127 N Edgefield Ave
Dallas, TX 75208
127 N Edgefield Ave: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 127 N Edgefield Ave, Dallas, TX 75208 since July 14, 2025. The most recent, filed August 19, 2025, covers: “24’ wide by 5’ long approach in alley with 5’ radius. new build no existing concrete”.
Compiled from City of Dallas records · updated Aug 19, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 19, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsConstruct 9' board on board cedar fence with sliding gate across back driveway, fence in rear and side yards
Construct 9' board on board cedar fence with sliding gate across back driveway, fence in rear and side yards
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 127 N Edgefield Ave
What is being built at 127 N Edgefield Ave?
The latest filing (City of Dallas permit RES-DSW-25-000326, August 19, 2025) covers 24’ wide by 5’ long approach in alley with 5’ radius. new build no existing concrete.
How many permits and filings does 127 N Edgefield Ave have?
3 filings across 3 projects, from July 14, 2025 to August 19, 2025.
Is there other construction near 127 N Edgefield Ave?
Yes. Nearby filings include 124 N Edgefield Ave (replace water main from water meter to home and pressure reducing valve, Feb 4, 2026); 130 N Edgefield Ave (complete 30lf beam replacement, complete 28lf beam replacement, and install 10 spread footings, Nov 17, 2026); 103 N Edgefield Ave (bedroom and bathroom electrical remodel/ addition, Jul 7, 2026).
How do I get alerts for new permits at 127 N Edgefield Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 124 N Edgefield AveFeb 4, 2026Replace water main from water meter to home and pressure reducing valve · 13 m away
- 130 N Edgefield AveNov 17, 2026Complete 30lf beam replacement, complete 28lf beam replacement, and install 10 spread footings · 14 m away
- 103 N Edgefield AveJul 7, 2026Bedroom and bathroom electrical remodel/ addition · 32 m away
- 106 S Edgefield AveMar 19, 2025Residential plumbing permit · 54 m away
- 108 S Edgefield AveJun 24, 2025Residential new construction permit · 56 m away
- 126 N Windomere AveAug 18, 2025The service utility meter needs to be swapped · 101 m away
- 122 N Windomere AveJul 27, 2026The bad weather knocked out their meter and riser so they have no power on the house · 102 m away
- 201 N Edgefield AveAug 21, 2026Replace exsiting u/s hvac sull system · 109 m away
- 127 N Clinton AveSep 15, 2026Replacing the hvac system like-for-like with a new lennox 5.0-ton gas horizontal split system (furnace, condenser, coil) and install new thermostat, condenser pad, electrical whip, disconnect, fuses, locking caps, auxiliary drain pan, float safety switches, and line insulation, tying into existing ductwork and refrigerant lines. no structural change · 116 m away
- 111 N Windomere AveDec 9, 2025Replace 71ft of sewer from front of home to city lateral · 117 m away
- 1509 W 10th StAug 5, 2025Installed one 50 gallon gas water heater in hallway closet · 129 m away
- 225 N Edgefield AveFeb 2, 2026Replacing 40 gallon gas water heater, prv, and expansion tank in addition to the water heater and prv...we will now be also installing 40 ft. of water yard line to permit! · 130 m away