400 S St Paul St
Dallas, TX 75201
Retail suite finish-out and grease interceptor work in Dallas
Dallas permits indicate an existing retail space at 400 S St Paul St is being finished out for the market, with work including HVAC, restrooms, electrical, drywall and paint. The finish-out permit was filed March 30, 2026, and later permits in 2026 cover a grease interceptor and related electrical work.
Summarized from City of Dallas records · updated Oct 5, 2026
- Projects
- 11
- 11 filings
- Latest filing
- Oct 5, 2026
- since Feb 16, 2022
- Largest scope
- —
- Listed value
- $3.8M
- partial · often understated
Permit & project history
11 projectsInstall a new code-compliant grease interceptor. connect the interceptor outlet to the existing sanitary sewer system. work includes required excavation, piping, fittings, venting, cleanouts, backfill, testing, and inspections in accordance with the approved plans and city of dallas requirements
Install a new code-compliant grease interceptor. connect the interceptor outlet to the existing sanitary sewer system. work includes required excavation, piping, fittings, venting, cleanouts, backfill, testing, and inspections in accordance with the approved plans and city of dallas requirements
City of Dallas permitCommercial Plumbing PermitInstall a new code-compliant grease interceptor and connect the designated kitchen fixtures to the interceptor. connect the interceptor outlet to the existing sanitary sewer system. work includes required excavation, piping, fittings, venting, cleanouts, backfill, testing, and inspections in accordance with the approved plans and city of dallas requirements
Install a new code-compliant grease interceptor and connect the designated kitchen fixtures to the interceptor. connect the interceptor outlet to the existing sanitary sewer system. work includes required excavation, piping, fittings, venting, cleanouts, backfill, testing, and inspections in accordance with the approved plans and city of dallas requirements
City of Dallas permitCommercial Plumbing PermitSupply new power to retail suite from electrical room. install new step down transformer in suite, new panel and wire to new outlets and lights
Supply new power to retail suite from electrical room. install new step down transformer in suite, new panel and wire to new outlets and lights
City of Dallas permitCommercial Electrical PermitFinish out and co required prior to occupancy* mcr white box existing space to market - including hvac, restrooms, electrical work, drywall and paint
Finish out and co required prior to occupancy* mcr white box existing space to market - including hvac, restrooms, electrical work, drywall and paint
City of Dallas permitCommercial Alteration Addition PermitConstruction of a 333 unit multifamily building with structured parking, amenities and retail space
Construction of a 333 unit multifamily building with structured parking, amenities and retail space
City of Dallas permitCommercial Plumbing Permit$3.8M
Sources: City of Dallas
Questions about 400 S St Paul St
What is being built at 400 S St Paul St in Dallas?
Permits describe a finish-out of an existing retail space, including HVAC, restrooms, electrical work, drywall and paint. Later permits cover a grease interceptor and kitchen-fixture connections.
Is a restaurant opening at 400 S St Paul St?
Dallas permits include grease-interceptor work and plumbing for designated kitchen fixtures, which indicate food-service-related work. The records do not name a business or confirm an opening.
When was the finish-out at 400 S St Paul St permitted?
The commercial alteration permit, COM-ALT-ADD-26-000612, was filed March 30, 2026. It describes finishing out an existing space for the market.
What work is planned for the retail space at 400 S St Paul St?
The March 2026 permit describes HVAC, restroom, electrical, drywall and paint work. Separate permits cover a four-ton heat pump, retail-suite power, and plumbing for a restroom and mop room.
What is the grease interceptor work at 400 S St Paul St?
Permits filed August 10 and September 23, 2026, describe installing a grease interceptor and connecting it to the existing sanitary sewer. Electrical permits for grease-trap equipment were filed October 1 and October 5.
Do the permits identify the business at 400 S St Paul St?
No business or tenant is named in the listed Dallas permits.
Also being built nearby
All of 75201- 1805 Wood StJun 23, 2025This is an electrical service for a city traffic signal at st. paul and wood st · 13 m away
- 1818 Wood StSep 18, 2025Mcr we will install a fire-rated pocket door manufactured by won-door. we will frame the pocket to meet the current fire code, and one circuit will be installed to operate the door · 14 m away
- 1919 Jackson StApr 1, 2026Relocate plug and light · 86 m away
- 1947 Jackson StNov 2, 2020Permanent electrical service · 101 m away
- 1803 Young StJun 23, 2025This is an electrical service for a city traffic signal at young and st. paul · 104 m away
- 1515 Young Street · City Of DallasFeb 2, 2026J erik johsson central library 1st floor restroom altercations — renovation/alteration — restroom finish updates · 106 m away
- 1515 Young StJun 24, 2026Electrical remodel · 106 m away
- 1835 Young Street · First Presbyterian Church Of DallasJan 10, 2025Fpc 3rd floor fire sprinkler improvements — renovation/alteration — upgrade existing partitions to form fire separation wall for new sprinklered area. add horizontal sliding fire door at existing corridor · 108 m away
- 1990 Jackson StMay 30, 2025Relocate meter from basement parking garage to new location at side walk · 134 m away
- 400 S Ervay StMay 13, 2025Rn199in - tankless water heater in · 150 m away
- 418 S Ervay StNov 11, 2020Install fire alarm system · 151 m away
- 1914 Commerce Street · Dining LoungeMay 21, 2025Sauvage restaurant — renovation/alteration — remodel · 153 m away
More apartments & multifamily in 75201, parking structures in 75201, restaurants in 75201.