Why public records beat bought leads
Most paid lead services resell the same projects to every contractor in town, usually after the job is already bid. Public filings are different: every commercial project in Texas leaves a paper trail with a city, a county or the state, and that trail starts early. A permit application, a state accessibility registration or a subdivision plat tells you who is building, where, how big, and often who designed it, before anyone calls for bids on the trades.
The catch is that these records are scattered across dozens of systems, each with its own search screen, and none of them email you when something new is filed. The work is in checking them consistently.
The five sources worth checking
- 1
City building permits
The most direct signal. A commercial permit names the address, scope of work, square footage, valuation, and usually the contractor and applicant. Houston, Dallas and Austin all publish permits daily. Trades get the most out of new-building and finish-out permits, which are filed before the trades are hired.
- 2
TDLR project registrations
Under the Texas Architectural Barriers Act, any public or commercial project with an estimated construction cost of $50,000 or more must be registered with the Texas Department of Licensing and Regulation. Each registration lists the owner, the design firm, the estimated cost and start date, statewide, including towns with no online permit search at all.
- 3
Subdivision plats
Before a builder can sell lots, the land has to be platted. In Houston, plats go through the Planning Commission every two weeks with the lot count, acreage and developer. A plat is the earliest sign of a new neighborhood, often six to twelve months before homes start.
- 4
State bids (ESBD)
Texas state agencies post solicitations on the Electronic State Business Daily. If you do public work, this is where state building, renovation and maintenance contracts are announced.
- 5
Site plans and zoning cases
In cities with zoning, like Austin and Dallas, a site plan or zoning case comes before the building permit. It's earlier and less certain, but it tells you what's coming to a corner months ahead.
What this looks like right now
Here are commercial projects filed across Texas in the last few weeks, pulled from the sources above. Each one links to the full filing history for that address.
- 3,697
- commercial projects filed, last 30 days
- 673
- of them 10,000+ sq ft
- 6,116
- residential projects filed
- 909 E Colorado BlvdNov 13, 2026Electrical work and new on aminity pool · 75203
- 6300 Harry Hines Blvd · Pediatric Health Management ServicesNov 13, 2026Zone b level b2_plumbing · 75235
- 16500 Shadybank Dr · Richardson ISDNov 13, 2026Site utilities to with in 5' of building water sewer storm · 75248
- 3600 Presidential Blvd · City Of Austin: Austin AviationNov 13, 2026Aus - uicw west (1) · 78719
- 650 S Griffin St · City Of DallasNov 12, 2026Evolve concepts has been contracted by hyrox to install and subsequently remove three temporary, freestanding modular structures inside the kay bailey hutchinson convention center at 650 s griffin st, dallas, tx 75202 for a hyrox athletic competition. the installation consist of two elevated spectator viewing platforms and one elevated pedestrian course bridge. the structures will be assembled using engineered modular components, with stairs, guardrails and supporting structural elements as detailed in the submitted drawings. all structures are temporary, will be removed following the event, and will not involve permanent modifications to the existing building · 75202
- 4544 Mckinney Ave · Knox Mckinney, LLCNov 12, 2026Storm, sanitary, vent and domestic water · 75205
- 7051 Burleson Rd · Ctx Burleson IndustrialNov 10, 2026Tech west industrial · 78744
- 1720 Lawrence St · Housing Authority Of The City Of AustinNov 9, 2026Eplan: commercial expedited review - *smart housing* new parking garage - also contains maintenance and dog wash. (142662 sq ft) · 78741
How to work a permit lead
A permit is a starting point, not a sale. The contractors who win work from public records tend to follow the same routine:
- Filter hard. Pick the ZIP codes you can actually serve and a minimum size or valuation. A 400 sq ft remodel and a 40,000 sq ft medical office are both "a permit".
- Read the scope. "New shell building" means the interior trades haven't been hired. "Interior finish-out for restaurant" means kitchen, MEP and millwork are still open.
- Find the decision maker. The general contractor on the permit is your call if you're a sub or supplier. If there's no GC yet, the owner and the architect are.
- Move early and often. The first sub to call a GC with a relevant number usually gets the bid list. A lead that's three weeks old is often already bought out.
- Track the address. Projects file more than once: foundation, building, MEP, fire, certificate of occupancy. Each new filing tells you where the job stands.
groundranger Pro
Get new filings without the searching
Everything above, checked for you every morning. Pick your ZIP codes and the kind of work you want, and we email you new filings with the owner, contractor and design firm already attached.
Can you get construction leads for free?
Yes. Every source on this page is public, and you can check them yourself at no cost. City permit portals, the TDLR project search and the ESBD are all free. What costs you is time: checking several sites every morning, cleaning up addresses, and remembering which projects you've already seen.
On groundranger, every address with a filing has a free public page, and you can get free alerts for any address or ZIP code. A paid plan adds the owner, contractor and design firm on each filing, alerts by project type, size and value, and exports for your CRM.
Construction leads by city
Each city publishes permits differently. These guides cover how to search each one and what's being filed there now.
Questions
What is the best source of commercial construction leads in Texas?
City building permits and TDLR project registrations. Permits are the most detailed and are filed before the trades are hired. TDLR registrations cover every Texas public or commercial project of $50,000 or more, including towns without an online permit search, and list the owner and design firm.
Are building permit leads free?
The records are free public information. You can search city portals and the TDLR project database yourself. Services like groundranger charge for collecting them in one place, adding contact details, and sending alerts when new ones are filed.
How early do permits show up before construction starts?
A commercial building permit is usually filed weeks to months before work starts, and before most subcontractors are hired. Plats and site plans show up even earlier, sometimes a year ahead.
Who should I contact on a permit lead?
If you're a subcontractor or supplier, the general contractor listed on the permit. If no contractor is listed yet, the owner or the architect of record.