New parking structures in Dallas 75243
14 addresses in 75243 have permits or project filings for parking structures in the last two years. The most recent was filed at 8600 Skyline Dr.
Latest filings
- 8600 Skyline DrNov 4, 2026Floor 4
- 11550 Plano Rd · Tillar Plano Rd Partners LPOct 21, 2026Emergency repair wire burn from tap can to the panel
- 10330 Lawler RdOct 12, 2026Electric install to include underground, site lighting
- 9779 Forest LnSep 29, 2026Install a permanent commercial electrical service and meter pole to provide 120/240v, single-phase electrical power to parking location
- 12365 Plano Rd · Ahf Waterchase LLCSep 17, 2026Remove and replace existing lighting fixtures. remove and replace existing outlets and switches
- 12000 Greenville AveSep 16, 2026Fence permit for new construction of a two-story concrete tilt-up panel building with offices, warehouse, training room, break rooms, locker rooms, restrooms, conference rooms, and balcony. the site will be developed for large fleet parking, employee staff parking, and visitor parking. the project will create a new home for water wastewater and stormwater divisions of the dallas water utilities department
- 9525 Skillman StSep 15, 2026Remodel
- 9308 Forest Ln · Bank Of AmericaSep 4, 2026Scope of work is an exterior renovation / maintenance project. scope includes site work and exterior building maintenance. site work includes: repair and restripe concrete pavement, including ada markings, to match existing; clean site lights and concrete bases throughout; remove bollards and concrete islands associated with drive-through canopy and section of depressed concrete paving around drive-through canopy; remove concrete paving to be replaced; clean, patch, and repair all concrete sidewalks, pavement, curbs, and pads throughout; repaint caution curbs throughout to match existing; paint curb of remote concrete island with yellow caution paint; install two (2) new bollards with bac standard bollard covers and hc signage; provide new bac standard bollard covers to existing bollards; clean and paint ada railing; remove and replace portion of planter wall in r.o.w.; refresh landscaping, including planting, pruning, and mulch.exterior building maintenance includes: clean, patch, and paint building facades; paint all conduit, wall-mounted utilities, downspouts, and scuppers to match adjacent finishes; remove and replace can light fixtures at window and entry soffits with new bac standard led recessed can light fixtures; clean entrance canopy skylights and replace cracked skylights if conditionwarrants; clean and paint entrance canopy. general contractor to evaluate condition of wall , where drive-through canopy is removed, notify architect of any deficiencies prior to proceeding with wall closure ; repair and repoint brick exterior wall around, and behind, drive-through canopy where canopy and vac tubes panel is removed to ensure enclosure.all signage under separate permit (n.i.c.) all signage shown is for reference only. general contractor to coordinate their work with bank of america sign vendor work
- 12111 Audelia RdAug 11, 2026Replace 3ft water line in parking lot between building 9 & 10
- 9432 Walnut StJul 29, 2026New construction of an outpatient clinic with multiple ancillary departments (imaging, lab, and pharmacy).site permit
- 10228 Bridgegate WayJul 20, 2026Nsfaa we are building a detached garage with an attic space accessed by a permanent spiral staircase. there will be an attached open air deck attached to the attic space. there will be a small retaining wall measuring 2ft high, 8 in wide and 36 ft long. we are also building a fence that will measure about 65-70 lf. the garage will have parking spaces on either side that will have swinging and sliding gate to enclose them
- 8600 Coppertowne LnJun 5, 2026Fabricate and intall a new 8-space covered parking structure
- 9820 Walnut StMar 25, 2026Install new backflow devise
- 9759 Forest Lane · City Of Dallas, Park & Recreation DepartmentAug 1, 2025Forest audelia recreation center — renovation/alteration — convert portion of an existing shopping center site to be used as a city owned urban park. work consists of demolition of parking/paving and fencing with construction of a new landscaped park with playground, splash pad, sidewalks and revised parking
- 13405 Floyd CirJun 27, 2025This job will consist of doing a new parking lot with two approaches and a sidewalk. the parking lot takes 6 in of concrete, rebar #3 every 18 in. we will also demolish the sidewalk (84’x4’) and replace it with a 104’x4’ sidewalk. this will also take 4 in of concrete, and rebar #3 every 18 in. the approaches will contain reewood and 18’ long smooth concrete dowels every 18 in. in the street smooth concrete dowels 5/8x18 will be placed. concrete psi 3,500
- 9708 Skillman StreetDec 18, 2024Metrocare skillman remodel — renovation/alteration — 16980 sq ft interior remodel of an existing mental health care facility. exterior site improvements is limited to providing handicap parking spaces and accessible routes
Questions
What parking structures are being built in Dallas 75243?
14 addresses in 75243 have permits or project filings for parking structures in the last two years. The most recent was filed at 8600 Skyline Dr. Others include 11550 Plano Rd, 10330 Lawler Rd, 9779 Forest Ln.