3014 Reynolds Ave
Dallas, TX 75223
Single-family home permitted at 3014 Reynolds Ave
A new single-family home is planned for the vacant lot at 3014 Reynolds Ave. The City of Dallas issued a residential new-construction permit on July 7, 2025, followed by plumbing, electrical, and mechanical permits in July and August.
Summarized from City of Dallas records · updated Aug 28, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Aug 28, 2025
- since May 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsScope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades
Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades
City of Dallas permitResidential Mechanical PermitScope of work – complete plumbing installation (rough-in to final trim)project type: new construction – single family residencescope purpose: full residential system installation________________________________________1. rough-in phase – labor and materials• excavation:excavate trenches up to 3 feet deep for installation of underground drainage, waste, and vent piping. trenches will be properly sloped and laid out per code.• underground piping:install all necessary drain, waste, and vent (dwv) piping under the slab per engineered plumbing plans. pipe will be bedded with sand and properly supported prior to backfill.• water supply lines:install underground cold and hot water lines using pex or approved materials with protective sleeving at all slab penetrations.• gas line installation (underground/rough):install gas piping from meter location to appliances including:o kitchen stoveo hvac unito tank-type or tankless water heater• backfill & inspection:once inspected and tested, trenches will be backfilled and compacted with clean fill and/or select material.________________________________________2. top-out phase – labor and materials• vertical dwv & vent lines:install vertical drain and vent lines throughout the structure including:o (2.5) bathroomso kitcheno laundry roomo water heater closet• water lines (above-slab):continue installation of hot and cold water lines to all plumbing fixtures, properly supported and pressure-tested.• gas lines (above-slab):extend gas lines to all specified locations, including:o stoveo hvac systemo water heater• pressure testing & inspection:system will be pressure tested with air or water per dallas plumbing code. coordination with inspectors for sign-off.________________________________________3. final trim-out – labor and materials• fixture installation:install and connect all plumbing fixtures and trims including:o (3) toiletso (4) bathroom sink faucetso (3) shower valve trimso (1) kitchen fauceto (1) laundry boxo (1) water heater (gas or electric)o (1) gas chimneyo angle stops, supply lines, and p-traps at each fixture• gas appliance final hookup:secure and test connections to all gas appliances (chimney, range, water heater, hvac).• final testing and inspection:system will be tested for leaks and proper operation. final inspection with local code enforcement will be scheduled and passed
Scope of work – complete plumbing installation (rough-in to final trim)project type: new construction – single family residencescope purpose: full residential system installation________________________________________1. rough-in phase – labor and materials• excavation:excavate trenches up to 3 feet deep for installation of underground drainage, waste, and vent piping. trenches will be properly sloped and laid out per code.• underground piping:install all necessary drain, waste, and vent (dwv) piping under the slab per engineered plumbing plans. pipe will be bedded with sand and properly supported prior to backfill.• water supply lines:install underground cold and hot water lines using pex or approved materials with protective sleeving at all slab penetrations.• gas line installation (underground/rough):install gas piping from meter location to appliances including:o kitchen stoveo hvac unito tank-type or tankless water heater• backfill & inspection:once inspected and tested, trenches will be backfilled and compacted with clean fill and/or select material.________________________________________2. top-out phase – labor and materials• vertical dwv & vent lines:install vertical drain and vent lines throughout the structure including:o (2.5) bathroomso kitcheno laundry roomo water heater closet• water lines (above-slab):continue installation of hot and cold water lines to all plumbing fixtures, properly supported and pressure-tested.• gas lines (above-slab):extend gas lines to all specified locations, including:o stoveo hvac systemo water heater• pressure testing & inspection:system will be pressure tested with air or water per dallas plumbing code. coordination with inspectors for sign-off.________________________________________3. final trim-out – labor and materials• fixture installation:install and connect all plumbing fixtures and trims including:o (3) toiletso (4) bathroom sink faucetso (3) shower valve trimso (1) kitchen fauceto (1) laundry boxo (1) water heater (gas or electric)o (1) gas chimneyo angle stops, supply lines, and p-traps at each fixture• gas appliance final hookup:secure and test connections to all gas appliances (chimney, range, water heater, hvac).• final testing and inspection:system will be tested for leaks and proper operation. final inspection with local code enforcement will be scheduled and passed
