Heat pump replacement permitted at 9696 Walnut St
A permit filed October 31, 2025, covers replacement of a 2-ton wall-mounted heat pump system at 9696 Walnut St. The City of Dallas record does not list a project cost or square footage.
Summarized from City of Dallas records · updated Oct 31, 2025
- Projects
- 34
- 34 filings
- Latest filing
- Oct 31, 2025
- since Oct 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
34 projectsSources: City of Dallas
Questions about 9696 Walnut St
What is happening at 9696 Walnut St in Dallas?
A City of Dallas permit filed October 31, 2025, covers replacing a 2-ton wall-mounted heat pump system.
Is a new building being built at 9696 Walnut St?
The records provided show a heat pump replacement permit, not a permit for new building construction.
When was the heat pump permit filed at 9696 Walnut St?
The permit was filed October 31, 2025. Its number is RES-MEC-25-003401.
What kind of work does permit RES-MEC-25-003401 cover?
It covers replacement of a 2-ton wall-mounted heat pump system at the address.
What's happening near Lee And Walnut Assoc on Walnut Street?
At 9696 Walnut St, about 237 meters from Lee And Walnut Assoc at 9788 Walnut St, a permit covers replacing a 2-ton wall-mounted heat pump system.
Were other permits filed at 9696 Walnut St?
The records also list multifamily electrical repair permits filed in August 2020. Those permits describe electrical repairs.
Also being built nearby
All of 75243- 9751 Walnut StFeb 9, 2026Came out today because eden is trying to get power turned on to her business suit that she recently acquired. oncor is requiring a city inspection before they will turn on power. i advised eden that we could pull the permit but would need to inspect the building for any potential violations that would cause the city inspection to fail. built estimate and looked over everything, found (2) open splices above the drop tile ceiling and a few other items. repaired those items and closed everything back up. we are now ready for the inspection. if the city requires additional work to be done, we will build additional estimates. no issues at close · 156 m away
- 9780 Walnut StSep 4, 2026Repaired gas valve leak for furnace on the roof · 216 m away
- 9609 Walnut StJul 7, 2025Building 10: replaced double check backflow device in ground at end of building · 218 m away
- 12995 Audelia RdSep 8, 2026Install electrical service for a charter power supply cabinet per oncor · 236 m away
- 9788 Walnut St · Lee And Walnut Assoc LtdSep 16, 2026Clean/show · 237 m away
- 13015 Audelia RdSep 20, 2026Replace double check valve outside of building 6 · 243 m away
- 9603 Walnut StNov 14, 2025Near building 9603: double check installation near building. area is dug up, valve and box in place and covered · 249 m away
- 12920 Audelia RdFeb 13, 2026Install 4 total pilings · 256 m away
- 9601 Walnut StNov 13, 2026Mcr the community consists of 12 buildings. 5 of the buildings are 3 story. these buildings are #1, #5, #10. #11, and #12. each building has 3 exterior front side stairwells. the foundations under the stairs are failing. this is causing the stairs to sink, and pull away from the buildings. this situation has caused water to leak between the stair landings and the entry landings. the connection to the building is in part the cause of the leaks as well. consequently there are varied degrees of water damage to the entry landings, and to related structures in immediate vicinity of landings. we intend to demolition all stucco from the stairwells. lift, and support the stairwells while the existing foundation is removed, and new foundation is installed. repair or replace damage steel supports as needed. make repairs to existing building as needed. install new hand railings to code, and paint.due to financial restrictions the hoa wants to do 1 building at a time, (3 stairwells). this is the reason for the phased project · 260 m away
- 12516 Audelia RdNov 2, 2026Mcr fire damage repair at huntington brook apartments, building 10 (r-2, type va, ). unit 1012 (fire origin, 2nd floor): replace fire-damaged roof trusses (engineered by truss manufacturer), roof decking, underlayment and asphalt shingles; new drywall throughout walls and ceilings; new interior doors and flooring; new electrical wiring, receptacles, switches, light fixtures, smoke detectors and 125a panel; new hvac condenser, air handler and ductwork; replace plumbing fixtures like-for-like; repair exterior fiber cement siding, soffit, fascia and gutters. unit 1011 (water/smoke damage): new drywall throughout, paint, new interior doors and flooring; replace outlets, switches and plumbing fixtures as needed; existing hvac and plumbing lines to remain. unit 1010 (smoke damage): attic insulation, drywall texture, flooring and paint repairs. attic: clean, seal and deodorize trusses; replace blown-in insulation. no change of use, no added floor area or dwelling units · 278 m away
- 13030 Audelia RdApr 9, 2026Replace double check at front of property · 316 m away
- 9737 Burney DrDec 10, 2025Gas test · 352 m away