9308 Forest Ln
Dallas, TX 75243 · Bank Of America
Bank of America exterior renovation at 9308 Forest Lane
Exterior renovation and site work are planned at the Bank of America property at 9308 Forest Lane, including removal of the drive-through canopy, pavement repairs and restriping, new bollards, and building maintenance. The City of Dallas permit and TDLR registration were filed September 4, 2026; the TDLR registration lists 6,191 square feet and an applicant-estimated cost of $300,000. A separate plumbing permit filed March 10, 2026, covers breakroom sink relocation and restroom work.
Summarized from Texas Department of Licensing and Regulation, City of Dallas records · updated Sep 4, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 4, 2026
- since Mar 10, 2026
- Largest scope
- 6,191 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Under constructionTX, Dallas, 9308 Forest Ln, Reno Exterior-FC-TX2-817-Forest Meadow
6,191 sq ft · $300K est.
- RegisteredSep 4, 2026
- Plan review
- ConstructionOct '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
3 projects6,191 sq ft exterior renovation to include bollard installation, parking lot re-striping, new exterior signage, exterior painting of canopy, removal of drive through canopy and concrete work. — bank of america
TDLR project registrationRenovation/AlterationReview Complete6,191 sq ft$300K est.- Project #
- TABS2027000397
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Scope of work is an exterior renovation / maintenance project. scope includes site work and exterior building maintenance. site work includes: repair and restripe concrete pavement, including ada markings, to match existing; clean site lights and concrete bases throughout; remove bollards and concrete islands associated with drive-through canopy and section of depressed concrete paving around drive-through canopy; remove concrete paving to be replaced; clean, patch, and repair all concrete sidewalks, pavement, curbs, and pads throughout; repaint caution curbs throughout to match existing; paint curb of remote concrete island with yellow caution paint; install two (2) new bollards with bac standard bollard covers and hc signage; provide new bac standard bollard covers to existing bollards; clean and paint ada railing; remove and replace portion of planter wall in r.o.w.; refresh landscaping, including planting, pruning, and mulch.exterior building maintenance includes: clean, patch, and paint building facades; paint all conduit, wall-mounted utilities, downspouts, and scuppers to match adjacent finishes; remove and replace can light fixtures at window and entry soffits with new bac standard led recessed can light fixtures; clean entrance canopy skylights and replace cracked skylights if conditionwarrants; clean and paint entrance canopy. general contractor to evaluate condition of wall , where drive-through canopy is removed, notify architect of any deficiencies prior to proceeding with wall closure ; repair and repoint brick exterior wall around, and behind, drive-through canopy where canopy and vac tubes panel is removed to ensure enclosure.all signage under separate permit (n.i.c.) all signage shown is for reference only. general contractor to coordinate their work with bank of america sign vendor work
Scope of work is an exterior renovation / maintenance project. scope includes site work and exterior building maintenance. site work includes: repair and restripe concrete pavement, including ada markings, to match existing; clean site lights and concrete bases throughout; remove bollards and concrete islands associated with drive-through canopy and section of depressed concrete paving around drive-through canopy; remove concrete paving to be replaced; clean, patch, and repair all concrete sidewalks, pavement, curbs, and pads throughout; repaint caution curbs throughout to match existing; paint curb of remote concrete island with yellow caution paint; install two (2) new bollards with bac standard bollard covers and hc signage; provide new bac standard bollard covers to existing bollards; clean and paint ada railing; remove and replace portion of planter wall in r.o.w.; refresh landscaping, including planting, pruning, and mulch.exterior building maintenance includes: clean, patch, and paint building facades; paint all conduit, wall-mounted utilities, downspouts, and scuppers to match adjacent finishes; remove and replace can light fixtures at window and entry soffits with new bac standard led recessed can light fixtures; clean entrance canopy skylights and replace cracked skylights if conditionwarrants; clean and paint entrance canopy. general contractor to evaluate condition of wall , where drive-through canopy is removed, notify architect of any deficiencies prior to proceeding with wall closure ; repair and repoint brick exterior wall around, and behind, drive-through canopy where canopy and vac tubes panel is removed to ensure enclosure.all signage under separate permit (n.i.c.) all signage shown is for reference only. general contractor to coordinate their work with bank of america sign vendor work
City of Dallas permitCommercial Alteration Addition PermitRemodel of the building, we will be roughing in for a relocation of a breakroom sink. we will demolition old breakroom sink. also a slight remodel of restrooms, installing new lavatories and demoing of some of the water closets
Remodel of the building, we will be roughing in for a relocation of a breakroom sink. we will demolition old breakroom sink. also a slight remodel of restrooms, installing new lavatories and demoing of some of the water closets
City of Dallas permitCommercial Plumbing Permit
Sources: Texas Department of Licensing and Regulation · City of Dallas
Questions about 9308 Forest Ln
What is being built at 9308 Forest Lane?
Permit records indicate an exterior renovation and site work at the Bank of America property, not a new building. The scope includes removing the drive-through canopy, pavement repairs and restriping, new bollards, and exterior maintenance.
When was the renovation at 9308 Forest Lane permitted?
The City of Dallas alteration permit COM-ALT-ADD-26-002166 and TDLR registration TABS2027000397 were filed September 4, 2026.
Is the drive-through canopy at 9308 Forest Lane being removed?
Yes. The September 4, 2026, permit scope includes removing the drive-through canopy and associated concrete paving.
How much will the 9308 Forest Lane renovation cost?
The TDLR registration lists an applicant-estimated project cost of $300,000. This is an estimate, not a confirmed final cost.
What's being renovated next to Kyli Restaurant on Forest Lane?
Permit records show exterior renovation and site work at 9308 Forest Lane, about 3 meters from Kyli Restaurant at 9310 Forest Lane. The work includes canopy removal, pavement repairs, and exterior maintenance.
Is there plumbing work planned at 9308 Forest Lane?
A City of Dallas commercial plumbing permit filed March 10, 2026, covers relocating a breakroom sink and remodeling restrooms, including new lavatories and removal of some water closets.
Also being built nearby
All of 75243- 9310 Forest Lane · Kyli RestaurantMay 18, 2026Kyli restaurant — new construction — interior remodel of a new restaurant · 3 m away
- 9310 Forest LnOct 5, 2026Commercial remodeling · 3 m away
- 9254 Forest LnJul 2, 2026Hvac replacement lennox 2.5 ton straight electric upflowel16 · 93 m away
- 9301 Forest Lane · Walmart Stores Texas LLCFeb 25, 20252427-1006 walmart capx-refr — renovation/alteration — replace existing cases or evap coils with alternative glycol or co2 cases or evaps. a glycol or co2 refrigeration skid will be placed on the roof. (58,243sf) · 177 m away
- 9301 Forest Ln · Walmart Stores Texas LLCOct 22, 2026Mcr install new interior door in breakroom.install new interior and exterior doors in return storage · 177 m away
- 9228 Windy Crest DrFeb 9, 202650 gallon gas install in hallway closet · 233 m away
- 9220 Windy Crest DrOct 13, 2025Gas repair · 244 m away
- 9216 Windy Crest DrAug 25, 20264 ton complete · 250 m away
- 9203 Alta Oaks DrJul 28, 2026Electrical work for pool · 314 m away
- 9221 Alta Oaks DrSep 22, 2025Replace 5 ton gas hvac unit · 320 m away
- 9137 Windy Crest DrNov 25, 2025Replacing a ton gas complete system and complete duct replacement · 333 m away
- 9131 Windy Crest DrApr 28, 2026New construction _ residential · 338 m away