209 N Clinton Ave
Dallas, TX 75208
New oversized two-car garage with second-floor loft
City of Dallas permit records indicate a new oversized two-car garage with a second-floor loft is replacing the previous garage at 209 N Clinton Ave. The records include a residential accessory structure permit filed August 1, 2025, and a residential alteration and addition permit filed October 21, 2025.
Summarized from City of Dallas records · updated Oct 21, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 21, 2025
- since Aug 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa 1. replacing a current 2 car garage structure with a new 2 car ovesized garage 2. with a loft on the second floor
Nsfaa 1. replacing a current 2 car garage structure with a new 2 car ovesized garage 2. with a loft on the second floor
City of Dallas permitResidential Alteration Addition PermitBuilding a 2 car garage with 2nd floor loft in the same place/spot/area as the previous 2 car garage. 1. removed previous garage2. removed previous concrete debris from previous 2 car garage3. building a new 2 car oversized garage with a 2nd floor loft
Building a 2 car garage with 2nd floor loft in the same place/spot/area as the previous 2 car garage. 1. removed previous garage2. removed previous concrete debris from previous 2 car garage3. building a new 2 car oversized garage with a 2nd floor loft
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 209 N Clinton Ave
What is being built at 209 N Clinton Ave?
City of Dallas permit records indicate a new oversized two-car garage with a second-floor loft is replacing the previous garage.
Is the garage replacing an existing structure?
Yes. The permit descriptions say the previous two-car garage was removed and a new garage is being built in the same area.
When was the garage project permitted?
City records show filings on August 1, 2025, and October 21, 2025.
What are the permit numbers for 209 N Clinton Ave?
The records list permit RES-ACC-25-000413, filed August 1, 2025, and permit RES-ALT-ADD-25-001101, filed October 21, 2025.
Will the new garage have a second floor?
Yes. The permit descriptions specify a loft on the second floor.
Also being built nearby
All of 75208- 210 N Clinton AveMar 25, 2026Minisplit installation · 13 m away
- 206 N Clinton AveOct 15, 2020Install roof mounted solar pv system; ca190-667(mlp) · 13 m away
- 303 N Clinton AveJan 5, 2026Install customer supplies water heater , does not include code upgrades or any additional parts needed for installationflood stop valve connects to water inlet. wired sensor is set in water heater pan. if water touches sensor it will trip valve to shut off water to heater and sound off alarm to alert homeowner. this device helps eliminate water damage.we will replace all cpvc and pvc in crawl space, walls, and attic. after all lines have been replaced we will check for leaks and insulate water lines. dial one is not responsible for sheetrock damages.job will be permitted and inspected · 81 m away
- 311 N Clinton AveMay 12, 2026Install new hvac · 88 m away
- 201 N Edgefield AveAug 21, 2026Replace exsiting u/s hvac sull system · 116 m away
- 205 N Winnetka AveJun 16, 2026Replace (1) 40 gal electric water heater · 116 m away
- 225 N Edgefield AveFeb 2, 2026Replacing 40 gallon gas water heater, prv, and expansion tank in addition to the water heater and prv...we will now be also installing 40 ft. of water yard line to permit! · 116 m away
- 127 N Clinton AveSep 15, 2026Replacing the hvac system like-for-like with a new lennox 5.0-ton gas horizontal split system (furnace, condenser, coil) and install new thermostat, condenser pad, electrical whip, disconnect, fuses, locking caps, auxiliary drain pan, float safety switches, and line insulation, tying into existing ductwork and refrigerant lines. no structural change · 117 m away
- 206 N Winnetka AveJul 7, 202650 gallon gas water heater · 129 m away
- 210 N Winnetka AveDec 7, 2020Exterior remodel to sfd & accessory structure · 129 m away
- 315 N Edgefield AveNov 18, 2026Re-roof of main structure · 148 m away
- 130 N Edgefield AveNov 17, 2026Complete 30lf beam replacement, complete 28lf beam replacement, and install 10 spread footings · 152 m away