New parking structures in Dallas 75208
18 addresses in 75208 have permits or project filings for parking structures in the last two years. The most recent was filed at 315 Sunset Ave.
Latest filings
- 315 Sunset AveNov 9, 2026This location was recently review. owner change scope and want to demolition building, foundation and parking. demolition all
- 411 W Commerce StNov 5, 2026#303 changeout existing system & install 1.5 ton split system
- 114 W 7th StNov 4, 2026Remodeling - moving bar area to center of building
- 663 W Davis StNov 3, 2026Ground up cafe with greenhouse
- 1400 W Commerce StNov 3, 2026New plumbing construction
- 519 W Davis StSep 18, 2026Zo bc-expedited construction of a 1136 sq ft covered outdoor dinning patio addition to an existing 3766 sq ft restaurant.scope of work includes new structural street canopy, concrete foundations, roofing systems, framing architectural finishes, and all associated construction as shown on the approved plans.all work shall comply with the approved construction documents and applicable city of dallas codes
- 1151 S Edgefield Ave · Winnetka Elementary SchoolAug 13, 2026Water service replacement
- 2324 Beatrice StJul 30, 2026New service for parking lot
- 217 Melba StJun 25, 20262nd floor building
- 1805 Sylvan AveJun 17, 2026Installation of new electrical service and electrical vehicle supply equipment (evse) for a total of (4) electrical vehicle charging stalls in parking area, anticipated work as follows: - install (2) electric vehicle charging stations- install service electric al distribution equipment- install utility customer equipment for new electrical service- install concrete foundations and pads for support equipment -install screening if required by zoning requirements
- 1026 N Winnetka AveJun 3, 2026Rough in of sink
- 111 Melba StMay 1, 2026Complete demolition of existing single-family residence (wood frame, 1,618 sq ft) and all associated site improvements at 111 melba street, dallas, tx. all utilities to be disconnected and capped prior to demolition. all debris and foundations to be fully removed from site.demolition is required to clear the site for arthouse apartments, a 70-unit multifamily development with structured parking. engineering (dp23-316) and water/wastewater (ww 22-828) plans are stamped and approved. active permitting under record 2401021045_186953420-001.this permit is filed in conjunction with companion demolition permit com-dem-26-000051 (adjacent property, same owner, same project). no structures or improvements to remain upon completion
- 876 W 9th StMar 24, 2026Not a school project demolition of trinity basin prep school building only to grade. this will be a demolition to grade no site demolition will be completed under this permit. parking lot to remain
- 750 Fort Worth AveMar 5, 2026Mcr parking garage concrete/grading repairs-remove the slab area from the retaining wall to the first crack control line, which is approximately 16 feet from the wall.-recompact the subgrade as necessary. provide additional subgrade fill and recompact as needed.-provide #3 (3/8") smooth dowels @ 12" on center into the top of wall concrete and into the existing slab-on-grade. drill and epoxy the dowels using hilti hy200 epoxy (or equivalent). embed dowels 4" into the existing concrete. place dowels 3" from top of wall concrete and slab-on-grade.-pour back a 5" think slab-on-grade (compressive strength t-c=3000 psi minimum), reinforce with #3 bars @ 12" on center each way. thicken the slab to 10 inches deep by 12 inches wide along the retaining wall
- 1655 Vilbig RdDec 15, 2025Install (4) new level 3 chargers from a newlyinstalled 400a panel. each charger to get 4 bollards forprotection. parking spots inside the fence will berepositioned to better fit the new ev armored trucks
- 601 W 10th StNov 12, 2025Ew release for parking lot lights
- 209 N Clinton AveOct 21, 2025Nsfaa 1. replacing a current 2 car garage structure with a new 2 car ovesized garage 2. with a loft on the second floor
- 235 W Main StJun 4, 2025Qteam meeting site work only to construct a surface parking lot to be used for remote parking for harold simmons park located at 2601 n beckley
- 238 W 12th Street · Solpanelec 4 0 LLCAug 7, 2024Ionna charging hub 12th st. dallas — new construction — remove a portion of existing concrete and landscape area and install (4) ev dispensers, transformer, step down transformer, prefabricated c-store with vending machines, canopy, new parking area to include new curbing, paving, striping and stencil
Questions
What parking structures are being built in Dallas 75208?
18 addresses in 75208 have permits or project filings for parking structures in the last two years. The most recent was filed at 315 Sunset Ave. Others include 411 W Commerce St, 114 W 7th St, 663 W Davis St.
How can I find out when a new parking project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new parking project permit is filed.