901 Main St Level 62
Dallas, TX 75202 · Bank Of America Tower
Three suites to be combined on Level 62 of Bank of America Tower
A 23,000-square-foot office renovation will combine three suites into one on Level 62 at 901 Main St. A TDLR project registration naming Touchstone Bernays was filed May 8, 2025. The applicant estimated the project cost at $2 million.
Summarized from Texas Department of Licensing and Regulation records · updated May 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 8, 2025
- since May 8, 2025
- Largest scope
- 23,000 sf
- Estimated cost
- $2.0M
- state registration
Where this project stands
Inspected · closing outTouchstone Bernays
23,000 sq ft · $2.0M est.
- RegisteredMay 8, 2025
- Plan review
- ConstructionMay '25 – Dec '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectCombining three suites into one on a multi-tenant floor. — bank of america tower
TDLR project registrationRenovation/AlterationInspection Complete23,000 sq ft$2.0M est.- Project #
- TABS2025018519
- Tenant / owner
- Touchstone Bernays
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 901 Main St Level 62
What is being built at 901 Main St in Dallas?
A TDLR registration describes a renovation combining three suites into one on Level 62 of Bank of America Tower. The project is listed at 23,000 square feet.
What is happening on Level 62 of Bank of America Tower?
Three suites are being combined into one, according to TDLR project registration TABS2025018519. The registration was filed May 8, 2025.
Is Touchstone Bernays opening an office at 901 Main St?
The TDLR record names Touchstone Bernays and describes a suite-combination renovation. It does not say whether this is a new office opening.
How much will the Level 62 renovation cost?
The applicant estimated the project cost at $2 million in the TDLR registration. This is an estimate, not a reported final cost.
What is being renovated near Bank of America Plaza in Dallas?
A 23,000-square-foot project on Level 62 of Bank of America Tower will combine three suites into one. The project registration was filed May 8, 2025.
What is the permit number for the Bank of America Tower renovation?
The TDLR project registration number is TABS2025018519. It describes a renovation on Level 62 and was filed May 8, 2025.
Also being built nearby
All of 75202- 901 Main Street · Dallas Main LPDec 9, 2024Clark hill - dallas, remodel — renovation/alteration — (3,307 sq ft2) interior remodel of the building's 60th and 61st floor tenant spaces; offices, copy rooms, it storage rooms, conference, jury box and wellness rooms
- 901 Main Street · Bank Of America PlazaAug 20, 2026Hbg design expansion — renovation/alteration — tenant improvement
- 901 Main St · Dallas Main LPOct 27, 2026Reconfigure existing ductwork for new office expansion on suite 3840
- 901 Main Street 3350 · Bank Of America PlazaMar 25, 2026Better business bureau — renovation/alteration — tenant improvement
- 901 Main St. 39th · Bank Of America PlazaAug 11, 2025Cowles & thompson — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, and plumbing
- 901 Main Street 33rd · Bank Of AmericaMar 25, 202633rd floor common areas — renovation/alteration — tenant improvement
- 1200 Main StNov 3, 2026Draining and removing an existing 50 gallon electric low boy water heater. installing a new 50 gallon electric low boy water heater in its place · 13 m away
- 801 Main StJul 31, 2026Demolition and pour back existing siewalk · 87 m away
- 907 Elm StJun 22, 2026Install nine foot high security fence · 89 m away
- 1003 Commerce StMar 26, 2026New 220 units apartment complex with parking struture · 98 m away
- 205 S Lamar StJun 18, 2025Relocate gas meter for atmos · 99 m away
- 1015 Elm StDec 28, 2020Supergraphics change copy · 111 m away