206 N Clinton Ave
Dallas, TX 75208
206 N Clinton Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 206 N Clinton Ave, Dallas, TX 75208. The most recent, filed October 15, 2020, covers: “Install roof mounted solar pv system; ca190-667(mlp)”.
Compiled from City of Dallas records · updated Oct 15, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 15, 2020
- since Oct 15, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 206 N Clinton Ave
What is being built at 206 N Clinton Ave?
The latest filing (City of Dallas permit 2010021123, October 15, 2020) covers install roof mounted solar pv system; ca190-667(mlp).
How many permits and filings does 206 N Clinton Ave have?
1 filing across 1 project, from October 15, 2020 to October 15, 2020.
Is there other construction near 206 N Clinton Ave?
Yes. Nearby filings include 210 N Clinton Ave (minisplit installation, Mar 25, 2026); 209 N Clinton Ave (nsfaa 1. replacing a current 2 car garage structure with a new 2 car ovesized garage 2. with a loft on the second floor, Oct 21, 2025); 303 N Clinton Ave (install customer supplies water heater , does not include code upgrades or any additional parts needed for installationflood stop valve connects to water inlet. wired sensor is set in water heater pan. if water touches sensor it will trip valve to shut off water to heater and sound off alarm to alert homeowner. this device helps eliminate water damage.we will replace all cpvc and pvc in crawl space, walls, and attic. after all lines have been replaced we will check for leaks and insulate water lines. dial one is not responsible for sheetrock damages.job will be permitted and inspected, Jan 5, 2026).
How do I get alerts for new permits at 206 N Clinton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 210 N Clinton AveMar 25, 2026Minisplit installation · 3 m away
- 209 N Clinton AveOct 21, 2025Nsfaa 1. replacing a current 2 car garage structure with a new 2 car ovesized garage 2. with a loft on the second floor · 13 m away
- 303 N Clinton AveJan 5, 2026Install customer supplies water heater , does not include code upgrades or any additional parts needed for installationflood stop valve connects to water inlet. wired sensor is set in water heater pan. if water touches sensor it will trip valve to shut off water to heater and sound off alarm to alert homeowner. this device helps eliminate water damage.we will replace all cpvc and pvc in crawl space, walls, and attic. after all lines have been replaced we will check for leaks and insulate water lines. dial one is not responsible for sheetrock damages.job will be permitted and inspected · 84 m away
- 311 N Clinton AveMay 12, 2026Install new hvac · 90 m away
- 205 N Winnetka AveJun 16, 2026Replace (1) 40 gal electric water heater · 103 m away
- 206 N Winnetka AveJul 7, 202650 gallon gas water heater · 116 m away
- 210 N Winnetka AveDec 7, 2020Exterior remodel to sfd & accessory structure · 116 m away
- 127 N Clinton AveSep 15, 2026Replacing the hvac system like-for-like with a new lennox 5.0-ton gas horizontal split system (furnace, condenser, coil) and install new thermostat, condenser pad, electrical whip, disconnect, fuses, locking caps, auxiliary drain pan, float safety switches, and line insulation, tying into existing ductwork and refrigerant lines. no structural change · 116 m away
- 201 N Edgefield AveAug 21, 2026Replace exsiting u/s hvac sull system · 128 m away
- 225 N Edgefield AveFeb 2, 2026Replacing 40 gallon gas water heater, prv, and expansion tank in addition to the water heater and prv...we will now be also installing 40 ft. of water yard line to permit! · 129 m away
- 306 N Winnetka AveSep 29, 2026Construction crew hit line and we need to repair · 145 m away
- 127 N Winnetka AveJul 13, 2025Electric remodel of existing bedroom and kitchen · 154 m away
More solar installs in 75208.