900 Jackson St
Dallas, TX 75202
900 Jackson St: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 900 Jackson St, Dallas, TX 75202. The most recent, filed November 11, 2020, covers: “Interior remodel only”.
Compiled from City of Dallas records · updated Nov 11, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Nov 11, 2020
- since Nov 11, 2020
- Largest scope
- —
- Listed value
- $3
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 900 Jackson St
What is being built at 900 Jackson St?
The latest filing (City of Dallas permit 2011041155, November 11, 2020) covers interior remodel only.
How many permits and filings does 900 Jackson St have?
2 filings across 2 projects, from November 11, 2020 to November 11, 2020.
How much is the construction at 900 Jackson St worth?
Permits at this address list about $3 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Charter Founders Square in Dallas?
900 Jackson St is about 0 m from Charter Founders Square (900 Jackson Street). Its latest filing is for interior remodel only.
Is there other construction near 900 Jackson St?
Yes. Nearby filings include 900 Jackson Street (state farm — renovation/alteration — tenant improvements, Jul 31, 2024); 205 S Lamar St (relocate gas meter for atmos, Jun 18, 2025); 800 Jackson Street (home2 suites dallas downtown — renovation/alteration — adaptive reuse 50k sq ft with 50k additio, Sep 15, 2025).
How do I get alerts for new permits at 900 Jackson St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75202- 900 Jackson Street · Charter Founders Square LLCJul 31, 2024State farm — renovation/alteration — tenant improvements
- 205 S Lamar StJun 18, 2025Relocate gas meter for atmos · 83 m away
- 800 Jackson Street · Metro Dallas Downtown Investments I, LLCSep 15, 2025Home2 suites dallas downtown — renovation/alteration — adaptive reuse 50k sq ft with 50k additio · 84 m away
- 800 Jackson StMay 22, 2025Qteam we are transforming a 5-story office building that was built in 1913 into a 7-story hotel—a full-scale commercial renovation and vertical expansion project. this includes repurposing the existing structure for hospitality use, adding two new floors, and redesigning the interior and exterior to meet modern hotel standards. at the same time, we are creating a beautiful, welcoming space for members of the community to enjoy—whether they're visiting guests, attending events, or simply looking for a vibrant place to connect, relax, and feel at home · 84 m away
- 1003 Commerce StMar 26, 2026New 220 units apartment complex with parking struture · 110 m away
- 1100 Commerce StJun 3, 2025Install new rpz in penthouse for chemical treatment system · 140 m away
- 1122 Jackson StJun 1, 2026Removal of existing hvac system and installation of new hvac system · 145 m away
- 1200 Main StNov 3, 2026Draining and removing an existing 50 gallon electric low boy water heater. installing a new 50 gallon electric low boy water heater in its place · 168 m away
- 700 Jackson StDec 6, 2025The proposed project will have a 252.30 kwp/180 kw carport solar pv system, which will be installed on the 12th floor of the parking garage · 174 m away
- 901 Main Street · Bank Of America PlazaAug 20, 2026Hbg design expansion — renovation/alteration — tenant improvement · 180 m away
- 901 Main St · Dallas Main LPOct 27, 2026Reconfigure existing ductwork for new office expansion on suite 3840 · 180 m away
- 901 Main Street 3350 · Bank Of America PlazaMar 25, 2026Better business bureau — renovation/alteration — tenant improvement · 180 m away