City of Dallas permitResidential Plumbing PermitScope of work: temporary power pole installationproject summary:this scope describes the work required to install a temporary power pole to provide electrical service during construction at the our project site.work description:excavation & pole setting:excavate a hole 24 inches deep (2 feet) and approximately 8 inches in diameter, suitable for setting a standard treated wood utility pole or 4x4/6x6 post.place the pole vertically into the hole and backfill with compacted soil and concrete (as needed) to ensure stability and plumb alignment.electrical setup:install a meter can (approved by the local utility provider) on the temporary pole.provide one (1) 220v receptacle and two (2) 110v gfci-protected receptacles for construction power use.include a weatherproof enclosure for all outlets and ensure compliance with nec (national electrical code) and local code requirements.grounding:install a grounding electrode system, including one or more ground rods driven to a depth of 8 feet and connected to the pole with a continuous copper ground wire (#6 awg minimum).utility connection:coordinate with the local utility company for inspection and connection of temporary service.ensure all equipment and installation meet the standards for temporary construction power, as defined by the local authority having jurisdiction (ahj)
Scope of work: temporary power pole installationproject summary:this scope describes the work required to install a temporary power pole to provide electrical service during construction at the our project site.work description:excavation & pole setting:excavate a hole 24 inches deep (2 feet) and approximately 8 inches in diameter, suitable for setting a standard treated wood utility pole or 4x4/6x6 post.place the pole vertically into the hole and backfill with compacted soil and concrete (as needed) to ensure stability and plumb alignment.electrical setup:install a meter can (approved by the local utility provider) on the temporary pole.provide one (1) 220v receptacle and two (2) 110v gfci-protected receptacles for construction power use.include a weatherproof enclosure for all outlets and ensure compliance with nec (national electrical code) and local code requirements.grounding:install a grounding electrode system, including one or more ground rods driven to a depth of 8 feet and connected to the pole with a continuous copper ground wire (#6 awg minimum).utility connection:coordinate with the local utility company for inspection and connection of temporary service.ensure all equipment and installation meet the standards for temporary construction power, as defined by the local authority having jurisdiction (ahj)
City of Dallas permitResidential Electrical PermitDemolition was done by fire department on winslow and east grand ave in 75223 zip code back in 2021
Demolition was done by fire department on winslow and east grand ave in 75223 zip code back in 2021
City of Dallas permitResidential Demolition Permit
Sources: City of Dallas
Questions about 3014 Reynolds Ave
What is being built at 3014 Reynolds Ave?
A City of Dallas permit describes new construction of a single-family house on a vacant lot. The permit was filed July 7, 2025.
When was the new home at 3014 Reynolds Ave permitted?
The residential new-construction permit, 2504211155_199671684-001, is dated July 7, 2025.
What other permits were filed for 3014 Reynolds Ave?
The records include a temporary-power electrical permit dated July 17, 2025, a plumbing permit dated July 18, and a mechanical permit dated August 28.
Do the permits describe plumbing for the new home at 3014 Reynolds Ave?
Yes. The July 18, 2025 plumbing permit describes a new-construction single-family residence, including plumbing for bathrooms, a kitchen, and a laundry room.
Do the records show HVAC work at 3014 Reynolds Ave?
Yes. A mechanical permit dated August 28, 2025 describes HVAC installation, including ductwork and equipment, for the project.
Also being built nearby
All of 75223- 3111 Reynolds AveAug 12, 2025Perform gas test, for gas release · 103 m away
- 3006 Spurlock StFeb 20, 2026Gas test · 104 m away
- 3002 Spurlock StSep 3, 2025Replacing 2 ton gas hvac system · 104 m away
- 2926 Reynolds AveNov 4, 2026(addition ) run two ducts and boot. place two 10x6' vents · 106 m away
- 3011 Jerome StSep 25, 2025Gas test need atmos release · 116 m away
- 3027 Jerome StMar 10, 2026Electrical work for addition · 117 m away
- 5101 Beeman AveApr 18, 2026Nsfaa-paint walls in the bedroom/bathroom, replacing the exterior metal walls, remodel the walls of the shower/bathroom, paint the walls in the room, replace the bedroom and bathroom doors, place new glass windows in the room, place a floor tile in the bathroom and bedroom. remodel the walls of the storage room and repair the roof of the storage room · 150 m away
- 2926 Spurlock StJul 22, 2025Tear off existing layers of felt - 2 layers install 3 sheets of decking allowancesynthetic feltinstall asphalt starter around perimeter of roof ice and water barrier in valleysinstall new laminate shingle- 30 yr manufacture warrantyinstall duraflowreplace heat stack and rain capspaint all metals and flashing to match · 150 m away
- 3122 Spurlock StAug 17, 2026Replacing the condenser and coil · 152 m away
- 3118 Jerome StNov 10, 2026Nsfaa build new house · 153 m away
- 3107 Jerome StFeb 27, 2026Electrical for addition · 153 m away
- 3111 Jerome StApr 10, 2026Nsfaa permitting for built addition from the past to comply with city of dallas rules and guidelines · 156 m away
More demolitions in 75223, warehouses & industrial in 75223, new homes in 75223.