1820 Canton St
Dallas, TX 75201 · Infinanza LLC
The Arbor building remodel and second-floor addition
The Arbor is remodeling an existing commercial building at 1820 Canton St and adding a second-floor area. The TDLR registration filed January 5, 2026, describes a 3,000-square-foot addition and white-box space for future tenants; a City of Dallas permit filed May 19 describes an approximately 4,000-square-foot addition. The applicant’s estimated project cost is $1.2 million.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated May 19, 2026
- Projects
- 5
- 5 filings
- Latest filing
- May 19, 2026
- since Jan 5, 2026
- Largest scope
- 11,836 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
Under constructionTHE ARBOR
11,836 sq ft · $1.2M est.
- RegisteredJan 5, 2026
- Plan review
- ConstructionFeb '26 – Jun '28
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
5 projectsQteam meeting 1.21.2026 (1:30 pm) this project involves remodeling an existing commercial building and adding a new second-floor area of approximately 4,000 square feet. the work also includes converting shell spaces ( white box ) to make them ready for future tenants. the scope covers essential structural work, mep installations, and core building services so that the spaces can be leased without additional base-build upgrades
Qteam meeting 1.21.2026 (1:30 pm) this project involves remodeling an existing commercial building and adding a new second-floor area of approximately 4,000 square feet. the work also includes converting shell spaces ( white box ) to make them ready for future tenants. the scope covers essential structural work, mep installations, and core building services so that the spaces can be leased without additional base-build upgrades
City of Dallas permitCommercial Alteration Addition PermitRemodeling an existing commercial building and adding a new second-floor area of 3,000 square feet. the work also includes converting shell spaces as ( white box ) to make them ready for future tenants. — the arbor commercial building
TDLR project registrationAdditions to Existing BuildingReview Complete11,836 sq ft$1.2M est.- Project #
- TABS2026009226
- Tenant / owner
- The Arbor
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 1820 Canton St
What is being built at 1820 Canton St in Dallas?
The project remodels The Arbor’s existing commercial building, adds a second-floor area and prepares shell spaces for future tenants. The TDLR registration was filed January 5, 2026, and a City of Dallas alteration and addition permit was filed May 19, 2026.
Is The Arbor adding a second floor at 1820 Canton St?
Yes. The TDLR registration, TABS2026009226, describes a new 3,000-square-foot second-floor area. A later City of Dallas permit description says the addition is approximately 4,000 square feet.
What are the white-box spaces at The Arbor for?
The permit description says the shell spaces will be converted to white-box spaces to prepare them for future tenants. It does not identify those tenants.
How much will the 1820 Canton St project cost?
The TDLR registration lists an applicant-estimated project cost of $1.2 million. This is an estimate, not a confirmed final cost.
What is being renovated near J Erik Johsson Central Library?
The Arbor at 1820 Canton St is being remodeled, with a second-floor addition and spaces prepared for future tenants. The library is listed as a nearby landmark, about 183 meters away.
When were permits filed for The Arbor project in Dallas?
The TDLR project registration TABS2026009226 was filed January 5, 2026. A City of Dallas commercial alteration and addition permit, COM-ALT-ADD-25-002001, was filed May 19, 2026.
Also being built nearby
All of 75201- 711 S St Paul StSep 23, 2020Replace or modify existing hvac · 59 m away
- 1908 Canton StFeb 18, 2026Restaurant without drive-in or drive trhough service comercial remodel to restaurant · 92 m away
- 1903 Marilla StMar 25, 2026No occupancy granted only upgrade electric service- meter base and disconnect, electrical 200 amp service · 115 m away
- 1907 Marilla StMar 24, 2026Upgrade electrical service- meter base and disconnect 200 amp new meter · 120 m away
- 555 Evergreen StJul 23, 2025Electrical remodel · 128 m away
- 1909 Cadiz StFeb 12, 2026Install new electrical service and pole lights · 148 m away
- 508 Park AveOct 7, 2026Replacing an old wood plank fencefabricate & install steel fence with steel mesh 64' lf of fencing with one 36" wide gate with 9foot height.one 9' lf section with 9' height.material to consist of 2" square tubing, 14 gauge, with 3/16" welded wire mesh on a picture frame constructed from 2" x 3/8" flat bar steel.fencing to be fabricated in roughly 12' sections/assemblies. actual section lengths may vary as required for the installation. panel assembly heights may vary slightly due to the existing slope of the ground after installation. panels will be installed in a step a down style to follow the grade.fence will have a black powder coat finish · 154 m away
- 1835 Young Street · First Presbyterian Church Of DallasJan 10, 2025Fpc 3rd floor fire sprinkler improvements — renovation/alteration — upgrade existing partitions to form fire separation wall for new sprinklered area. add horizontal sliding fire door at existing corridor · 169 m away
- 1803 Young StJun 23, 2025This is an electrical service for a city traffic signal at young and st. paul · 174 m away
- 1515 Young Street · City Of DallasFeb 2, 2026J erik johsson central library 1st floor restroom altercations — renovation/alteration — restroom finish updates · 183 m away
- 1515 Young StJun 24, 2026Electrical remodel · 183 m away
- 904 S Ervay StMay 23, 2025Demolition the existing building at 904 s ervay st. all restructures to be removed. no trees will be removed.**all structures to be removed. all debris removed. no tree removal. parking lot to remain until 5-16-26. dbax · 191 m away