9310 Forest Ln
Dallas, TX 75243
Restaurant interior remodel permitted at 9310 Forest Ln
City of Dallas permits indicate an interior remodel for a new restaurant at 9310 Forest Ln. The first listed filing was May 11, 2026, and the latest was October 5, 2026; records include electrical, plumbing, mechanical, and demolition work.
Summarized from City of Dallas records · updated Oct 5, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Oct 5, 2026
- since May 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsSources: City of Dallas
Questions about 9310 Forest Ln
What is being built at 9310 Forest Ln in Dallas?
City of Dallas permits describe an interior remodel for a new restaurant. The records also include electrical, plumbing, mechanical, and demolition permits.
When were permits filed for the restaurant at 9310 Forest Ln?
The first listed permit was filed May 11, 2026. The latest listed filings were electrical and plumbing permits dated October 5, 2026.
What work is planned for the restaurant at 9310 Forest Ln?
The permits include removing existing interior finishes, decoration, and fixtures, along with restaurant remodeling. A July 22, 2026 mechanical permit describes replacing three rooftop units.
Is a new restaurant opening near Kyli Restaurant on Forest Lane?
Permits at 9310 Forest Ln describe an interior remodel for a new restaurant. The records do not provide an opening date.
What's being remodeled next to Kyli Restaurant on Forest Lane?
City of Dallas permit records for 9310 Forest Ln indicate a new restaurant interior remodel. The filings run from May 11 through October 5, 2026.
Is the work at 9310 Forest Ln a new building or a remodel?
The permit description calls it an interior remodel for a new restaurant. A June 23, 2026 demolition permit covers removal of existing interior finishes, decoration, and fixtures.
Also being built nearby
All of 75243- 9310 Forest Lane · Kyli RestaurantMay 18, 2026Kyli restaurant — new construction — interior remodel of a new restaurant
- 9308 Forest Ln · Bank Of AmericaSep 4, 2026Scope of work is an exterior renovation / maintenance project. scope includes site work and exterior building maintenance. site work includes: repair and restripe concrete pavement, including ada markings, to match existing; clean site lights and concrete bases throughout; remove bollards and concrete islands associated with drive-through canopy and section of depressed concrete paving around drive-through canopy; remove concrete paving to be replaced; clean, patch, and repair all concrete sidewalks, pavement, curbs, and pads throughout; repaint caution curbs throughout to match existing; paint curb of remote concrete island with yellow caution paint; install two (2) new bollards with bac standard bollard covers and hc signage; provide new bac standard bollard covers to existing bollards; clean and paint ada railing; remove and replace portion of planter wall in r.o.w.; refresh landscaping, including planting, pruning, and mulch.exterior building maintenance includes: clean, patch, and paint building facades; paint all conduit, wall-mounted utilities, downspouts, and scuppers to match adjacent finishes; remove and replace can light fixtures at window and entry soffits with new bac standard led recessed can light fixtures; clean entrance canopy skylights and replace cracked skylights if conditionwarrants; clean and paint entrance canopy. general contractor to evaluate condition of wall , where drive-through canopy is removed, notify architect of any deficiencies prior to proceeding with wall closure ; repair and repoint brick exterior wall around, and behind, drive-through canopy where canopy and vac tubes panel is removed to ensure enclosure.all signage under separate permit (n.i.c.) all signage shown is for reference only. general contractor to coordinate their work with bank of america sign vendor work · 3 m away
- 9254 Forest LnJul 2, 2026Hvac replacement lennox 2.5 ton straight electric upflowel16 · 96 m away
- 9301 Forest Lane · Walmart Stores Texas LLCFeb 25, 20252427-1006 walmart capx-refr — renovation/alteration — replace existing cases or evap coils with alternative glycol or co2 cases or evaps. a glycol or co2 refrigeration skid will be placed on the roof. (58,243sf) · 180 m away
- 9301 Forest Ln · Walmart Stores Texas LLCOct 22, 2026Mcr install new interior door in breakroom.install new interior and exterior doors in return storage · 180 m away
- 9228 Windy Crest DrFeb 9, 202650 gallon gas install in hallway closet · 234 m away
- 9220 Windy Crest DrOct 13, 2025Gas repair · 246 m away
- 9216 Windy Crest DrAug 25, 20264 ton complete · 252 m away
- 9203 Alta Oaks DrJul 28, 2026Electrical work for pool · 315 m away
- 9221 Alta Oaks DrSep 22, 2025Replace 5 ton gas hvac unit · 320 m away
- 9137 Windy Crest DrNov 25, 2025Replacing a ton gas complete system and complete duct replacement · 336 m away
- 9131 Windy Crest DrApr 28, 2026New construction _ residential · 341 m away