1805 Sylvan Ave
Dallas, TX 75208
EV charging equipment planned at 1805 Sylvan Ave
City of Dallas permits indicate plans to install electric vehicle charging equipment in the parking area at 1805 Sylvan Ave, serving four charging stalls with two charging stations. The new construction permit was filed February 12, 2026, followed by electrical and alteration/addition permits on June 10 and June 17, 2026.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jun 17, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 17, 2026
- since Feb 12, 2026
- Largest scope
- —
- Estimated cost
- $150K
- state registration
Where this project stands
Completed7-Eleven - DBT - 38432
6,430 sq ft · $150K est.
- RegisteredAug 23, 2023
- Plan review
- ConstructionOct '23 – Nov '23
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
6 projectsInstallation of new electrical service and electrical vehicle supply equipment (evse) for a total of (4) electrical vehicle charging stalls in parking area, anticipated work as follows: - install (2) electric vehicle charging stations- install service electric al distribution equipment- install utility customer equipment for new electrical service- install concrete foundations and pads for support equipment -install screening if required by zoning requirements
Installation of new electrical service and electrical vehicle supply equipment (evse) for a total of (4) electrical vehicle charging stalls in parking area, anticipated work as follows: - install (2) electric vehicle charging stations- install service electric al distribution equipment- install utility customer equipment for new electrical service- install concrete foundations and pads for support equipment -install screening if required by zoning requirements
City of Dallas permitCommercial Electrical PermitInstallation of new electrical service and electric vehicle supplyequipment (evse) for a total of (4) electric vehicle charging stallsin parking area. anticipated work as follows:-install (2) electric vehicle charging stations.-install service electrical distribution equipment.-install utility customer equipment for new electrical service.-install concrete foundations and pads for support equipment.-install screening if required by zoning requirements
Installation of new electrical service and electric vehicle supplyequipment (evse) for a total of (4) electric vehicle charging stallsin parking area. anticipated work as follows:-install (2) electric vehicle charging stations.-install service electrical distribution equipment.-install utility customer equipment for new electrical service.-install concrete foundations and pads for support equipment.-install screening if required by zoning requirements
City of Dallas permitCommercial Alteration Addition PermitInstallation of new electrical service and electric vehicle supply equipment (evse) for a total of (4) electric vehicle charging stalls in parking areas. anticipated work as follows: -install (2) electric vehicle charging stations-install service electrical distribution equipment-install utility customer equipment for new electrical service-install concrete foundations and pads for support equipment-install screening if required by zoning requirements
Installation of new electrical service and electric vehicle supply equipment (evse) for a total of (4) electric vehicle charging stalls in parking areas. anticipated work as follows: -install (2) electric vehicle charging stations-install service electrical distribution equipment-install utility customer equipment for new electrical service-install concrete foundations and pads for support equipment-install screening if required by zoning requirements
City of Dallas permitCommercial Electrical PermitInstallation of new electrical service and electric vehicle supplyequipment (evse) for a total of (4) electric vehicle charging stallsin parking area. anticipated work as follows:-install (2) electric vehicle charging stations.-install service electrical distribution equipment.-install utility customer equipment for new electrical service.-install concrete foundations and pads for support equipment.-install screening if required by zoning requirements
Installation of new electrical service and electric vehicle supplyequipment (evse) for a total of (4) electric vehicle charging stallsin parking area. anticipated work as follows:-install (2) electric vehicle charging stations.-install service electrical distribution equipment.-install utility customer equipment for new electrical service.-install concrete foundations and pads for support equipment.-install screening if required by zoning requirements
City of Dallas permitCommercial New Construction PermitReplace existing equipment with new equipment reusing existing electric and plumbing. update cabinetry and hardware. do a 1:1 replacement of salsa bar in ltc. update fixtures including removing overhead signage and replace with wallpaper trim. — 7-eleven
TDLR project registrationRenovation/AlterationProject Closed6,430 sq ft$150K est.- Project #
- TABS2023026582
- Tenant / owner
- 7-Eleven - Dbt - 38432
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 1805 Sylvan Ave
What is being built at 1805 Sylvan Ave?
Dallas permits indicate plans for electric vehicle charging equipment in the parking area, with two charging stations serving four stalls. The new construction permit, COM-NEW-26-000030, was filed February 12, 2026.
How many EV charging stations are planned at 1805 Sylvan Ave?
The permit descriptions specify two electric vehicle charging stations and a total of four charging stalls. Electrical permits were filed June 10 and June 17, 2026.
When were permits filed for the EV chargers at 1805 Sylvan Ave?
The City of Dallas filed a new construction permit on February 12, 2026. Related electrical and alteration/addition permits followed on June 10 and June 17, 2026.
What permits were filed for 1805 Sylvan Ave?
Records include new construction permit COM-NEW-26-000030, electrical permits COM-ELC-26-002590 and COM-ELC-26-002746, and alteration/addition permit COM-ALT-ADD-26-000370. The permit descriptions concern electrical service and EV charging equipment.
Are EV chargers planned near Chase Trinity Relo on Sylvan Avenue?
Dallas permits indicate plans for EV charging equipment at 1805 Sylvan Ave, about 31 meters from Chase Trinity Relo at 1808 Sylvan Ave. The permits describe two charging stations for four stalls.
Also being built nearby
All of 75208- 1808 Sylvan Ave · Ch Retail Fund II/Dallas Sylvan Thirty, L.p.Apr 30, 2026New hvac 10 ton-12ton · 31 m away
- 1868 Sylvan AveJun 24, 2025Electrical addition to existing buildinng permit · 126 m away
- 1878 Sylvan AveDec 1, 2020Alcohol certification · 143 m away
- 750 Fort Worth AveMar 5, 2026Mcr parking garage concrete/grading repairs-remove the slab area from the retaining wall to the first crack control line, which is approximately 16 feet from the wall.-recompact the subgrade as necessary. provide additional subgrade fill and recompact as needed.-provide #3 (3/8") smooth dowels @ 12" on center into the top of wall concrete and into the existing slab-on-grade. drill and epoxy the dowels using hilti hy200 epoxy (or equivalent). embed dowels 4" into the existing concrete. place dowels 3" from top of wall concrete and slab-on-grade.-pour back a 5" think slab-on-grade (compressive strength t-c=3000 psi minimum), reinforce with #3 bars @ 12" on center each way. thicken the slab to 10 inches deep by 12 inches wide along the retaining wall · 155 m away
- 1888 Sylvan AveJul 27, 2026This request is for a clean and show in suite f140 · 159 m away
- 901 Fort Worth AveMar 3, 2026Install one new 3" rpz backflow preventer. replace one existing 1" rpz backflow preventer. no structural change · 168 m away
- 1000 Fort Worth AveNov 9, 2026We are requiring a electrical no work permit for suite #1216 · 173 m away
- 1007 Fort Worth AveMay 7, 2026Gas test on system water heater stove furnace house is vacant lockbox code 3800desmond 817-770-7700 · 219 m away
- 1618 Kessler PkwyOct 21, 2025197' x 8' cedar wood fence · 224 m away
- 710 Fort Worth AveFeb 12, 2026Conect coolers · 282 m away
- 1661 Sylvan AveNov 9, 2025Replace water heater · 286 m away
- 1902 Wickmere MewsJan 12, 2021Construct new sfd · 286 m away
More warehouses & industrial in 75208, parking structures in 75208.