groundranger
Active · latest filing Nov 2026Commercial

650 S Griffin St

Dallas, TX 75202 · City Of Dallas

Permits describe temporary 500,000-square-foot FIFA broadcast center

Records describe new, temporary single-story offices and studio rooms totaling 500,000 square feet for the FIFA International Broadcasting Center at the Kay Bailey Hutchison Convention Center. The project record is dated January 14, 2026, and TDLR lists an applicant-estimated project cost of $20 million. Later Dallas permits cover temporary broadcast buildout and modular structures for a HYROX athletic competition.

Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 12, 2026

Projects
31
31 filings
Latest filing
Nov 12, 2026
since Jun 3, 2025
Largest scope
500,000 sf
Estimated cost
$20M
state registration

Permit & project history

31 projects
  1. Evolve concepts has been contracted by hyrox to install and subsequently remove three temporary, freestanding modular structures inside the kay bailey hutchinson convention center at 650 s griffin st, dallas, tx 75202 for a hyrox athletic competition. the installation consist of two elevated spectator viewing platforms and one elevated pedestrian course bridge. the structures will be assembled using engineered modular components, with stairs, guardrails and supporting structural elements as detailed in the submitted drawings. all structures are temporary, will be removed following the event, and will not involve permanent modifications to the existing building

    Evolve concepts has been contracted by hyrox to install and subsequently remove three temporary, freestanding modular structures inside the kay bailey hutchinson convention center at 650 s griffin st, dallas, tx 75202 for a hyrox athletic competition. the installation consist of two elevated spectator viewing platforms and one elevated pedestrian course bridge. the structures will be assembled using engineered modular components, with stairs, guardrails and supporting structural elements as detailed in the submitted drawings. all structures are temporary, will be removed following the event, and will not involve permanent modifications to the existing building

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002668
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Electrical service installation

    Electrical service installation

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-002294
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Q-team - site work - foundation and concrete procurement zones a/c piers only

    Q-team - site work - foundation and concrete procurement zones a/c piers only

    City of Dallas permitPhase - New Construction
    Record
    COM-PH-NEW-26-000490
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Q-team - piers only - foundation and concrete procurement zones a/c piers only

    Q-team - piers only - foundation and concrete procurement zones a/c piers only

    City of Dallas permitPhase - New Construction
    Record
    COM-PH-NEW-26-000473
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000114
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000115
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000111
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000110
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast

    Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000450
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Project scope includes the construction of a temporary wall to divide the convention center activities and active construction within the dallas memorial arena.the arena will not be occupied for normal use outside of construction demolition and logistics. assumed max occupant load has been provided by the cmar.all other demolition and construction activities within the area will be covered under separate permit packages to be submitted and issued at a later date

    Project scope includes the construction of a temporary wall to divide the convention center activities and active construction within the dallas memorial arena.the arena will not be occupied for normal use outside of construction demolition and logistics. assumed max occupant load has been provided by the cmar.all other demolition and construction activities within the area will be covered under separate permit packages to be submitted and issued at a later date

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000319
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000036
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000035
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast

    Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000456
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000016
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast.per sections 1014 and 1015.2, handrails shall be continuous along the open walking surface. guardrails shall be provided on both sides of any open walking surface or stairway where the drop exceeds 30 inches. any open walking path shall comply with these requirements

    Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast.per sections 1014 and 1015.2, handrails shall be continuous along the open walking surface. guardrails shall be provided on both sides of any open walking surface or stairway where the drop exceeds 30 inches. any open walking path shall comply with these requirements

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000459
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. New temporary construction of single-story offices and studio rooms (500,000 sq ft) — kay bailey hutchison convention center dallas

    TDLR project registrationAdditions to Existing BuildingInspection Complete500,000 sq ft$20M est.
    Tenant / owner
    Fifa International Broadcasting Center
    Design firm
    Pro
    Contact
    Pro
  17. Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast.per sections 1014 and 1015.2, handrails shall be continuous along the open walking surface. guardrails shall be provided on both sides of any open walking surface or stairway where the drop exceeds 30 inches. any open walking path shall comply with these requirements

    Temporary buildout inside the kbhcc to support fifa world cup 2026 broadcast.per sections 1014 and 1015.2, handrails shall be continuous along the open walking surface. guardrails shall be provided on both sides of any open walking surface or stairway where the drop exceeds 30 inches. any open walking path shall comply with these requirements

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001885
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000015
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Provide electrical wiring and lighting including feeds for future gate and guard shack

    Provide electrical wiring and lighting including feeds for future gate and guard shack

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003565
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Provide tag, trace, and disconnection of power to allow for demolition of halls d, e, and f. re-route and re-feed electrical devices/equipment and fire alarm to maintain areas not being affected by demolition

    Provide tag, trace, and disconnection of power to allow for demolition of halls d, e, and f. re-route and re-feed electrical devices/equipment and fire alarm to maintain areas not being affected by demolition

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003566
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  21. We've been contracted as a third party vendor by hyrox to install three temporary scaffolding structures (1x pedestrian bridge and 2x viewing platforms) at their athletic competition at the convention center

