555 S Lamar St
Dallas, TX 75202
Temporary event stages and building work at 555 S Lamar
City of Dallas permits at 555 S Lamar cover electrical remodeling, temporary outdoor stages for events, and plumbing work. The filings run from July 2, 2025, through November 2, 2026; the latest permit covers replacing a backflow device in a second-floor laundry room.
Summarized from City of Dallas records · updated Nov 2, 2026
- Projects
- 9
- 9 filings
- Latest filing
- Nov 2, 2026
- since Jul 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
9 projectsThis permit is for a stage, bleacher, or other structure and is required for an open special event permit
This permit is for a stage, bleacher, or other structure and is required for an open special event permit
City of Dallas permitCommercial Alteration Addition PermitWe are building a temporary stage outside in front of the building for a private event we are hosting for in house clients
We are building a temporary stage outside in front of the building for a private event we are hosting for in house clients
City of Dallas permitCommercial Alteration Addition Permit125 kw generator with 200 amp load centers with 10/5 cable and gfi quad box stringers and cable ramp
125 kw generator with 200 amp load centers with 10/5 cable and gfi quad box stringers and cable ramp
City of Dallas permitElectrical (EL) Commercial Alteration$2Power with 60 kw generator to 4 x 100 amp rack to two 100 amp load center then to booths with 10/5 w
Power with 60 kw generator to 4 x 100 amp rack to two 100 amp load center then to booths with 10/5 w
City of Dallas permitElectrical (EL) Commercial Alteration$25
Sources: City of Dallas
Questions about 555 S Lamar St
What is being built at 555 S Lamar St?
The permits describe temporary outdoor stages for events, electrical remodeling, and plumbing work—not a new permanent building. A July 2, 2025, permit was for an electrical remodel.
Are they building a stage at 555 S Lamar?
City permits describe temporary outdoor stages. A January 16, 2026, permit says a stage would be built outside in front of the building for a private event.
When was the latest permit filed for 555 S Lamar?
The latest filing in the records is dated November 2, 2026. Permit COM-PLM-26-004166 covers replacing a backflow device in a second-floor laundry room.
What work is planned near the FIFA International Broadcasting Center?
At 555 S Lamar, about 155 meters from the FIFA International Broadcasting Center, permits describe temporary event stages and building work. The October 2, 2026, permit, COM-ALT-ADD-26-002410, is for a stage, bleacher, or other structure required for an open special event permit.
What permits have been filed for 555 S Lamar St in Dallas?
The five City of Dallas filings cover an electrical remodel, temporary event stages, and replacement of a backflow device. The filings date from July 2, 2025, to November 2, 2026.
Also being built nearby
All of 75202- 650 S Griffin St · City Of DallasNov 12, 2026Evolve concepts has been contracted by hyrox to install and subsequently remove three temporary, freestanding modular structures inside the kay bailey hutchinson convention center at 650 s griffin st, dallas, tx 75202 for a hyrox athletic competition. the installation consist of two elevated spectator viewing platforms and one elevated pedestrian course bridge. the structures will be assembled using engineered modular components, with stairs, guardrails and supporting structural elements as detailed in the submitted drawings. all structures are temporary, will be removed following the event, and will not involve permanent modifications to the existing building · 155 m away
- 703 Wood StDec 16, 2020Permanent electrical service · 231 m away
- 900 Jackson Street · Charter Founders Square LLCJul 31, 2024State farm — renovation/alteration — tenant improvements · 243 m away
- 900 Jackson StNov 11, 2020Interior remodel only · 243 m away
- 800 Jackson Street · Metro Dallas Downtown Investments I, LLCSep 15, 2025Home2 suites dallas downtown — renovation/alteration — adaptive reuse 50k sq ft with 50k additio · 251 m away
- 800 Jackson StMay 22, 2025Qteam we are transforming a 5-story office building that was built in 1913 into a 7-story hotel—a full-scale commercial renovation and vertical expansion project. this includes repurposing the existing structure for hospitality use, adding two new floors, and redesigning the interior and exterior to meet modern hotel standards. at the same time, we are creating a beautiful, welcoming space for members of the community to enjoy—whether they're visiting guests, attending events, or simply looking for a vibrant place to connect, relax, and feel at home · 251 m away
- 606 Young StJan 25, 2021Install fence · 252 m away
- 706 N Griffin StSep 30, 2026Demolish building. haul off debris. no trees · 253 m away
- 400 S Record StMay 19, 202626.0111 1st floor lobby rrsreworking existing hvac system · 287 m away
- 700 Jackson StDec 6, 2025The proposed project will have a 252.30 kwp/180 kw carport solar pv system, which will be installed on the 12th floor of the parking garage · 289 m away
- 1122 Jackson StJun 1, 2026Removal of existing hvac system and installation of new hvac system · 291 m away
- 205 S Lamar StJun 18, 2025Relocate gas meter for atmos · 324 m away