3027 Jerome St
Dallas, TX 75223
Residential remodel and addition at 3027 Jerome St
A residential remodel and addition at 3027 Jerome St includes work on the main structure and a remodel of the existing detached garage. The City of Dallas filed the alteration and addition permit on February 4, 2026, followed by an electrical permit for the addition on March 10, 2026.
Summarized from City of Dallas records · updated Mar 10, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 10, 2026
- since Feb 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa this project consists of a residential remodel and addition. the main structure will be remodeled and will include mechanical, electrical, plumbing, framing, and foundation work. the existing detached garage will also be remodeled as part of this project
Nsfaa this project consists of a residential remodel and addition. the main structure will be remodeled and will include mechanical, electrical, plumbing, framing, and foundation work. the existing detached garage will also be remodeled as part of this project
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 3027 Jerome St
What is being built at 3027 Jerome St in Dallas?
City of Dallas permits describe a residential remodel and addition, including work on the main structure and the existing detached garage. The alteration and addition permit was filed February 4, 2026.
Is 3027 Jerome St getting a home addition?
Yes. A City of Dallas residential alteration and addition permit describes a remodel and addition at the property. The permit is RES-ALT-ADD-26-000129, filed February 4, 2026.
What work is planned for the house at 3027 Jerome St?
The permit description lists mechanical, electrical, plumbing, framing, and foundation work as part of the main-structure remodel. It also says the existing detached garage will be remodeled.
Was electrical work permitted at 3027 Jerome St?
Yes. The City of Dallas filed a residential electrical permit for work on the addition on March 10, 2026. The permit number is RES-ELC-26-001345.
When were permits filed for 3027 Jerome St?
The residential alteration and addition permit was filed February 4, 2026, and the electrical permit for the addition was filed March 10, 2026.
Also being built nearby
All of 75223- 3011 Jerome StSep 25, 2025Gas test need atmos release · 17 m away
- 5219 St Charles AveNov 16, 2026Complete work from permit record 2306301067_181863593-003 · 75 m away
- 3107 Jerome StFeb 27, 2026Electrical for addition · 86 m away
- 3111 Jerome StApr 10, 2026Nsfaa permitting for built addition from the past to comply with city of dallas rules and guidelines · 90 m away
- 3118 Jerome StNov 10, 2026Nsfaa build new house · 100 m away
- 3014 Kinmore StDec 1, 2025Gas test for release · 99 m away
- 3007 Kinmore StFeb 25, 2026Gas test for service · 113 m away
- 3014 Reynolds AveAug 28, 2025Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades · 117 m away
- 2927 Jerome StOct 2, 2026Nsfaa-window alteration and garage conversation · 119 m away
- 2923 Jerome StAug 20, 2026Nsfaa remodel addition · 124 m away
- 3111 Reynolds AveAug 12, 2025Perform gas test, for gas release · 135 m away
- 2910 Jerome StMay 4, 2026Replace complete heat pump system · 138 m away