Permits cover generator and plumbing work at 1818 Corsicana St
City of Dallas permits indicate upgrades to the building at 1818 Corsicana St, including a gas generator and a new underground gas line. The latest related permits were filed October 9 and 12, 2026. Other 2026 permits cover plumbing work in the restrooms and laundry room, plus a grease interceptor and drainage work.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 12, 2026
- Projects
- 12
- 12 filings
- Latest filing
- Oct 12, 2026
- since Sep 13, 2024
- Largest scope
- 1,600 sf
- Estimated cost
- $275K
- state registration
Permit & project history
12 projectsAdd a gas generator and add a new 2 inches gas line outside biulding. underground gas line 350 liner foot
Add a gas generator and add a new 2 inches gas line outside biulding. underground gas line 350 liner foot
City of Dallas permitCommercial Plumbing PermitRough:replacing sanitary line throughout building and connecting to main line with pvc pipe/fittings. will be tunneling roughly 170ft with 2 access holes. dirt will be placed at dumpster area and in lawn inside the complex. saw cutting 20ft from access hole to main line. there will be another access (5ftx5ft) at the connection point to the main. all trenches will be covered with steel plates for security and work will comply with current dallas plumbing codes.pavilion building - top out:inside the restroom there will be 15 wall mount industrial water closets, and 6 industrial urinals replaced with new. flush valves to be reused. in the chase for the urinals the vent pipe and connection points to the fixtures will be reconfigured. the chase for the wall mount water closets will be reconfigured to add carriers and redo the vent pipe in the chase before going vertical. all vent pipe after 3ft will be existing to remain. the water lines will be reinsulated in fiberglass in both chases. rebuild all inoperable shower valves. any extras will be left with maintenance staff
Rough:replacing sanitary line throughout building and connecting to main line with pvc pipe/fittings. will be tunneling roughly 170ft with 2 access holes. dirt will be placed at dumpster area and in lawn inside the complex. saw cutting 20ft from access hole to main line. there will be another access (5ftx5ft) at the connection point to the main. all trenches will be covered with steel plates for security and work will comply with current dallas plumbing codes.pavilion building - top out:inside the restroom there will be 15 wall mount industrial water closets, and 6 industrial urinals replaced with new. flush valves to be reused. in the chase for the urinals the vent pipe and connection points to the fixtures will be reconfigured. the chase for the wall mount water closets will be reconfigured to add carriers and redo the vent pipe in the chase before going vertical. all vent pipe after 3ft will be existing to remain. the water lines will be reinsulated in fiberglass in both chases. rebuild all inoperable shower valves. any extras will be left with maintenance staff
City of Dallas permitCommercial Plumbing PermitLaundry room in welcome building plumbing in (6) new floor sinks to serve new laundry equipment as well as new plumbing as per code to serve new clothes washers and clothes dryers. the installation of the floor sinks will require a saw cut across the room to make connection to sanitary line. connections to new equipment to be made by appliance supplier and all a-star would be responsible for is providing the drain locations(floor sinks), clean outs, connections to existing sanitary, vents where possible, boiler drains, hot/cold water drops for washers, and reconfiguring dryer duct venting utilizing existing gas openings and roof penetrations for gas supply and vent roof penetrations
Laundry room in welcome building plumbing in (6) new floor sinks to serve new laundry equipment as well as new plumbing as per code to serve new clothes washers and clothes dryers. the installation of the floor sinks will require a saw cut across the room to make connection to sanitary line. connections to new equipment to be made by appliance supplier and all a-star would be responsible for is providing the drain locations(floor sinks), clean outs, connections to existing sanitary, vents where possible, boiler drains, hot/cold water drops for washers, and reconfiguring dryer duct venting utilizing existing gas openings and roof penetrations for gas supply and vent roof penetrations
City of Dallas permitCommercial Plumbing PermitProviding a 75 gal grease interceptor, sample well, hose bib, 24ft trench drain, and graded concrete pad for dumpster relocation. the hose bib will be placed along the side of the dumpster location. the trench drain will be placed on the back of the dumpster area. the grease trap/sample well will be installed in the 2 closest parking spots to (north), approximately 5ft from the main water lines that supply the building and and away from the path of the dumpster trucks path. the tie in will be on the main line located on the main drive into the parking lot
Providing a 75 gal grease interceptor, sample well, hose bib, 24ft trench drain, and graded concrete pad for dumpster relocation. the hose bib will be placed along the side of the dumpster location. the trench drain will be placed on the back of the dumpster area. the grease trap/sample well will be installed in the 2 closest parking spots to (north), approximately 5ft from the main water lines that supply the building and and away from the path of the dumpster trucks path. the tie in will be on the main line located on the main drive into the parking lot
City of Dallas permitCommercial Plumbing PermitReconfigure group (conference) rooms into open office space. — the bridge hrc
TDLR project registrationRenovation/AlterationProject Closed1,600 sq ft$50K est.- Project #
- TABS2025000991
- Tenant / owner
- The Bridge - Office Renovation
- Design firm
- Pro
- Contact
- Pro
Renovations to welcome building cell phone rm; kennel storage room; kennel outside storage room. pavilion: add new enclosed vestibule extension. — the bridge homeless recovery center
TDLR project registrationAdditions to Existing BuildingProject Closed5,000 sq ft$275K est.- Project #
- TABS2023018704
- Tenant / owner
- The Bridge - Pavilion Redesign And Construction
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 1818 Corsicana St
What is being built at 1818 Corsicana St in Dallas?
