New demolitions in Dallas 75223
37 addresses in 75223 have permits or project filings for demolitions in the last two years. The most recent was filed at 917 Bank St.
Latest filings
- 917 Bank StNov 13, 2026Demolish and haul away noted basketball court down to base
- 611 Parkview AveNov 13, 2026New construction
- 609 Cordova StNov 10, 2026Nsfaa-demolition old house and build a new construction house
- 3118 Jerome StNov 10, 2026Nsfaa build new house
- 601 Cristler AveNov 9, 20261.structural framing: replace ten (10) 2x6 framing members (joists) and two (2) 4x6 structural support posts.2.subflooring: remove and replace ten (10) sections of subfloor.3.foundation leveling: level the existing house foundation
- 6907 Hammond AveNov 6, 2026New sfd
- 601 S Glasgow DrNov 5, 2026New build. all new waterlines and drains
- 919 Wayne StNov 3, 2026Demolish approx. 2000 sq ft two-story house and detached storage building 900 sq ft includes removing all existing slab
- 6723 Santa Fe AveNov 2, 2026Nsfaa-add/rem proposed renovation and rear addition to the existing one-story contributing bungalow at 6723 santa fe avenue. the project includes demolition of the existing rear wood deck/porch and construction of an approximately 316-square-foot, one-story rear addition and a new approximately 96-square-foot covered rear porch. the addition will be constructed on a pier-and-beam foundation with slab porch areas and will include modifications to the existing roofline to integrate the addition with the existing structure. exterior work includes new 6-inch horizontal wood lap siding, trim, fascia, eave and gable details designed to match the existing residence; new and relocated windows matching the existing single-hung, one-over-one style; new exterior doors, including a rear sliding door; and new composition roofing. the roof will be gaf timberline armorshield ii shingles in weathered wood. exterior paint is proposed as sherwin-williams sw 2829 classical white for the main body, sw 7504 keystone gray for the trim, and sw 6215 rocky river for the door. all new exterior materials and architectural details are intended to be compatible with and match the existing contributing structure and comply with the hollywood/santa monica conservation district requirements
- 5209 Parry AveOct 30, 2026Demolish single home approx. 1200 sq ft sitting on pier and beams. remove all existing slab and concrete steps in front of house
- 1110 Tenison Memorial RdOct 5, 2026Demolition sfdblade cleanclear debrisno tree removal
- 3219 Fairview AveOct 2, 2026New construction/new installation
- 6926 Lindsley AveSep 30, 2026Install a new air conditioning and heating system with ductwork
- 522 S Glasgow DrSep 29, 2026New hvac on a new contstruction of a duplex
- 614 Blair BlvdSep 10, 2026Addition of 670 sq ft
- 905 Grandview AveAug 10, 20268 1/2' wood fence on steel posts and 8' wrought iron fence
- 419 Cristler AveJul 17, 20268 1/2' wood fence on steel posts
- 412 Cristler AveJul 13, 2026Install new hvac for entire house
- 5237 Terry StJul 10, 2026We would like to build an 8 foot board on board pre stained cedar wood fence. it will consist of 242 feet of linear. 5237-5239 terry street
- 704 Fletcher StJul 7, 2026Demolition existing structure \| 704 fletcher st
- 4937 Lindsley AveJun 9, 2026Demolish approx. 1200 sq ft single family home sitting on slab
- 523 Martinique AveJun 6, 2026Build new driveway with approach
- 4942 Terry StJun 5, 2026We are pleased to provide the necessary manpower and equipment for the demolition permit.the project involves the careful demolition of approximately 1,200 single-family homes. all work will be conducted manually to ensure the protection of the wood slab. this process will include the removal of all roofing and side walls, leaving only the slab intact.please note that the removal is strictly confined to the property lines of the project site.legal disposal of all debris materials will be conducted by transporting all waste to the designated dumpster for proper disposal at the landfill
- 5102 Philip AveMay 18, 20268ft fence with wood pickets and wood post on a new construction duplex. 2 pedestrian 8ft gates total
- 602 Martinique AveMay 14, 2026Install new shower drain inside home with new shower valve. then in garage add laundry,shower,toilet,sink
- 6822 Vivian AveMay 1, 2026Demolition and remove existing drive approach measuring ~10' x 12' with city sidewalk section. replace existing concrete with dimensions matching the existing
- 419 Cameron AveMar 5, 20268 1/2' wood fence on steel posts
- 607 Cordova StFeb 25, 2026Single-story residential house demolition and disposal consisting of approximately 1640 square feet plus detached garage
- 1030 Cristler AveFeb 11, 2026Complete demolition excluding shared fences. hauling off debris and cleaning the lot blade clean
- 7003 Lindsley AveJan 7, 2026Installation of a new wood board-on-board fence approximately 8 feet tall along the side/rear perimeter of the property. includes removal of any existing damaged fencing, installation of new metal posts
- 3411 Mingo StDec 15, 2025Residential demolition permit
- 1541 Caldwell AveSep 28, 2025New hvac
- 3014 Reynolds AveAug 28, 2025Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades
- 611 S Glasgow DrAug 27, 2025Demolition sfdblade cleanclear debrisno tree removal
- 5335 Gurley AveJul 30, 2025Demolish house and foundation. remove sidewalks to city sidewalks
- 1569 Harris CtJul 25, 2025Demolition clearing lot
- 1215 Mckenzie StMay 12, 2025Demolish and haul away existing church building and associated foundation, existing canopy and piers.all subject to field inspectors approval. demolish structure(s) and improvement(s) per site plan provided. remove debris and must be blade clean. no tree removal
- 418 Grandview AveDec 15, 2020Demolition sfd
- 4923 Gurley AveDec 3, 2020Demolition sfd
- 622 Parkview AveSep 22, 2020Demolition sfd
Questions
What demolitions are being built in Dallas 75223?
37 addresses in 75223 have permits or project filings for demolitions in the last two years. The most recent was filed at 917 Bank St. Others include 611 Parkview Ave, 609 Cordova St, 3118 Jerome St.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.