106 S Edgefield Ave
Dallas, TX 75208
106 S Edgefield Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 106 S Edgefield Ave, Dallas, TX 75208. The most recent, filed March 19, 2025, covers: “residential construction”.
Compiled from City of Dallas records · updated Mar 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 19, 2025
- since Mar 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 106 S Edgefield Ave
What is being built at 106 S Edgefield Ave?
The latest filing (City of Dallas permit 2503191004_198888358-002_PL_1, March 19, 2025) covers residential construction.
How many permits and filings does 106 S Edgefield Ave have?
1 filing across 1 project, from March 19, 2025 to March 19, 2025.
Is there other construction near 106 S Edgefield Ave?
Yes. Nearby filings include 108 S Edgefield Ave (residential new construction permit, Jun 24, 2025); 103 N Edgefield Ave (bedroom and bathroom electrical remodel/ addition, Jul 7, 2026); 124 N Edgefield Ave (replace water main from water meter to home and pressure reducing valve, Feb 4, 2026).
How do I get alerts for new permits at 106 S Edgefield Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 108 S Edgefield AveJun 24, 2025Residential new construction permit · 2 m away
- 103 N Edgefield AveJul 7, 2026Bedroom and bathroom electrical remodel/ addition · 24 m away
- 124 N Edgefield AveFeb 4, 2026Replace water main from water meter to home and pressure reducing valve · 50 m away
- 127 N Edgefield AveAug 19, 202524’ wide by 5’ long approach in alley with 5’ radius. new build no existing concrete · 54 m away
- 130 N Edgefield AveNov 17, 2026Complete 30lf beam replacement, complete 28lf beam replacement, and install 10 spread footings · 58 m away
- 206 S Edgefield AveFeb 16, 2026Remove & replace complete roof system · 110 m away
- 209 S Edgefield AveNov 28, 2025Gas test · 113 m away
- 106 S Clinton AveJul 15, 2025Replacement of water service with prv · 116 m away
- 127 N Clinton AveSep 15, 2026Replacing the hvac system like-for-like with a new lennox 5.0-ton gas horizontal split system (furnace, condenser, coil) and install new thermostat, condenser pad, electrical whip, disconnect, fuses, locking caps, auxiliary drain pan, float safety switches, and line insulation, tying into existing ductwork and refrigerant lines. no structural change · 116 m away
- 116 S Clinton AveJul 9, 2026Will be replacing the asphalt roof shingles on the back side of the house, approximately 1/5 of the entire roof. i will be replacing the old shingles with those that match the other 4/5 of the house · 117 m away
- 126 S Clinton AveSep 17, 2026Electrical remodel · 119 m away
- 128 S Clinton AveJun 26, 2025Replace existing city sidewalk · 120 m away