New parking structures in Dallas 75201
18 addresses in 75201 have permits or project filings for parking structures in the last two years. The most recent was filed at 2201 N Field St.
Latest filings
- 2201 N Field StNov 13, 2026Temporary stage 16 x 24install: 11/13/2026take down: 11/15/2026
- 2728 Mckinnon StNov 10, 2026Gas test on the grills on the 4th floor. atmos has gas shut off
- 1717 Mckinney Ave · Bizy BitesNov 9, 2026We are replacing the backflow in the mechanical room of the garage
- 2101 Cedar Springs RdOct 15, 2026Relocate four existing thermostats to the new location as shown on the plan. confirm that the thermostats are associated with the terminal box as shown on the drawing before relocating and ensure they are in working order.2. provide one acoustically lined return air boot through the wall to the deck as high as possible above the ceiling, with an inlet elbow and an outlet 90° elbow facing upward. size per plans. refer to detail sheet m0.01 for more information.3. relocate two return air grilles and related boots to the new location as indicated on the drawings.4. relocate two return air boots as indicated on the drawings.5. relocate three existing terminal boxes. remove existing medium and low-pressure ductwork as indicated on the drawings.6. install three terminal boxes at the new location. mount the boxes from the structure above. ensure box clearances are maintained at the new location. extend new medium and low-pressure ducts as indicated on the drawings. coordinate relocation with other trades involved.7. provide one access panel for equipment access requirements. refer to architectural plans for additional information and coordinate the exact location with the architect and the installed location of equipment in the field.8. provide one return air opening through the wall to the deck.9. provide two new trane vavs with controls.10. provide ductwork and insulation per plan.11. provide a certified tab report
- 2104 Pacific AveOct 14, 2026Replace damaged parking lot lighting panel. esid10443720002850491
- 1818 Corsicana StOct 12, 2026Add a gas generator and add a new 2 inches gas line outside biulding. underground gas line 350 liner foot
- 2816 Fairmount StOct 5, 2026Demolition of structures, foundations, trees, & parking areas as shown on demolition plan
- 1217 Patterson StSep 30, 2026An 8 feet tall construction fence and gate are needed around the property for a construction office trailer and for a material laydown area. one side of the lot is on the corner of patterson and n field st.. the other side of the lot faces san jacinto street. the lot is currently used only for parking
- 2201 North Field Street · Perot Museum ExpansionJul 29, 2026Perot museum expansion — new construction — new construction of 4 level parking garage, new covered walkway to museum entry and museum addition of event space and restrooms
- 2013 Jackson StJul 27, 2026Generator mechanical
- 300 S Harwood StJun 8, 2026On june 24, 2026, japan fans will be renting and permitting the harwood park area for their mini fan festival with live music, speakers, and food trucks. they have contracted out big d rentals to come out and build a stage for their event
- 2921 Mckinnon StJun 2, 2026Adding 6 mini splits to parking garage vestibules, floors included 3,4,5,6,7,8 and 9
- 2500 Cedar Springs RdNov 14, 2025Qteam meeting 2.18.2026 (9am) phase 1 of a multi-phase project. new construction of below grade parking structure to support 3 high rise towers, lid and future towers not in this scope
- 3031 N Harwood StJul 21, 2025Qteam meeting 9.4.2025 3131 n harwood for office and 3031 n harwood for hotel 29 story hotel/condo tower, core/shell & interiors (1 lobby level/amenity level/8 levels hotel/13 levels condo)17 level office building, core & shell (level 1 lobby, 16 levels office)4 above grade parking 3 stories of basement level
- 2719 Routh StJul 2, 2025Rear concrete parking area will remain. demolish two story structure and foundation. remove adjacent private sidewalk and flatwork. basement (appx: 35; x 16' x 8'): break up/remove concrete and backfill and compact
- 1990 Jackson StMay 30, 2025Relocate meter from basement parking garage to new location at side walk
- 300 N St Paul StMay 29, 2025Relocate meter from basement parking garage to new location at sidewalk
- 904 S Ervay StMay 23, 2025Demolition the existing building at 904 s ervay st. all restructures to be removed. no trees will be removed.**all structures to be removed. all debris removed. no tree removal. parking lot to remain until 5-16-26. dbax
Questions
What parking structures are being built in Dallas 75201?
18 addresses in 75201 have permits or project filings for parking structures in the last two years. The most recent was filed at 2201 N Field St. Others include 2728 Mckinnon St, 1717 Mckinney Ave, 2101 Cedar Springs Rd.
How can I find out when a new parking project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new parking project permit is filed.