901 Main St
Dallas, TX 75202 · Nortex Spine And Joint, Vsp 69 Floor
Office renovations and suite expansion at 901 Main St
City of Dallas permits indicate office renovations and an expansion in suite 3840 at 901 Main St. The first filing was May 21, 2025, and the latest listed permit, dated October 27, 2026, covers reconfiguring existing ductwork for the office expansion. Other permits cover interior work and improvements to a corridor and restrooms.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 27, 2026
- Projects
- 64
- 64 filings
- Latest filing
- Oct 27, 2026
- since Oct 12, 2020
- Largest scope
- 1,080 sf
- Estimated cost
- $250K
- state registration
Permit & project history
64 projectsInterior renovation of office space. renovation scope of work includes selective demolition, construction of interior no-structural partitions, and finish updates
Interior renovation of office space. renovation scope of work includes selective demolition, construction of interior no-structural partitions, and finish updates
City of Dallas permitCommercial Alteration Addition PermitDemolition and install new urinals, water closets, lavatories, drinking fountain and point of use water heaters
Demolition and install new urinals, water closets, lavatories, drinking fountain and point of use water heaters
City of Dallas permitCommercial Plumbing PermitBurns charest rr & corridor- mcr this permit is for suites 5700 & 5800 tenant improvement of restrooms and corridor
Burns charest rr & corridor- mcr this permit is for suites 5700 & 5800 tenant improvement of restrooms and corridor
City of Dallas permitCommercial Electrical PermitMcr the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, and plumbing.remodel of non-loadbearing walls only. co will need to be obtained prior to occupancy. all work subject to field inspectors approval
Mcr the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, and plumbing.remodel of non-loadbearing walls only. co will need to be obtained prior to occupancy. all work subject to field inspectors approval
City of Dallas permitCommercial Alteration Addition PermitProvide and install (1) new single bowl sink, (1) new faucet, (1) new point of use water heater, (1) hub drain, (1) new trap primer, (1) new flood stop
Provide and install (1) new single bowl sink, (1) new faucet, (1) new point of use water heater, (1) hub drain, (1) new trap primer, (1) new flood stop
City of Dallas permitCommercial Plumbing PermitInterior renovation/alteration — bank of america
TDLR project registrationRenovation/AlterationProject Closed1,080 sq ft$180K est.- Project #
- TABS2024014030
- Tenant / owner
- Nortex Spine And Joint
- Design firm
- Pro
- Contact
- Pro
Capital improvement — bank of america plaza
TDLR project registrationRenovation/AlterationProject Closed15,554 sq ft$250K est.- Project #
- TABS2023017049
- Tenant / owner
- Vsp 69 Floor
- Design firm
- Pro
- Contact
- Pro
+ 24 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 901 Main St
What is being built at 901 Main St in Dallas?
City of Dallas permits describe office renovations and an expansion in suite 3840, along with interior electrical, plumbing and mechanical work.
When were permits filed for work at 901 Main St?
The records span May 21, 2025, through October 27, 2026. The latest listed permit, COM-MEC-26-002751, was filed October 27, 2026.
Is a new office building being built at 901 Main St?
The available permit descriptions focus on remodeling existing office space and expanding a suite. They do not describe construction of a new building.
What work is planned for suite 3840 at 901 Main St?
A City of Dallas mechanical permit filed October 27, 2026, describes reconfiguring existing ductwork for a new office expansion in suite 3840.
Are there renovations to the corridors or restrooms at 901 Main St?
Yes. A June 9, 2026, alteration permit, COM-ALT-ADD-26-001256, covers improvements to the 33rd-floor corridor and restrooms.
What does the office renovation at 901 Main St include?
A May 26, 2026, permit, COM-ALT-ADD-26-000958, describes selective demolition, nonstructural interior partitions and finish updates in office space.
Also being built nearby
All of 75202- 901 Main Street · Dallas Main LPDec 9, 2024Clark hill - dallas, remodel — renovation/alteration — (3,307 sq ft2) interior remodel of the building's 60th and 61st floor tenant spaces; offices, copy rooms, it storage rooms, conference, jury box and wellness rooms
- 901 Main St Level 62 · Bank Of America TowerMay 8, 2025Touchstone bernays — renovation/alteration — combining three suites into one on a multi-tenant floor
- 901 Main Street · Bank Of America PlazaAug 20, 2026Hbg design expansion — renovation/alteration — tenant improvement
- 901 Main Street 3350 · Bank Of America PlazaMar 25, 2026Better business bureau — renovation/alteration — tenant improvement
- 901 Main St. 39th · Bank Of America PlazaAug 11, 2025Cowles & thompson — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, and plumbing
- 901 Main Street 33rd · Bank Of AmericaMar 25, 202633rd floor common areas — renovation/alteration — tenant improvement
- 1200 Main StNov 3, 2026Draining and removing an existing 50 gallon electric low boy water heater. installing a new 50 gallon electric low boy water heater in its place · 13 m away
- 801 Main StJul 31, 2026Demolition and pour back existing siewalk · 87 m away
- 907 Elm StJun 22, 2026Install nine foot high security fence · 89 m away
- 1003 Commerce StMar 26, 2026New 220 units apartment complex with parking struture · 98 m away
- 205 S Lamar StJun 18, 2025Relocate gas meter for atmos · 99 m away
- 1015 Elm StDec 28, 2020Supergraphics change copy · 111 m away