New demolitions in Dallas 75202
15 addresses in 75202 have permits or project filings for demolitions in the last two years. The most recent was filed at 650 S Griffin St.
Latest filings
- 650 S Griffin St · City Of DallasNov 12, 2026Evolve concepts has been contracted by hyrox to install and subsequently remove three temporary, freestanding modular structures inside the kay bailey hutchinson convention center at 650 s griffin st, dallas, tx 75202 for a hyrox athletic competition. the installation consist of two elevated spectator viewing platforms and one elevated pedestrian course bridge. the structures will be assembled using engineered modular components, with stairs, guardrails and supporting structural elements as detailed in the submitted drawings. all structures are temporary, will be removed following the event, and will not involve permanent modifications to the existing building
- 1445 Ross Ave · 1445 Ross Ave, LLCNov 9, 2026Plumbing demolition
- 1201 Main StNov 2, 2026Zo bc renovation of existing verizon telecom space for new equipment
- 901 Main St · Dallas Main LPOct 27, 2026Reconfigure existing ductwork for new office expansion on suite 3840
- 2323 Victory Ave · Clpf One Victory LP C/O Clarion Partners LLCOct 21, 2026Mcr location address: 2323 victory ave 250 dallas, tx 75219 scope of work:finish out of 9th floor, new finishes throughout, new break room, offices, conference room and open work area
- 1001 Ross Ave · Cc Meyer Properties LLCOct 20, 2026We are going to be adding new receptacles /lights/ switches, on new walls. using existing panels and circuits
- 625 High Market StOct 19, 2026New washing machine box addition
- 211 S Akard St · At&t Level 7 - Interior Finish OutOct 12, 2026Furnish and install (1) chilled water air handling unit with associated ductwork, piping, and supportsfurnish and install (4) fire dampers with associated access doors, fire stopping, ductwork, and supports
- 706 N Griffin StSep 30, 2026Demolish building. haul off debris. no trees
- 801 Main StJul 31, 2026Demolition and pour back existing siewalk
- 1412 Main StJun 23, 2026Electrical remodel
- 1445 Ross Avenue 55th · 1445 Ross Ave, LLCMay 22, 2026Integrity level 55 — renovation/alteration — renovations to corporate office, including demolition of exisiting walls, act ceiling, lighting, and select finishes. construction of new walls, ceiling, and millwork. installation of new lighting, finishes, and furniture
- 1500 Marilla StDec 2, 2025Dallas marathon 2025. staging and event trussing start line, and truss walkway bridge
- 602 S Houston StNov 20, 2025Mcr the project consists of the partial (southern half) demolition of the dallas morning news building
- 603 Munger AveOct 21, 2025Comfort technologies is to provide & install (1) daikin polara 208 volts 1 phase mini-split system with condenser mounted in garage below. (3) brd hushcore acoustic covers for existing water-cooled units. demolition sections of ductwork along with selected grilles, relocate selected supply & return grilles
- 650 S Griffin · City Of DallasJun 17, 2025Kay bailey hutchison convention center enabling works — renovation/alteration — commercial renovation of the kay bailey hutchison convention center consists of demolition of halls d, e, f and vertiport; preservation and enclosure of pedestrian connector between the omni and hall c (to remain); envelope enclosure of hall c end ca
Questions
What demolitions are being built in Dallas 75202?
15 addresses in 75202 have permits or project filings for demolitions in the last two years. The most recent was filed at 650 S Griffin St. Others include 1445 Ross Ave, 1201 Main St, 901 Main St.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.