39 addresses in 75243 have permits or project filings for demolitions in the last two years. The most recent was filed at 9601 Walnut St.
Latest filings
- 9601 Walnut StNov 13, 2026The community consists of 12 buildings. 5 of the buildings are 3 story. these buildings are #1, #5, #10. #11, and #12. each building has 3 exterior front side stairwells. the foundations under the stairs are failing. this is causing the stairs to sink, and pull away from the buildings. this situation has caused water to leak between the stair landings and the entry landings. the connection to the building is in part the cause of the leaks as well. consequently there are varied degrees of water damage to the entry landings, and to related structures in immediate vicinity of landings. we intend to demolition all stucco from the stairwells. lift, and support the stairwells while the existing foundation is removed, and new foundation is installed. repair or replace damage steel supports as needed. make repairs to existing building as needed. install new hand railings to code, and paint.due to financial restrictions the hoa wants to do 1 building at a time, (3 stairwells). this is the reason for the phased project
- 9341 Loma Vista DrNov 12, 2026Nsfaa-remodel the existing single-story residence at 9341 loma vista drive and add 10 square feet of conditioned space at the breakfast room beneath the existing roof and on the existing patio slab. work includes selective demolition, reconfiguring the kitchen and breakfast room, remodeling the primary bath and closet, converting the front sitting room to a bedroom, replacing the front bow windows, installing new rear windows and a back door, and making associated electrical, plumbing, and mechanical modifications as shown on the plans
- 8600 Skyline DrNov 4, 2026Floor 4
- 9243 Dove Meadow DrOct 23, 2026Demolition and haul off old city sidewalk, and existing private sidewalk. sawcut and remove curb & gutter where new drive approaches will go. install new circle driveway, new drive approaches and new city sidewalk. approx 1500 sq ft
- 11490 Audelia RdOct 22, 2026Demolish building 1 due to fire.refer to previous demolition permit request com-dem-26-000172 requesting to cancel previous request for alteration permit: com-alt-add-26-002321. i previously requested alteration permit p/hile in alteration he stated since building isn't attach request demolition. requested and was told i needed to have the alteration permit canceled. that has also been completed
- 8412 Ebony DrOct 21, 2026Electric new construction
- 12500 Ti Blvd · Texas Instruments, Inc.Oct 21, 2026Bu zo remodel existing 2nd floor office area by adding two new drywall offices with storefront entry and paint. add new lighting for two offices, rework mechanical, electrical, sprinklers, fire alarm to accommodate new office. install new modular high for new conference room
- 9069 Vantage Point Dr · 635 & Vantage LLCOct 16, 2026King buffet — new construction — one story building
- 9233 Middle Glen DrOct 16, 2026Moved returns to ceiling
- 11615 Forest Central DrOct 8, 2026Mcr change of use/occupancy of existing commercial suite to a medical office/dermatology practice. no construction, additions, alterations, demolition, remodeling, or modifications to the existing space are proposed as part of this application. the suite will be occupied and used in its existing configuration, as depicted in the submitted floor plan. a 240 v electrical outlet may be installed in the future if needed, but this is not part of the current scope of work and is not required for occupancy. any future electrical work will be permitted separately if required
- 9247 Skillman StSep 30, 2026Electrical remodel and updating service
- 11970 N Central ExpySep 17, 2026Electrical work to reconfigure admin office at mcd heart & spine hospital to construct a 200 sq ft chapel
- 9560 Skillman StSep 16, 2026Zo bc scope of work – conversion daycare to amusement / event center (no structural changes)1. general descriptionthe project consists of preparing an existing tenant space for use as an indoor amusement/event center. the work is non-structural and does include demolition or no construction of new walls. all existing building systems will remain in place and will be evaluated for safe operation
- 9759 Forest LnSep 11, 2026Provide and install hvac complet system
- 12305 Halima StSep 8, 2026The existing brick wall has partially fallen due to storms occured last year and a month ago. to demolish the remaining wall and replace the whole brick wall with 101 ft board-on-board fence, 8ft pacific cedar prime, 5.5" cedar prime,10 ft 13-gauge metal fence posts. it has been approved by boa. the case number is boa-25-000104
