New demolitions in Dallas 75228
27 addresses in 75228 have permits or project filings for demolitions in the last two years. The most recent was filed at 11102 Barbarosa Dr.
Latest filings
- 11102 Barbarosa DrNov 4, 2026Nsfaa new construction sfd
- 2719 Andrea LnNov 3, 2026We built a new home and added a fence to the property for the backyard
- 5470 N Jim Miller RdNov 3, 2026Zo bc demolition one light pole base and expose conduit. install one light pole base, pole and light fixture
- 1848 Oates DrOct 24, 2026Nsfaa-demolish existing detached garage (approx. 14 x 36 ft) and slab. construct new one-story detached garage, approx. 14'-3" x 37'-2" (532 sq ft), on an engineered monolithic slab, 2x6 wood framing, 9 ft walls, 15 ft ridge, with one 10 x 8 ft overhead door and parking for one vehicle. includes one full bathroom (toilet, sink, shower), electrical, mini-split hvac, and connection to existing sewer and water. no change of use; accessory to the existing single-family home. not for rental
- 3019 Millmar DrOct 15, 2026Wire na new house
- 1842 Naylor StOct 6, 20266- lavatories 4- toilets 1- kitchen sink 1- laundry 1- regular tub 2- shower pan liner 1- freestanding tub 1- tankless water heater 2- hose bibs gas, sewer and water services
- 2611 Healey DrOct 5, 2026Dsst-disd ej keist middle school demolition scope of work includes a complete demolition of the vacated edwin j. kiest elementary school. demolition includes removal of all utilities onsite (above and below grade). demolition includes selective removal of certain trees, perimeter fencing, playground equipment, parking lots, approaches and sidewalks. demolition is also inclusive of complete removal of the existing elementary school building down to 10' below existing grade
- 7898 Samuell BlvdSep 18, 2026Phase - alteration addition
- 10911 Barbarosa DrSep 10, 2026This project is a new construction we will be doing all of the hvac system
- 12025 Shiloh RdAug 31, 2026Clean and show/no work done
- 2923 Materhorn DrAug 13, 2026The approach will be approximately 16 ft. × 11 ft. with 3/8-inch rebar spaced at 12 inches on center. the driveway will be approximately 33 ft. × 16 ft. with a concrete thickness of 4 inches and 3/8-inch rebar spaced at 18 inches on center. redwood approach dowels will be installed as required. concrete will be 3,000 psi
- 8320 Capriola LnAug 7, 2026Install new 200' 8' horizontal bob with cap trim and kickboard. 20' slide gate, demolition and haul away. post will be 6' on center installed 3' deep in the ground
- 8915 Stanwood DrJul 21, 2026Nsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements
- 1832 Mapleton DrJul 17, 2026Alteration/adition
- 2521 El Cerrito DrJun 10, 2026Repair and replace damaged plumbing from fire
- 2630 Klondike DrMay 20, 2026Demolition existing driveway and pour all new, including right of way and driveway approach
- 3120 N Buckner BlvdMay 20, 2026Site utilities water and sewer
- 2777 N Buckner BlvdMay 1, 2026Electrical meter release. building 1500 house panel
- 3030 Gus Thomasson RdApr 28, 2026Mcr installing two shade structures over the existing playgrouds. both shades are 4 post hip with a fabric top
- 2827 Marbella LnApr 20, 2026At garage addition:rough-in of power and lighting, walls and ceilings.trim-out of power and lighting.existing circuits to be reused with gfci protection
- 2506 Gross RdApr 7, 2026Install 5 ton a/c system complete
- 10707 Ferguson RdApr 2, 2026Relocation of underground circuits, demolition lights, & add new circuits
- 11839 Shiloh RdMar 3, 2026Gas line repair
- 1638 Stevens StJan 20, 2026New build
- 9750 Ferguson RdDec 18, 2025Demolish current driveway approach and pour new driveway approach. and driveway
- 1960 Peavy RdDec 11, 2025Demolish house, haul off debris. no tree
- 11046 Milhof DrOct 23, 2025Replacing sewer and water lines under pier and beam home. installing new double cos and valve box for water near home perimeter
- 8035 E R L Thornton FwyOct 8, 2025Suite 605 will be downsized and converted to an executive comprised of 11 smaller suits around a common area with reception and break room. executive suite 605 will consist of common area 605 - 804 sq ft; 605 a - 386 sq ft; 605 b - 182 sq ft; 605 c - 182 sq ft; 605 d - 182 sq ft; 605 e - 174 sq ft; 605 f - 125 sq ft; 605 g - 145 sq ft; 605 h - 117 sq ft; 605 i - 127 sq ft; 605 j - 127 sq ft; 605 k - 87 sq ft an additional suite will be created suite 607 - 201 sq ft this is a spec project and unoccupied work will consist of demolition, construction of new walls, electrical work for outlets and lighting rewire
- 2015 Oates DrDec 3, 2020Demolition sfd
- 8850 Ferguson RdSep 23, 2020Demolition sfd
Questions
What demolitions are being built in Dallas 75228?
27 addresses in 75228 have permits or project filings for demolitions in the last two years. The most recent was filed at 11102 Barbarosa Dr. Others include 2719 Andrea Ln, 5470 N Jim Miller Rd, 1848 Oates Dr.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.