addition
    Design firm
    Pro
    Contact
    Pro
  31. Add 2 smoke detectors and 1 relay for door release

    Add 2 smoke detectors and 1 relay for door release

    City of Dallas permitFire Alarm (FA) Commercial Renovation$3K
    Record
    2011251003
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  32. Adding new antennas to existing cell tower

    Adding new antennas to existing cell tower

    City of Dallas permitBuilding (BU) Commercial Renovation$15
    Record
    2011161039
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  33. Update existing access control panesl thourghout the building installed card readers and elctric doo

    Update existing access control panesl thourghout the building installed card readers and elctric doo

    City of Dallas permitSecurity System (SE) Commercial Alteration$872
    Record
    2011111051
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  34. Update existing access control panesl thourghout the building installed card readers and elctric doo

    Update existing access control panesl thourghout the building installed card readers and elctric doo

    City of Dallas permitSecurity System (SE) Commercial Alteration$543
    Record
    2011111056
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  35. Add elevator controls to an existing fire alarm system

    Add elevator controls to an existing fire alarm system

    City of Dallas permitFire Alarm (FA) Commercial Alteration$5
    Record
    2009021002
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  36. Access control 11 doors k0310

    Access control 11 doors k0310

    City of Dallas permitSecurity System (SE) Commercial Renovation$14K
    Record
    2009091019
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  37. Replace or modify existing hvac

    Replace or modify existing hvac

    City of Dallas permitMechanical (ME) Commercial Alteration$354
    Record
    2004133050
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  38. Install lawn sprinkler

    Install lawn sprinkler

    City of Dallas permitLawn Sprinkler (LS) Commercial Alteration$2
    Record
    2002102005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  39. Install electrical for new contruction or addition

    Install electrical for new contruction or addition

    City of Dallas permitElectrical (EL) Commercial Alteration$195
    Record
    1910093007
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  40. Install electrical for new contruction or addition

    Install electrical for new contruction or addition

    City of Dallas permitElectrical (EL) Commercial Alteration$1
    Record
    1910073107
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

+ 2 older projects. See the full history with a free trial.

Sources: Texas Department of Licensing and Regulation · City of Dallas

Questions about 5200 Harry Hines Blvd

What is being built at 5200 Harry Hines Blvd in Dallas?

Permit records indicate medical interior renovations, including a cardiac EP lab, control room and scrub sink area, along with renovations for two new IR rooms and related support spaces. The project descriptions identify Parkland Memorial Hospital.

When were the renovations at 5200 Harry Hines Blvd permitted?

TDLR registered the PHHS-IR Renovation on October 6, 2026, and the Cardiac EP Lab Shell Build Out on November 13, 2026.

How large are the medical projects at 5200 Harry Hines Blvd?

The registered cardiac EP lab project covers about 1,351 square feet. The IR renovation covers 4,005 square feet.

What is the estimated cost of the IR renovation at 5200 Harry Hines Blvd?

The TDLR registration lists an applicant-estimated cost of $3 million for the PHHS-IR Renovation. This is an estimate for that project, not a total cost for all work at the address.

What is changing in the IR renovation at 5200 Harry Hines Blvd?

The project description calls for two new IR rooms and associated support spaces, plus renovation of four existing prep and recovery stations and rerouting an existing smoke compartment. TDLR registered it on October 6, 2026, as project TABS2027002914.

What medical construction is happening near Building UL07 Orthopaedics on Harry Hines Blvd?

At 5200 Harry Hines Blvd, nearby Building UL07 Orthopaedics at 5303 Harry Hines Blvd, permits indicate renovations for a cardiac EP lab and IR rooms. The two TDLR registrations were filed in October and November 2026.

Also being built nearby

All of 75235

More demolitions in 75235, warehouses & industrial in 75235, medical facilities in 75235.

Email me when plan review is complete