2101 Cedar Springs Rd
Dallas, TX 75201 · Spec Suite 1540, US Bank Private Wealth Buildout - Dallas
Commercial interior and building-system work at 2101 Cedar Springs
Commercial permits at 2101 Cedar Springs Rd indicate interior remodels and updates to HVAC, electrical and plumbing systems. The latest listed permit, filed October 15, 2026, covers relocating thermostats, air grilles and terminal boxes and installing two new Trane VAV units.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 16, 2026
- Projects
- 58
- 58 filings
- Latest filing
- Nov 16, 2026
- since Nov 16, 2026
- Largest scope
- —
- Estimated cost
- $647K
- state registration
Permit & project history
58 projectsRelocate four existing thermostats to the new location as shown on the plan. confirm that the thermostats are associated with the terminal box as shown on the drawing before relocating and ensure they are in working order.2. provide one acoustically lined return air boot through the wall to the deck as high as possible above the ceiling, with an inlet elbow and an outlet 90° elbow facing upward. size per plans. refer to detail sheet m0.01 for more information.3. relocate two return air grilles and related boots to the new location as indicated on the drawings.4. relocate two return air boots as indicated on the drawings.5. relocate three existing terminal boxes. remove existing medium and low-pressure ductwork as indicated on the drawings.6. install three terminal boxes at the new location. mount the boxes from the structure above. ensure box clearances are maintained at the new location. extend new medium and low-pressure ducts as indicated on the drawings. coordinate relocation with other trades involved.7. provide one access panel for equipment access requirements. refer to architectural plans for additional information and coordinate the exact location with the architect and the installed location of equipment in the field.8. provide one return air opening through the wall to the deck.9. provide two new trane vavs with controls.10. provide ductwork and insulation per plan.11. provide a certified tab report
Relocate four existing thermostats to the new location as shown on the plan. confirm that the thermostats are associated with the terminal box as shown on the drawing before relocating and ensure they are in working order.2. provide one acoustically lined return air boot through the wall to the deck as high as possible above the ceiling, with an inlet elbow and an outlet 90° elbow facing upward. size per plans. refer to detail sheet m0.01 for more information.3. relocate two return air grilles and related boots to the new location as indicated on the drawings.4. relocate two return air boots as indicated on the drawings.5. relocate three existing terminal boxes. remove existing medium and low-pressure ductwork as indicated on the drawings.6. install three terminal boxes at the new location. mount the boxes from the structure above. ensure box clearances are maintained at the new location. extend new medium and low-pressure ducts as indicated on the drawings. coordinate relocation with other trades involved.7. provide one access panel for equipment access requirements. refer to architectural plans for additional information and coordinate the exact location with the architect and the installed location of equipment in the field.8. provide one return air opening through the wall to the deck.9. provide two new trane vavs with controls.10. provide ductwork and insulation per plan.11. provide a certified tab report
City of Dallas permitCommercial Mechanical PermitDemolition (1) sink, (1) faucet and (1) water heater. provide and install (1) new sink, (1) faucet, (1) point of use water heater, (2) hub drain and (1) backflow preventor
Demolition (1) sink, (1) faucet and (1) water heater. provide and install (1) new sink, (1) faucet, (1) point of use water heater, (2) hub drain and (1) backflow preventor
City of Dallas permitCommercial Plumbing PermitTenant improvement — rosewood court
TDLR project registrationRenovation/AlterationProject Closed2,789 sq ft$250K est.- Project #
- TABS2025027061
- Tenant / owner
- Spec Suite 1540
- Design firm
- Pro
- Contact
- Pro
Furnish and install4 vav boxescontrols by trane15 supply grilles9lay in return grilles9 slot diffusers2 vav boxesdemo duct work
Furnish and install4 vav boxescontrols by trane15 supply grilles9lay in return grilles9 slot diffusers2 vav boxesdemo duct work
City of Dallas permitCommercial Mechanical Permit3,335 sq ft interior office build out — rosewood court
TDLR project registrationNew ConstructionProject Closed3,335 sq ft$647K est.- Project #
- TABS2024004848
- Tenant / owner
- US Bank Private Wealth Buildout - Dallas
- Design firm
- Pro
- Contact
- Pro
+ 18 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2101 Cedar Springs Rd
What is being built at 2101 Cedar Springs Rd in Dallas?
