1515 Young St
Dallas, TX 75201
First-floor library restrooms to be renovated at 1515 Young St
Permits indicate a renovation of the first-floor men’s and women’s restrooms at the J. Erik Jonsson Central Library, 1515 Young St. The alteration permit was filed April 20, 2026, and describes demolition and replacement of restroom finishes, fixtures, lighting and other components. Additional permits filed through June 24 cover a bathroom remodel, patio fence installation and electrical remodel.
Summarized from City of Dallas records · updated Jun 24, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 24, 2026
- since Apr 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsZo bc **city project** this permit application is for a renovation of the first-floor men’s and women’s restrooms at the j. erik jonsson central library, located at 1515 young street in dallas, tx, 75201. there will be a demolition component and a new construction component to this project, a brief description of which is provided below. for additional information and full project scope please examine the other exhibits included with this permit application.the demolition will involve:-removing existing wall-hung toilets, urinals, toilet partitions, grab bars, seat cover dispensers, toil paper dispensers, and various other bathroom accessories.-removing wall tile, floor tile, and wall bases.-removing existing countertops, backsplashes, sinks and faucets.-removing existing automatic soap dispensers, mirrors, paper towel dispensers, and waste receptacles.-removing existing automatic door openers-removing existing stickers, signage, wallpaper, and existing floor transitions.-removing existing doors and door frames and creating a new cased opening around the entrances to the bathrooms. the new construction will involve-installing new 3 5/8” metal studs along plumbing walls and installing drywall.-removing and reinstalling two existing wall-mounted fire alarm devices as needed.-installing new full-height wall tile, new floor tile and new cove bases. -installing new wall-hung urinals, new wall-hung toilets, and new toilet partitions.-patching, repairing, and painting drywall, as well as painting trim.-building out an existing wall to frame in a water-fountain so the fountain doesn’t project past 4” into the path-of-egress.-installing new signage-installing new flooring transitions-installing new countertops, sinks, and faucets.-furring out walls as needed to allow for proper installation of recessed bathroom hardware.-replacing existing light fixtures with new led light fixtures.-providing new light switch with override to occupancy sensor.-providing power for electric paper towel dispensers and hardwire faucets.-providing dedicated electrical circuits.-replacing existing ceiling exhaust air grille.-abandoning return air boot above the ceiling and removing existing air grilles and patching the existing ceiling.-replacing plumbing fixtures and pipes as necessary.-replacing an existing 8” floor drain grate cover with a new grate cover
Zo bc **city project** this permit application is for a renovation of the first-floor men’s and women’s restrooms at the j. erik jonsson central library, located at 1515 young street in dallas, tx, 75201. there will be a demolition component and a new construction component to this project, a brief description of which is provided below. for additional information and full project scope please examine the other exhibits included with this permit application.the demolition will involve:-removing existing wall-hung toilets, urinals, toilet partitions, grab bars, seat cover dispensers, toil paper dispensers, and various other bathroom accessories.-removing wall tile, floor tile, and wall bases.-removing existing countertops, backsplashes, sinks and faucets.-removing existing automatic soap dispensers, mirrors, paper towel dispensers, and waste receptacles.-removing existing automatic door openers-removing existing stickers, signage, wallpaper, and existing floor transitions.-removing existing doors and door frames and creating a new cased opening around the entrances to the bathrooms. the new construction will involve-installing new 3 5/8” metal studs along plumbing walls and installing drywall.-removing and reinstalling two existing wall-mounted fire alarm devices as needed.-installing new full-height wall tile, new floor tile and new cove bases. -installing new wall-hung urinals, new wall-hung toilets, and new toilet partitions.-patching, repairing, and painting drywall, as well as painting trim.-building out an existing wall to frame in a water-fountain so the fountain doesn’t project past 4” into the path-of-egress.-installing new signage-installing new flooring transitions-installing new countertops, sinks, and faucets.-furring out walls as needed to allow for proper installation of recessed bathroom hardware.-replacing existing light fixtures with new led light fixtures.-providing new light switch with override to occupancy sensor.-providing power for electric paper towel dispensers and hardwire faucets.-providing dedicated electrical circuits.-replacing existing ceiling exhaust air grille.-abandoning return air boot above the ceiling and removing existing air grilles and patching the existing ceiling.-replacing plumbing fixtures and pipes as necessary.-replacing an existing 8” floor drain grate cover with a new grate cover
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1515 Young St
What is being renovated at 1515 Young St in Dallas?
