1935 Medical District Drive
Dallas, TX 75235 · B3 Dr Madsen Office, Childrens Dl Non-Sterile Carousel Replacement + 13 more
Children’s Medical Center Dallas renovations at 1935 Medical District Drive
TDLR registrations dated January through October 2026 describe renovations inside the multi-tenant site at 1935 Medical District Drive, including a new MRI suite, NICU room conversions, equipment replacements and a small office addition. The records describe work within existing medical-center space, not a new standalone building.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 5, 2026
- Projects
- 15
- 15 filings
- Latest filing
- Oct 5, 2026
- since Oct 7, 2024
- Largest scope
- 10,028 sf
- Estimated cost
- $3.6M
- state registration
Where this project stands
Inspected · closing outB3 Dr Madsen Office
120 sq ft · $80K est.
- RegisteredOct 5, 2026
- Plan review
- ConstructionSep '26 – Oct '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
15 projectsAdd 1 wall and door to create office at end of hall — children’s main campus
TDLR project registrationRenovation/AlterationInspection Complete120 sq ft$80K est.- Project #
- TABS2027002767
- Tenant / owner
- B3 Dr Madsen Office
- Design firm
- Pro
- Contact
- Pro
The replacement of three swisslog carousel machines with new omnicell carousel machines. this project will be done in phases and will need a staging area to assemble the machines. it will also include make ready space in the existing conference — children’s medical center dallas
TDLR project registrationRenovation/AlterationInspection Complete833 sq ft$300K est.- Project #
- TABS2026018451
- Tenant / owner
- Childrens Dl Non-Sterile Carousel Replacement
- Design firm
- Pro
- Contact
- Pro
The renovation project consists of the creation of a new mri suite located on the 3rd floor of tower d and renovation of 2 pacu rooms into 3 pacu bays on the 3rd floor of tower c. — children’s medical center dallas
TDLR project registrationRenovation/AlterationReview Complete2,923 sq ft$3.0M est.- Project #
- TABS2026018062
- Tenant / owner
- Children’s D3 Low Field Mri
- Design firm
- Pro
- Contact
- Pro
The project involves the equipment replacement in operating room cath/hybrid 1. — children’s medical center dallas
TDLR project registrationRenovation/AlterationInspection Complete1,088 sq ft$1.2M est.- Project #
- TABS2026014827
- Tenant / owner
- Childrens Cath Lab C3375 - Equipment Replacement
- Design firm
- Pro
- Contact
- Pro
The project scope includes conversion of 12 universal patient rooms into nicu patient rooms. additional access control will be added along with a new scrub sink. — children’s medical center dallas
TDLR project registrationRenovation/AlterationInspection Complete10,028 sq ft$355K est.- Project #
- TABS2026010304
- Tenant / owner
- Children’s Universal Nicu Conversion
- Design firm
- Pro
- Contact
- Pro
Renovation of existing ir for engineering department relocation to include workstations and equipment storage. architecture to include renovations of walls, ceilings, and floors. mept to include new light fixtures, hvac, power and data receptacles, — children's medical center dallas
TDLR project registrationRenovation/AlterationProject Closed1,090 sq ft$625K est.- Project #
- TABS2025024264
- Tenant / owner
- D3 Low Field Mri - C1 Htm Maint/Workshop Relocation
- Design firm
- Pro
- Contact
- Pro
Renovation of existing ir room to become fitted out for pharmacy operation. architecture to include new walls to achieve fire rating, door, ceilings, and millwork. mept to include new light fixtures, power and data receptacles, handwash sink and secu — children's medical center dallas
TDLR project registrationRenovation/AlterationProject Closed1,283 sq ft$1.5M est.- Project #
- TABS2025022075
- Tenant / owner
- Childrenren's Mcd Specialty Pharmacy
- Design firm
- Pro
- Contact
- Pro
Children’s health plans divide the room into two offices. no update to flooring but will update lighting. — children's medical center - dallas
TDLR project registrationRenovation/AlterationReview Complete179 sq ft$150K est.- Project #
- TABS2025005757
- Tenant / owner
- Children’s C3 Room Update
- Design firm
- Pro
- Contact
- Pro
Children’s health plans to upgrade the flooring, lighting, relocate an existing staff lounge and adjusting office spaces. — children's medical center - dallas
TDLR project registrationRenovation/AlterationProject Closed3,438 sq ft$300K est.- Project #
- TABS2025003213
- Tenant / owner
- Children’s B3
- Design firm
- Pro
- Contact
- Pro
Children’s health plans to upgrade the flooring, lighting and adding some millwork for display. — children's medical center - dallas
TDLR project registrationRenovation/AlterationProject Closed1,148 sq ft$350K est.- Project #
- TABS2025003046
- Tenant / owner
- Children’s Chapel Refresh
- Design firm
- Pro
- Contact
- Pro
Children’s health plans to upgrade equipment in the cath lab room at children's medical center dallas. interior scope includes one modifying one door, replacing flooring and lighting — children’s health system of texas
TDLR project registrationRenovation/AlterationProject Closed1,088 sq ft$750K est.- Project #
- TABS2025002621
- Tenant / owner
- Cmcd Cath Lab Equip. Replacement
- Design firm
- Pro
- Contact
- Pro
Children’s health plans to upgrade equipment in (2) radiology rooms at children's medical center dallas. interior scope includes one replaced door, and new millwork, flooring, lighting, and ceiling grids and tiles. — children's medical center - dallas
TDLR project registrationRenovation/AlterationProject Closed590 sq ft$1.2M est.- Project #
- TABS2024006225
- Tenant / owner
- Children’s Main Rad. Diagnostic Equip. Replacement
- Design firm
- Pro
- Contact
- Pro
Renovation of (2) existing space into wellness space, one indoor suite and one outdoor area. scope includes relocated and new doors, walls, flooring, lighting, and plumbing. — children’s health system of texas
TDLR project registrationRenovation/AlterationProject Closed4,532 sq ft$1.2M est.- Project #
- TABS2023025259
- Tenant / owner
- Children’s Employee Wellness Center
- Design firm
- Pro
- Contact
- Pro
The scope of work consists of finish upgrades to the existing staff locker/lounge and restrooms, as well as a few offices. — children's health system of texas
TDLR project registrationRenovation/AlterationProject Closed3,560 sq ft$1.5M est.- Project #
- TABS2023016379
- Tenant / owner
- Peri-Op Refresh
- Design firm
- Pro
- Contact
- Pro
Replace 3 existing ahus with equivalent capacity/performance equipment (ahu 2-1, 2-2. 2-3). the scope includes new roof, new structural platforms for the units to sit on, minor interior renovations to locate vfds inside of a vestibule and add a door. — children's health system of texas
TDLR project registrationRenovation/AlterationProject Closed4,150 sq ft$3.6M est.- Project #
- TABS2023015503
- Tenant / owner
- Tower C Ahu Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1935 Medical District Drive
What is being built at 1935 Medical District Drive?