Recent permits indicate commercial interior remodels and building-system work, including HVAC, electrical and plumbing updates. The records do not identify a new tenant or a larger new construction project.
When was the latest permit filed for 2101 Cedar Springs Rd?
The latest listed permit was filed October 15, 2026. Permit COM-MEC-26-002666 covers HVAC changes, including relocating equipment and installing two new Trane VAV units.
Are there office renovations at 2101 Cedar Springs in Dallas?
Permits indicate commercial interior remodeling at the address. A July 2, 2026, alteration permit describes a 5,257-square-foot usable, 6,401-square-foot rentable interior remodel.
What HVAC work is permitted at 2101 Cedar Springs Rd?
The October 15, 2026, mechanical permit describes relocating thermostats, return air grilles and terminal boxes, and installing two new Trane VAV units. A separate July 23, 2026, permit describes reworking existing HVAC.
Are electrical and plumbing upgrades planned at 2101 Cedar Springs?
The permit records include electrical remodel permits and plumbing work, including a June 9, 2026, interior-remodel plumbing permit and a July 21, 2026, permit to add a water line to a fridge.
Also being built nearby
All of 75201- 2101 Cedar Sprigns Road · Rosewood Court, LLCMar 9, 2026Rosewood court - conference center — renovation/alteration — tenant improvement renovation
- 2101 Cedar Springs Road · Rosewood Court, LLCJun 22, 2026Griffin highline — renovation/alteration — tenant improvement
- 2020 Cedar Springs · Gpi Hrlp M&o LPApr 8, 2026Sweat440 — renovation/alteration — tenant finish for a fitness concept in prior fitness space 3128 sq ft · 41 m away
- 2020 Cedar Springs RdNov 3, 2026Installation new dehumidifier · 41 m away
- 2025 Cedar Springs RdOct 27, 2020Service release no work · 50 m away
- 2501 N Harwood St · Horizon Propco I LPNov 12, 2026This is for the whole building: temporary disconnect/reconnect for maintenance and testing purposes only. a release to oncor will be needed · 63 m away
- 2501 North Hardwood St · Horizon Propco I LPApr 17, 2026Confidential — renovation/alteration — interior renovation on level 19 of existing building. renovation includes the addition of secure doors · 63 m away
- 2501 N Harwood · Saint Ann Court (harwood District No. 6)Sep 2, 202612th floor restrooms — renovation/alteration — capital improvement · 63 m away
- 2525 Mckinnon Street 6th · Cio 2525 Mckinnon, LPOct 13, 20256th floor elevator lobby — renovation/alteration — capital improvement · 93 m away
- 2525 Mckinnon Street · Cio 2525 Mckinnon, LPDec 9, 2024Crowe & dunlevy — renovation/alteration — tenant improvement · 93 m away
- 2525 Mckinnon St · Cio 2525 Mckinnon, LPJan 15, 2026Electrical remodel · 93 m away
- 2601 Olive StJul 29, 2026Mcr interior white-box renovation of approximately 6,321 sq ft consisting of 4,675 sq ft at level 1 and 1,646 sq ft at the existing mezzanine level. scope includes demolition of existing lobby finishes, glazing systems, stair elements, partitions, ceilings, and associated mep systems; construction of new lobby architectural features, storefront entrance systems, guardrails, ceilings, finishes, and related structural, mechanical, electrical, plumbing, and fire protection work. existing occupancy remains business (group b). no increase in building area, height, or occupant load is proposed · 114 m away