Permits indicate that the first-floor men’s and women’s restrooms at the J. Erik Jonsson Central Library are being renovated. The alteration permit, COM-ALT-ADD-26-000636, was filed April 20, 2026.
What work is planned for the library restrooms?
The permit describes removing and replacing restroom tile, fixtures, partitions, countertops, sinks, faucets, lighting and other components. It also includes changes to doors, signage and plumbing.
When were permits filed for 1515 Young St?
The first listed filing was April 20, 2026, for a commercial alteration. Additional filings were recorded May 1, April 27 and June 24, 2026.
Are there other permits at 1515 Young St besides the restroom renovation?
Yes. The records include a bathroom remodel permit filed May 1, a patio fence permit filed April 27, and an electrical remodel permit filed June 24, 2026.
What work is happening near The Arbor in Dallas?
Permits at 1515 Young St, about 183 meters from The Arbor, indicate a renovation of the J. Erik Jonsson Central Library’s first-floor restrooms. The alteration permit was filed April 20, 2026.
Is a new business opening at 1515 Young St?
The records describe restroom renovation work at the J. Erik Jonsson Central Library, along with bathroom, electrical and patio-fence permits. They do not identify a new business opening.
Also being built nearby
All of 75201- 1515 Young Street · City Of DallasFeb 2, 2026J erik johsson central library 1st floor restroom altercations — renovation/alteration — restroom finish updates
- 1803 Young StJun 23, 2025This is an electrical service for a city traffic signal at young and st. paul · 29 m away
- 1835 Young Street · First Presbyterian Church Of DallasJan 10, 2025Fpc 3rd floor fire sprinkler improvements — renovation/alteration — upgrade existing partitions to form fire separation wall for new sprinklered area. add horizontal sliding fire door at existing corridor · 56 m away
- 555 Evergreen StJul 23, 2025Electrical remodel · 72 m away
- 1724 Young StJul 22, 2025Electrical remodel · 96 m away
- 400 S St Paul StOct 5, 2026Providing power to motors and motor control for grease trap · 106 m away
- 1818 Wood StSep 18, 2025Mcr we will install a fire-rated pocket door manufactured by won-door. we will frame the pocket to meet the current fire code, and one circuit will be installed to operate the door · 110 m away
- 1805 Wood StJun 23, 2025This is an electrical service for a city traffic signal at st. paul and wood st · 119 m away
- 500 S Ervay · Lowen HospitalityOct 4, 2024Fairfield-towneplace downtown remodel — renovation/alteration — 6,000 sq ft of remodel including main laundry room, front checkout/market area, and addition of bar in main lobby · 122 m away
- 500 S Ervay StJul 23, 2025Electrical remodel · 122 m away
- 508 Park AveOct 7, 2026Replacing an old wood plank fencefabricate & install steel fence with steel mesh 64' lf of fencing with one 36" wide gate with 9foot height.one 9' lf section with 9' height.material to consist of 2" square tubing, 14 gauge, with 3/16" welded wire mesh on a picture frame constructed from 2" x 3/8" flat bar steel.fencing to be fabricated in roughly 12' sections/assemblies. actual section lengths may vary as required for the installation. panel assembly heights may vary slightly due to the existing slope of the ground after installation. panels will be installed in a step a down style to follow the grade.fence will have a black powder coat finish · 123 m away
- 711 S St Paul StSep 23, 2020Replace or modify existing hvac · 140 m away
More demolitions in 75201.