3002 Spurlock St
Dallas, TX 75223
Gas line installation and HVAC replacement permitted
Permits at 3002 Spurlock St cover installation of a gas line and replacement of a 2-ton gas HVAC system. The plumbing permit was filed August 29, 2025, and the mechanical permit was filed September 3, 2025.
Summarized from City of Dallas records · updated Sep 3, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 3, 2025
- since Aug 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3002 Spurlock St
What is being built at 3002 Spurlock St in Dallas?
The permits indicate gas line work and replacement of a 2-ton gas HVAC system at this residential address, rather than a new building.
Is a new home being built at 3002 Spurlock St?
The two City of Dallas permits listed for this address are for gas line installation and HVAC replacement.
Is the HVAC system being replaced at 3002 Spurlock St?
Yes. Mechanical permit RES-MEC-25-002314, filed September 3, 2025, describes replacing a 2-ton gas HVAC system.
What gas work is permitted at 3002 Spurlock St?
Plumbing permit RES-PLM-25-004334, filed August 29, 2025, covers installing a new gas line and conducting a gas test.
When were the permits filed for 3002 Spurlock St?
The gas line permit was filed August 29, 2025, and the HVAC permit was filed September 3, 2025.
Also being built nearby
All of 75223- 3006 Spurlock StFeb 20, 2026Gas test · 4 m away
- 2926 Spurlock StJul 22, 2025Tear off existing layers of felt - 2 layers install 3 sheets of decking allowancesynthetic feltinstall asphalt starter around perimeter of roof ice and water barrier in valleysinstall new laminate shingle- 30 yr manufacture warrantyinstall duraflowreplace heat stack and rain capspaint all metals and flashing to match · 95 m away
- 3014 Reynolds AveAug 28, 2025Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades · 104 m away
- 3122 Spurlock StAug 17, 2026Replacing the condenser and coil · 126 m away
- 2926 Reynolds AveNov 4, 2026(addition ) run two ducts and boot. place two 10x6' vents · 139 m away
- 2922 Alpine StNov 19, 2025Gas test · 140 m away
- 5101 Beeman AveApr 18, 2026Nsfaa-paint walls in the bedroom/bathroom, replacing the exterior metal walls, remodel the walls of the shower/bathroom, paint the walls in the room, replace the bedroom and bathroom doors, place new glass windows in the room, place a floor tile in the bathroom and bedroom. remodel the walls of the storage room and repair the roof of the storage room · 158 m away
- 3111 Reynolds AveAug 12, 2025Perform gas test, for gas release · 164 m away
- 3011 Jerome StSep 25, 2025Gas test need atmos release · 219 m away
- 3027 Jerome StMar 10, 2026Electrical work for addition · 221 m away
- 3206 Spurlock StNov 10, 2020Electrical repairs · 229 m away
- 2910 Jerome StMay 4, 2026Replace complete heat pump system · 235 m away