Look up the address
If you know the address, or even the street, search it here. You'll see every permit and project filing on record for it, with the newest first.
Where the answer is filed
Almost nothing gets built in a Texas city without a filing. Which one you'll find depends on how far along the project is:
- 1
Months ahead: plats and zoning
A new subdivision or a large lot split starts with a plat. In cities with zoning (Dallas, Austin, San Antonio), a rezoning or site plan comes first too, often with a public hearing and a sign posted on the property.
- 2
Weeks ahead: permits
Before work starts, the builder files a building permit with the city. It describes what's going up: "new 2-story single family residence", "new retail shell building", "demolition of existing structure".
- 3
Commercial projects: TDLR
Any commercial or public project of $50,000 or more is registered with the state's TDLR, with the owner, architect, estimated cost and start date. This is often the clearest description of a store, clinic or office going up.
Clues you can read from the street
- The permit card. Texas cities require the permit to be posted on site, usually on the fence or a window. The permit number on it is the fastest way to look it up.
- Zoning or plat signs. A sign announcing a public hearing names the case number and the hearing date.
- The fence banner. Builders and developers often put their name on the screening fence; search their name to see their other projects.
- Utility marks. Fresh paint marks on the curb mean utility locates, usually days before digging.
New subdivisions in Houston
Houston has no zoning, so new neighborhoods show up first as plats before the Planning Commission. Here's what was on recent agendas.
- 661
- plats on the agenda, last 90 days
- 6,620
- lots proposed
- 26,655
- acres platted
- Haddick PlaceDec 3, 20263 lots · 0.29 ac · Single Family Residential (Public Street) · East Houston
- ARG Chetti HoldingsDec 3, 20261.20 ac · Commercial · 77406
- Reserve at Spring BranchDec 3, 202670 lots · 4.65 ac · Landscape or Open Space; Residential Guest Parking; Single Family Residential (PAE 1/PAE 2) · Spring Branch Central
- Morse Street ViewsDec 3, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Neartown - Montrose
- Northwest Place Partial ReplatDec 3, 202614.71 ac · Unrestricted · Fairbanks / Northwest Crossing
- Spring Dell DevelopmentDec 3, 20260.61 ac · Unrestricted; Commercial · 77388
groundranger Pro
Know before the fence goes up
Everything above, checked for you every morning. Pick your ZIP codes and the kind of work you want, and we email you new filings with the owner, contractor and design firm already attached.
Get told about new construction automatically
Checking city websites every week isn't realistic. With a free groundranger account you can watch your address or ZIP code and get an email when something new is filed nearby. A Pro plan adds radius alerts around any address, filters by project type and size, and the owner and builder on every filing.
By city
Questions
How do I find out what is being built on a lot near me?
Look for the permit posted on site and search its number, or search the address on the city's permit portal or on groundranger. For commercial projects, the TDLR project registration usually describes the building, the owner and the architect.
Can I find out what's being built before construction starts?
Often, yes. Plats, zoning cases and building permits are all filed before work begins. A permit is typically filed weeks ahead; a plat or zoning case can be months ahead.
Who do I contact with concerns about a nearby project?
The city department that issued the permit, or for zoning and plats, the planning department before the public hearing. The case or permit number on the posted sign is the fastest way to get to the right person.
