201 N Edgefield Ave
Dallas, TX 75208
Permit filed to replace HVAC system at Dallas residence
A residential mechanical permit at 201 N Edgefield Ave lists replacement of an existing HVAC system. The City of Dallas permit, RES-MEC-26-004628, was filed on August 21, 2026.
Summarized from City of Dallas records · updated Aug 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 21, 2026
- since Aug 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 201 N Edgefield Ave
What is being done at 201 N Edgefield Ave?
A City of Dallas residential mechanical permit lists replacement of an existing HVAC system. The permit was filed on August 21, 2026.
Was a permit filed for HVAC work at 201 N Edgefield Ave?
Yes. City of Dallas permit RES-MEC-26-004628 covers replacement of an existing HVAC system and is dated August 21, 2026.
When was the HVAC permit filed at 201 N Edgefield Ave?
The City of Dallas filed residential mechanical permit RES-MEC-26-004628 on August 21, 2026.
Is a new building planned at 201 N Edgefield Ave?
The available permit record is for residential mechanical work, not new construction. It lists replacement of an existing HVAC system.
What does permit RES-MEC-26-004628 cover?
The City of Dallas record describes the work as replacing an existing HVAC system at 201 N Edgefield Ave. It is a residential mechanical permit dated August 21, 2026.
Also being built nearby
All of 75208- 225 N Edgefield AveFeb 2, 2026Replacing 40 gallon gas water heater, prv, and expansion tank in addition to the water heater and prv...we will now be also installing 40 ft. of water yard line to permit! · 21 m away
- 315 N Edgefield AveNov 18, 2026Re-roof of main structure · 101 m away
- 130 N Edgefield AveNov 17, 2026Complete 30lf beam replacement, complete 28lf beam replacement, and install 10 spread footings · 105 m away
- 127 N Edgefield AveAug 19, 202524’ wide by 5’ long approach in alley with 5’ radius. new build no existing concrete · 109 m away
- 124 N Edgefield AveFeb 4, 2026Replace water main from water meter to home and pressure reducing valve · 113 m away
- 211 N Windomere AveDec 11, 2025Replace roof · 115 m away
- 209 N Clinton AveOct 21, 2025Nsfaa 1. replacing a current 2 car garage structure with a new 2 car ovesized garage 2. with a loft on the second floor · 116 m away
- 221 N Windomere AveMay 16, 2025Replacing existing u/s full system · 116 m away
- 206 N Clinton AveOct 15, 2020Install roof mounted solar pv system; ca190-667(mlp) · 128 m away
- 210 N Clinton AveMar 25, 2026Minisplit installation · 129 m away
- 103 N Edgefield AveJul 7, 2026Bedroom and bathroom electrical remodel/ addition · 141 m away
- 303 N Windomere AveSep 4, 2026New install · 145 m away