2923 Jerome St
Dallas, TX 75223
Residential remodel and addition at 2923 Jerome St
City of Dallas permit records indicate a residential remodel and addition at 2923 Jerome St, filed August 20, 2026. An earlier plumbing permit, filed October 20, 2025, covers relocating the gas meter. The records list no project size, valuation, or construction schedule.
Summarized from City of Dallas records · updated Aug 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 20, 2026
- since Oct 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2923 Jerome St
What is being built at 2923 Jerome St in Dallas?
City of Dallas records describe a residential remodel and addition. The permit, RES-ALT-ADD-26-001568, was filed August 20, 2026.
When was the remodel and addition permitted at 2923 Jerome St?
The City of Dallas permit was filed on August 20, 2026. Its permit number is RES-ALT-ADD-26-001568.
Is there a gas meter relocation at 2923 Jerome St?
Yes. A City of Dallas residential plumbing permit describes relocating the gas meter. It was filed October 20, 2025, under permit RES-PLM-25-006247.
How large is the addition at 2923 Jerome St?
The permit record does not include a square-footage figure.
How much will the 2923 Jerome St remodel cost?
The City of Dallas records provided do not list a project valuation or estimated cost.
When will work be completed at 2923 Jerome St?
The permit records do not provide a construction schedule or completion date.
Also being built nearby
All of 75223- 2927 Jerome StOct 2, 2026Nsfaa-window alteration and garage conversation · 4 m away
- 2910 Jerome StMay 4, 2026Replace complete heat pump system · 18 m away
- 2903 Jerome StDec 29, 2025Service upgrade · 22 m away
- 5231 Beeman AveMay 20, 2026Service upgrade · 90 m away
- 5219 St Charles AveNov 16, 2026Complete work from permit record 2306301067_181863593-003 · 106 m away
- 3011 Jerome StSep 25, 2025Gas test need atmos release · 107 m away
- 2926 Reynolds AveNov 4, 2026(addition ) run two ducts and boot. place two 10x6' vents · 116 m away
- 3027 Jerome StMar 10, 2026Electrical work for addition · 124 m away
- 5101 Beeman AveApr 18, 2026Nsfaa-paint walls in the bedroom/bathroom, replacing the exterior metal walls, remodel the walls of the shower/bathroom, paint the walls in the room, replace the bedroom and bathroom doors, place new glass windows in the room, place a floor tile in the bathroom and bedroom. remodel the walls of the storage room and repair the roof of the storage room · 143 m away
- 3014 Kinmore StDec 1, 2025Gas test for release · 151 m away
- 3007 Kinmore StFeb 25, 2026Gas test for service · 153 m away
- 3014 Reynolds AveAug 28, 2025Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades · 160 m away