3111 Jerome St addition is being permitted after construction
A City of Dallas permit filed April 10, 2026, covers an addition that was already built at 3111 Jerome St. The residential alteration and addition permit, RES-ALT-ADD-26-000672, is for bringing the past work into compliance with city rules and guidelines.
Summarized from City of Dallas records · updated Apr 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 10, 2026
- since Apr 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNsfaa permitting for built addition from the past to comply with city of dallas rules and guidelines
Nsfaa permitting for built addition from the past to comply with city of dallas rules and guidelines
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 3111 Jerome St
What is happening at 3111 Jerome St in Dallas?
A City of Dallas permit indicates that a previously built residential addition is being permitted to comply with city rules and guidelines. The permit was filed April 10, 2026.
Is a new addition being built at 3111 Jerome St?
The permit describes an addition that was built in the past, rather than identifying it as new construction. It covers permitting that work for compliance with city rules and guidelines.
When was the permit filed for 3111 Jerome St?
The City of Dallas filed permit RES-ALT-ADD-26-000672 on April 10, 2026.
What kind of permit was issued for 3111 Jerome St?
It is a Residential Alteration Addition Permit. The description says it is for permitting a previously built addition to comply with City of Dallas rules and guidelines.
Does the 3111 Jerome St permit list the size or cost of the addition?
The available permit record does not list a square footage or reported valuation for the work.
Also being built nearby
All of 75223- 3107 Jerome StFeb 27, 2026Electrical for addition · 4 m away
- 3118 Jerome StNov 10, 2026Nsfaa build new house · 15 m away
- 3027 Jerome StMar 10, 2026Electrical work for addition · 90 m away
- 3110 Kinmore StOct 31, 202540 gallon gas water heater · 99 m away
- 3111 Reynolds AveAug 12, 2025Perform gas test, for gas release · 103 m away
- 3011 Jerome StSep 25, 2025Gas test need atmos release · 107 m away
- 3014 Kinmore StDec 1, 2025Gas test for release · 140 m away
- 5219 St Charles AveNov 16, 2026Complete work from permit record 2306301067_181863593-003 · 144 m away
- 3203 Reynolds AveNov 10, 2026Nsfaa-bathroom addition · 149 m away
- 3007 Kinmore StFeb 25, 2026Gas test for service · 156 m away
- 3014 Reynolds AveAug 28, 2025Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades · 156 m away
- 3218 Kinmore StJun 27, 2025New construction residential · 172 m away