- 9308 Forest Ln · Bank Of AmericaSep 4, 2026Scope of work is an exterior renovation / maintenance project. scope includes site work and exterior building maintenance. site work includes: repair and restripe concrete pavement, including ada markings, to match existing; clean site lights and concrete bases throughout; remove bollards and concrete islands associated with drive-through canopy and section of depressed concrete paving around drive-through canopy; remove concrete paving to be replaced; clean, patch, and repair all concrete sidewalks, pavement, curbs, and pads throughout; repaint caution curbs throughout to match existing; paint curb of remote concrete island with yellow caution paint; install two (2) new bollards with bac standard bollard covers and hc signage; provide new bac standard bollard covers to existing bollards; clean and paint ada railing; remove and replace portion of planter wall in r.o.w.; refresh landscaping, including planting, pruning, and mulch.exterior building maintenance includes: clean, patch, and paint building facades; paint all conduit, wall-mounted utilities, downspouts, and scuppers to match adjacent finishes; remove and replace can light fixtures at window and entry soffits with new bac standard led recessed can light fixtures; clean entrance canopy skylights and replace cracked skylights if conditionwarrants; clean and paint entrance canopy. general contractor to evaluate condition of wall , where drive-through canopy is removed, notify architect of any deficiencies prior to proceeding with wall closure ; repair and repoint brick exterior wall around, and behind, drive-through canopy where canopy and vac tubes panel is removed to ensure enclosure.all signage under separate permit (n.i.c.) all signage shown is for reference only. general contractor to coordinate their work with bank of america sign vendor work
- 9780 Walnut StSep 4, 2026Repaired gas valve leak for furnace on the roof
- 9009 Skillman StAug 28, 2026I am starting up customer provided hvacr equipment. two rtus, and 2 walk in coolers
- 13739 N Central Expy · Walmart Real EstateAug 18, 2026Demolition and replacement of lights
- 12606 Greenville AveJul 13, 2026Demolition and install exam sink
- 9330 L B J FwyJul 1, 2026Demolition existing furnish and install new fan powered boxes and vav boxes with associated duct work and diffusers
- 9131 Windy Crest DrApr 28, 2026New construction _ residential
- 9925 Wood Forest DrApr 22, 2026Hvac replacement
- 8330 L B J FwyApr 20, 20264 exit signs relocate4 switches replaced for wall sensors2 new 3-way switches relocate 10-2/4 lights 2 gfci in breakroom with dedicated circuit1 switch and plug for disposal add 4 new plugs in officesclean and strap room properly
- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs
- 12255 Greenville AveApr 2, 2026Wire for and install 12 light fixtures and 8 receptacles
- 13739 N Central Expy. Dallas, TX 75243 · Walmart 7634 Dallas, TXMar 30, 2026Walmart 7634.1002 dallas tx special project — renovation/alteration — add gondolas, workstations, warehouse racking to floor area. demolition existing walls. add cart rails to separate space. add restroom partisans. remodel breakroom and add fixtures
- 12801 N Central Expy · Jpncp Iii,lpMar 12, 20261 plug, 1 data, 2 switches and 3 exits
- 8808 Greenville Ave · 8808 8828 Greenville Holdings LLCFeb 18, 2026Plumbing remodel relocate and add bathrooms and kitchens
- 8828 Greenville Ave · 8808 8828 Greenville Holdings LLCFeb 11, 2026New hvac system and ductwork
- 11969 Plano RdDec 15, 2025Gas test
- 12021 Plano RdNov 13, 2025Gas test
- 9514 Robin Meadow DrNov 3, 2025All new plumbing on remodel
- 10135 Cherry Tree DrOct 3, 2025Outdoor patio with new: 4 recess lights, 1 ceiling fan, 1 fan switch, 1 light switch
- 9709 Chimney Hill LnOct 1, 2025Juarez landscaping and construction will be constructing a privacy fence made of cedar wood, which will measure 388 feet in width and stand 8 feet tall, featuring a board-on-board design. the project will begin with the demolition of the existing brick wall, which is also 388 feet long. once that is completed, we will remove and haul away the debris. next, we will start working on the fence by installing 10-foot tall metal posts, which will be dug 2 feet into the ground and secured with concrete. after the concrete has cured, we will install horizontal rails made of pressure-treated pine wood, , and secure them with brackets and screws.once the rails are properly installed, we will add cedar wood boards in a board-on-board style, using 8x5.5 inch boards. finally, we will add a cedar trim and stain the fence on both sides. the new fence will be constructed in the same location as the current brick wall after it has been removed
- 11461 Hillguard · 11461 HillguardSep 11, 202511461 hillguard demolition make ready — renovation/alteration — interior demolition and renovation to make ready condition
- 9631 Robin Meadow DrAug 19, 2025Demolition house
- 9759 Forest Lane · City Of Dallas, Park & Recreation DepartmentAug 1, 2025Forest audelia recreation center — renovation/alteration — convert portion of an existing shopping center site to be used as a city owned urban park. work consists of demolition of parking/paving and fencing with construction of a new landscaped park with playground, splash pad, sidewalks and revised parking
- 10362 White Elm RdJul 18, 2025Proposed demolition of existing home only. existing foundation to remain on property
- 11613 N Central Expy · New Central Forest S/C Ltd.Jul 14, 2025Plumbing sewer and water
- 13405 Floyd CirJun 27, 2025This job will consist of doing a new parking lot with two approaches and a sidewalk. the parking lot takes 6 in of concrete, rebar #3 every 18 in. we will also demolish the sidewalk (84’x4’) and replace it with a 104’x4’ sidewalk. this will also take 4 in of concrete, and rebar #3 every 18 in. the approaches will contain reewood and 18’ long smooth concrete dowels every 18 in. in the street smooth concrete dowels 5/8x18 will be placed. concrete psi 3,500
Questions
What demolitions are being built in Dallas 75243?
39 addresses in 75243 have permits or project filings for demolitions in the last two years. The most recent was filed at 9601 Walnut St. Others include 9341 Loma Vista Dr, 8600 Skyline Dr, 9243 Dove Meadow Dr.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.