5101 Beeman Ave
Dallas, TX 75223
Permits cover home remodeling and a residential-use conversion
City of Dallas permits indicate residential alterations at 5101 Beeman Ave, including work on bedroom and bathroom walls, doors, windows, flooring, and a storage-room roof. A separate accessory-structure permit filed April 14, 2026, covers replacing a metal or aluminum fence and converting the property to residential use; an alteration permit filed April 18 covers the remodeling work.
Summarized from City of Dallas records · updated Apr 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 18, 2026
- since Apr 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa-paint walls in the bedroom/bathroom, replacing the exterior metal walls, remodel the walls of the shower/bathroom, paint the walls in the room, replace the bedroom and bathroom doors, place new glass windows in the room, place a floor tile in the bathroom and bedroom. remodel the walls of the storage room and repair the roof of the storage room
Nsfaa-paint walls in the bedroom/bathroom, replacing the exterior metal walls, remodel the walls of the shower/bathroom, paint the walls in the room, replace the bedroom and bathroom doors, place new glass windows in the room, place a floor tile in the bathroom and bedroom. remodel the walls of the storage room and repair the roof of the storage room
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 5101 Beeman Ave
What is being built at 5101 Beeman Ave?
The permits describe home remodeling and a proposed conversion to residential use, not a new building. The City of Dallas alteration permit is RES-ALT-ADD-26-000720.
What work is planned at 5101 Beeman Ave?
The April 18, 2026, permit describes remodeling bedroom and bathroom walls, replacing doors and exterior metal walls, adding glass windows, installing floor tile, and repairing the storage-room roof.
Is 5101 Beeman Ave being converted to residential use?
A City of Dallas accessory-structure permit filed April 14, 2026, says the applicant wants to convert the property to residential use. It also covers replacing a metal or aluminum fence.
What are the permit numbers for 5101 Beeman Ave?
The City of Dallas records list RES-ACC-26-000487, filed April 14, 2026, and RES-ALT-ADD-26-000720, filed April 18, 2026.
When were permits filed for 5101 Beeman Ave?
The two City of Dallas permits were filed April 14 and April 18, 2026. The April 14 filing covers the fence and proposed residential-use conversion; the April 18 filing covers alterations.
Also being built nearby
All of 75223- 2926 Reynolds AveNov 4, 2026(addition ) run two ducts and boot. place two 10x6' vents · 47 m away
- 2926 Spurlock StJul 22, 2025Tear off existing layers of felt - 2 layers install 3 sheets of decking allowancesynthetic feltinstall asphalt starter around perimeter of roof ice and water barrier in valleysinstall new laminate shingle- 30 yr manufacture warrantyinstall duraflowreplace heat stack and rain capspaint all metals and flashing to match · 92 m away
- 2910 Jerome StMay 4, 2026Replace complete heat pump system · 127 m away
- 2903 Jerome StDec 29, 2025Service upgrade · 138 m away
- 2923 Jerome StAug 20, 2026Nsfaa remodel addition · 143 m away
- 2927 Jerome StOct 2, 2026Nsfaa-window alteration and garage conversation · 144 m away
- 3014 Reynolds AveAug 28, 2025Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades · 150 m away
- 3002 Spurlock StSep 3, 2025Replacing 2 ton gas hvac system · 158 m away
- 3006 Spurlock StFeb 20, 2026Gas test · 162 m away
- 2922 Alpine StNov 19, 2025Gas test · 177 m away
- 3011 Jerome StSep 25, 2025Gas test need atmos release · 199 m away
- 3027 Jerome StMar 10, 2026Electrical work for addition · 212 m away