Exterior stairwell foundation repairs at 9601 Walnut St

Permits filed in September and November 2026 describe replacing failing foundations beneath exterior stairwells and repairing related building damage at 9601 Walnut St. The latest permit describes work phased one building at a time, including repairs to stair supports and handrails.

Summarized from City of Dallas records · updated Nov 13, 2026

Projects
2
2 filings
Latest filing
Nov 13, 2026
since Nov 13, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Mcr the community consists of 12 buildings. 5 of the buildings are 3 story. these buildings are #1, #5, #10. #11, and #12. each building has 3 exterior front side stairwells. the foundations under the stairs are failing. this is causing the stairs to sink, and pull away from the buildings. this situation has caused water to leak between the stair landings and the entry landings. the connection to the building is in part the cause of the leaks as well. consequently there are varied degrees of water damage to the entry landings, and to related structures in immediate vicinity of landings. we intend to demolition all stucco from the stairwells. lift, and support the stairwells while the existing foundation is removed, and new foundation is installed. repair or replace damage steel supports as needed. make repairs to existing building as needed. install new hand railings to code, and paint.due to financial restrictions the hoa wants to do 1 building at a time, (3 stairwells). this is the reason for the phased project

    Mcr the community consists of 12 buildings. 5 of the buildings are 3 story. these buildings are #1, #5, #10. #11, and #12. each building has 3 exterior front side stairwells. the foundations under the stairs are failing. this is causing the stairs to sink, and pull away from the buildings. this situation has caused water to leak between the stair landings and the entry landings. the connection to the building is in part the cause of the leaks as well. consequently there are varied degrees of water damage to the entry landings, and to related structures in immediate vicinity of landings. we intend to demolition all stucco from the stairwells. lift, and support the stairwells while the existing foundation is removed, and new foundation is installed. repair or replace damage steel supports as needed. make repairs to existing building as needed. install new hand railings to code, and paint.due to financial restrictions the hoa wants to do 1 building at a time, (3 stairwells). this is the reason for the phased project

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002785
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Mcr each building has 3 exterior stairwells. each stairwell is a stage of work.each stairwell needs its foundations removed and replaced.the structural vertical steel needs to be repaired or replaced as neededrepair or replace any exterior building damage due to exterior stairwell failure.provide new hand railings per code

    Mcr each building has 3 exterior stairwells. each stairwell is a stage of work.each stairwell needs its foundations removed and replaced.the structural vertical steel needs to be repaired or replaced as neededrepair or replace any exterior building damage due to exterior stairwell failure.provide new hand railings per code

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002299
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 9601 Walnut St

What is being built at 9601 Walnut St in Dallas?

The permits describe repairs to exterior stairwells, including replacing their foundations and repairing damaged supports and nearby building areas. They do not describe a new building.

What work is planned for the stairwells at 9601 Walnut St?

The work includes removing and replacing stairwell foundations, repairing or replacing steel supports as needed, repairing related exterior damage, and installing handrails. The November 13, 2026 permit also describes removing stucco from the stairwells and repainting.

When were permits filed for work at 9601 Walnut St?

City of Dallas permits were filed September 21, 2026, and November 13, 2026. The permit numbers are COM-ALT-ADD-26-002299 and COM-ALT-ADD-26-002785.

Which buildings are included in the 9601 Walnut St stairwell repair?

The November 13 permit identifies buildings #1, #5, #10, #11, and #12 as three-story buildings with exterior stairwells. It says the work is planned one building at a time.

Is the work at 9601 Walnut St new construction?

The City of Dallas filings are commercial alteration and addition permits describing stairwell foundation replacement and related repairs, not construction of a new building.