City permits indicate building upgrades rather than a new building, including a gas generator, plumbing work, and drainage improvements. A plumbing permit filed October 12, 2026, describes a new 2-inch gas line.
Is a generator being added at 1818 Corsicana St?
Yes. A City of Dallas electrical permit filed October 9, 2026, lists a generator, and a plumbing permit filed October 12 describes adding a gas generator and underground gas line.
What plumbing work is planned at 1818 Corsicana St?
Permits filed in 2026 cover replacement of a sanitary line, restroom fixture and vent-pipe work, and plumbing for laundry equipment. The sanitary-line permit, COM-PLM-26-001582, was filed April 28, 2026.
Is there a laundry room renovation at 1818 Corsicana St?
A City of Dallas plumbing permit filed April 24, 2026, describes plumbing for new laundry equipment in the welcome building. The work includes floor sinks, water connections, and dryer vent reconfiguration.
What is the dumpster-area work at 1818 Corsicana St?
A plumbing permit filed March 17, 2026, describes a grease interceptor, sample well, trench drain, and concrete pad for relocating a dumpster.
Is the HVAC system being replaced at 1818 Corsicana St?
A mechanical permit filed December 10, 2025, describes removing and replacing an existing 50-ton rooftop unit with a like unit.
When were permits filed for work at 1818 Corsicana St?
The records span September 11, 2025, through October 12, 2026. The most recent filings cover a generator and gas-line work.
Also being built nearby
All of 75201- 1714 Corsicana StDec 30, 2025Gas test · 140 m away
- 1909 Cadiz StFeb 12, 2026Install new electrical service and pole lights · 163 m away
- 912 South Ervay Street · Dallas Independent School DistrictJun 11, 2025Disd nolan estes — new construction — 142,000 sq ft, 3-story, new construction pk-12 school · 181 m away
- 912 S Ervay StOct 23, 2026Lvl 3 area a dsst-disd nolan estes building. new construction pk-12 school · 181 m away
- 904 S Ervay StMay 23, 2025Demolition the existing building at 904 s ervay st. all restructures to be removed. no trees will be removed.**all structures to be removed. all debris removed. no tree removal. parking lot to remain until 5-16-26. dbax · 185 m away
- 1820 Canton St · Infinanza LLCMay 19, 2026Phase - alteration addition · 203 m away
- 1011 S Harwood StOct 17, 2025Needing to pull a new permit to fix issues with old permits billing. we were told by jessica hernandez at w&ww to pull a new permit to get our issue fixed · 224 m away
- 1908 Canton StFeb 18, 2026Restaurant without drive-in or drive trhough service comercial remodel to restaurant · 225 m away
- 1903 Marilla StMar 25, 2026No occupancy granted only upgrade electric service- meter base and disconnect, electrical 200 amp service · 229 m away
- 1907 Marilla StMar 24, 2026Upgrade electrical service- meter base and disconnect 200 amp new meter · 229 m away
- 920 S Harwood StMay 22, 2026Zo bc this is to formalize the storefront added to a common area space of 324 sq ft co'd in 2017 as part of the shell building. this is to show work done in this space...already inspected with co 25-000558. tenant of space uses already existing electrical, there is no plumbing, all else is furniture for displays and a rolling point of sale. all walls are existing from common space co'd (2017) finish out (1 wall), constituting either cmu block, concrete, aluminum storefront with glass or 5/8" x rock (1 side). ceiling is open with no changes from (2017). lighting is also existing from the 2017 shell finish · 237 m away
- 906 S Harwood StMay 5, 2026Provide power for the kiosk · 238 m away
More warehouses & industrial in 75201, offices in 75201, parking structures in 75201.