    We've been contracted as a third party vendor by hyrox to install three temporary scaffolding structures (1x pedestrian bridge and 2x viewing platforms) at their athletic competition at the convention center

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001713
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  22. Installation of an 8' tall braced partition to provide a defined pedestrian route between the omni hotel and hall c. the partition serves as a barrier so users are prevented from entering a decommissioned building (hall d). no services are being connected or disconnected in relation to this permit. this wall in non-combustible with gyp finish on one side

    Installation of an 8' tall braced partition to provide a defined pedestrian route between the omni hotel and hall c. the partition serves as a barrier so users are prevented from entering a decommissioned building (hall d). no services are being connected or disconnected in relation to this permit. this wall in non-combustible with gyp finish on one side

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000899
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. The project consists of work to cap and recirculate chilled water loops that bridge between halls c & d, which will be interrupted by the demolition of hall d in the future. this application does not include demolition of hall d, only the chilled water line work needed to prepare for that demolition to take place. the second aspect of the work is the demolition of an existing, exterior egress stair and construction of replacement egress stairs as well as a vehicular ramp from the truck dock level down to the ground plane, eventually exiting (one-way, right turn only) onto griffin st

    The project consists of work to cap and recirculate chilled water loops that bridge between halls c & d, which will be interrupted by the demolition of hall d in the future. this application does not include demolition of hall d, only the chilled water line work needed to prepare for that demolition to take place. the second aspect of the work is the demolition of an existing, exterior egress stair and construction of replacement egress stairs as well as a vehicular ramp from the truck dock level down to the ground plane, eventually exiting (one-way, right turn only) onto griffin st

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000154
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  24. Add one wall mount strobe device to the existing fire alarm system

    Add one wall mount strobe device to the existing fire alarm system

    City of Dallas permitFire Alarm (FA) Commercial Renovation
    Record
    2008211088
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  25. Provide & install 6 each fire sprinkler heads - existing office area

    Provide & install 6 each fire sprinkler heads - existing office area

    City of Dallas permitFire Sprinkler (Minor Work) (FS) Commercial New Construction$6
    Record
    2009091057
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  26. Repair water main & isntall 4" rpz for cooling tower make up

    Repair water main & isntall 4" rpz for cooling tower make up

    City of Dallas permitPlumbing (PL) Commercial Alteration$1
    Record
    2004096005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  27. Temporary bleachers for cheer competition

    Temporary bleachers for cheer competition

    City of Dallas permitBuilding (BU) Commercial Alteration$1
    Record
    2002215005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  28. Temporary grandstands/stadium seating

    Temporary grandstands/stadium seating

    City of Dallas permitBuilding (BU) Commercial Alteration$1
    Record
    2002195008
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  29. Temporary staging; up 02/12/2020 & down 02/18/2020

    Temporary staging; up 02/12/2020 & down 02/18/2020

    City of Dallas permitBuilding (BU) Commercial Alteration$1
    Record
    2001295007
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  30. Special event temp bleachers up 9-2-19 down 9-9-19

    Special event temp bleachers up 9-2-19 down 9-9-19

    City of Dallas permitBuilding (BU) Commercial Alteration$1
    Record
    1908295008
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  31. 4 each 6 row x 30' long chair risers systems; install 08-27-2019; dismantle 08-30-2019

    4 each 6 row x 30' long chair risers systems; install 08-27-2019; dismantle 08-30-2019

    City of Dallas permitBuilding (BU) Commercial Alteration$84
    Record
    1908225009
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas · Texas Department of Licensing and Regulation

Questions about 650 S Griffin St

What is being built at 650 S Griffin St in Dallas?

Records describe temporary, single-story offices and studio rooms totaling 500,000 square feet for the FIFA International Broadcasting Center at the Kay Bailey Hutchison Convention Center. The project record is dated January 14, 2026.

Is the FIFA International Broadcasting Center at 650 S Griffin St temporary?

The project description identifies the offices and studio rooms as temporary construction. A separate Dallas permit dated February 25, 2026, covers a temporary buildout inside the convention center to support FIFA World Cup 2026 broadcast.

How much is the FIFA broadcast center project estimated to cost?

TDLR lists an applicant-estimated cost of $20 million for the project. This is an estimate for the whole project, not a total compiled from individual permit valuations.

Are there permits for HYROX structures at the convention center?

Yes. A Dallas permit filed November 12, 2026, describes three temporary modular structures for a HYROX athletic competition: two spectator platforms and a pedestrian course bridge. The permit says the structures will be removed after the event.

What's being built near Dallas Mock Store on S Akard Street?

The FIFA International Broadcasting Center project at 650 S Griffin St is about 475 meters from Dallas Mock Store, according to the nearby-project records. It is described as temporary offices and studio rooms at the convention center.

What permits were filed for the FIFA broadcast center in Dallas?

The project record for the 500,000-square-foot temporary offices and studio rooms is dated January 14, 2026. Other Dallas permits include a temporary broadcast buildout filed February 25, 2026, and HYROX event structures filed November 12, 2026.

Also being built nearby

All of 75202

More demolitions in 75202, gyms & fitness in 75202, hotels in 75202.

Get alerts for 650 S Griffin St