TDLR records describe several renovations at Children’s Medical Center Dallas, including a new MRI suite, converting 12 patient rooms for NICU use, and replacing equipment. The site is multi-tenant, and the filings concern work inside existing space.
Is a new hospital being built at 1935 Medical District Drive?
The available TDLR registrations describe alterations to existing medical-center space, not construction of a new hospital building. Filings run from January 16 to October 5, 2026.
What is the MRI project at Children’s Medical Center Dallas?
A TDLR registration dated April 20, 2026, describes creating an MRI suite on Tower D’s third floor and renovating two PACU rooms into three bays on Tower C’s third floor. The registration is TABS2026018062.
Are patient rooms being converted to NICU rooms?
Yes. A January 16, 2026, TDLR registration describes converting 12 universal patient rooms into NICU rooms, with added access control and a scrub sink. The filing is TABS2026010304.
What work is planned near Building UL07 Orthopaedics on Harry Hines Boulevard?
At 1935 Medical District Drive, nearby Building UL07 Orthopaedics at 5303 Harry Hines Boulevard, TDLR records describe medical-center renovations including an MRI suite, NICU room conversions and equipment replacements. The listed work at 1935 is within existing space.
When were the renovations at 1935 Medical District Drive permitted?
The TDLR registrations in the records are dated January 16, March 12, April 20, April 23 and October 5, 2026. They cover NICU rooms, cath lab equipment, an MRI suite, carousel equipment and an office alteration.
Also being built nearby
All of 75235- 1935 Medical Distrct Drive · Children’s HealthNov 25, 2025Children’s mcd specialty pharmacy eq replacement — renovation/alteration — architecture scope to be minimal, the means of egress, egress components and travel distances associated with this equipment replacement will not change the existing travel distances
- 1935 Medical District Dr · Children's Health System Of TexasNov 3, 2026Bu zo interior renovation of existing pharmacy. scope of work includes mechanical upgrades and architectural finish replacements
- 5011 Harry Hines BlvdOct 28, 2026Install a new commercial contract kiosk at the designated location · 159 m away
- 5151 Harry Hines Blvd · Ut Southwestern Medical CenterMar 24, 2026Utsw zl0.306 r&f replacement — renovation/alteration — to accommodate new siemens imaging equipment in existing space - 306 square feet · 192 m away
- 5161 Harry Hines Blvd · Ut Southwestern Medical Center Of DallasSep 12, 202412068 - cs6.510 renovation — renovation/alteration — renovate an existing clinical office space for new administrative office · 197 m away
- 4900 Harry Hines BlvdOct 22, 2025Adding 23 hospital-grade gfci receptacles - running off of pre-existing circuits · 233 m away
- 5200 Harry Hines Blvd · Dallas County Hospital District D/B/A Parkland HealthNov 13, 2026Cardiac ep lab sheel build out — renovation/alteration — scope of work includes building out the cardiac ep lab, control room and scrub sink area which is approximately 1,351 s.f. of shell space. upgrades to interior finishes, mechanical, plumbing, electrical and low voltage as required by equipment vendor · 299 m away
- 5222 Southwestern Medical AveJul 9, 2025Install 7 pole lights from old parkland parking garage to harry hines along path · 383 m away
- 5223 Southwestern Medical AveJan 26, 2021Electrical repairs · 391 m away
- 2350 N Stemmons Fwy · Children's HealthMar 26, 2026Replacing an ats · 407 m away
- 5303 Harry Hines Blvd · State Of TexasMay 13, 2026Building ul07 orthopaedics — renovation/alteration — renovation of clinic space on level 07 of the aston building (u) · 453 m away
- 2055 Kendall DrSep 22, 2025Replace 2 navien water heaters · 463 m away
More warehouses & industrial in 75235, medical facilities in 75235, offices in 75235.