116 S Clinton Ave
Dallas, TX 75208
Permit filed to replace part of home's roof
A residential roofing permit indicates asphalt shingles will be replaced on the back side of the house at 116 S Clinton Ave. The permit was filed July 9, 2026, and describes work on about one-fifth of the roof, using shingles to match the rest.
Summarized from City of Dallas records · updated Jul 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 9, 2026
- since Jul 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectWill be replacing the asphalt roof shingles on the back side of the house, approximately 1/5 of the entire roof. i will be replacing the old shingles with those that match the other 4/5 of the house
Will be replacing the asphalt roof shingles on the back side of the house, approximately 1/5 of the entire roof. i will be replacing the old shingles with those that match the other 4/5 of the house
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 116 S Clinton Ave
What work is planned at 116 S Clinton Ave?
A City of Dallas permit describes replacing asphalt roof shingles on the back side of the house. The work covers about one-fifth of the roof.
When was the roof permit filed for 116 S Clinton Ave?
The permit was filed July 9, 2026. Its number is RES-ROOF-26-001118.
What part of the roof is being replaced at 116 S Clinton Ave?
The permit describes replacing shingles on the back side of the house, approximately one-fifth of the roof.
Will the new shingles match the rest of the roof?
The permit description says the replacement shingles will match the shingles on the other four-fifths of the roof.
Is a new house being built at 116 S Clinton Ave?
The record describes roof-shingle replacement on a house, not construction of a new home.
Also being built nearby
All of 75208- 106 S Clinton AveJul 15, 2025Replacement of water service with prv · 13 m away
- 126 S Clinton AveSep 17, 2026Electrical remodel · 13 m away
- 128 S Clinton AveJun 26, 2025Replace existing city sidewalk · 15 m away
- 127 N Clinton AveSep 15, 2026Replacing the hvac system like-for-like with a new lennox 5.0-ton gas horizontal split system (furnace, condenser, coil) and install new thermostat, condenser pad, electrical whip, disconnect, fuses, locking caps, auxiliary drain pan, float safety switches, and line insulation, tying into existing ductwork and refrigerant lines. no structural change · 69 m away
- 1315 W Jefferson BlvdNov 25, 2020General repair, no structural changes · 99 m away
- 123 S Winnetka AveJun 1, 2026New furnace, evaporator coil, and condensing unit for second floor · 102 m away
- 101 S Winnetka AveSep 16, 2026Upgrade panel box · 104 m away
- 120 S Winnetka AveDec 17, 2020Build swimming pool and spa · 115 m away
- 112 S Winnetka AveJul 11, 2025Perform a gas pressure test · 115 m away
- 108 S Edgefield AveJun 24, 2025Residential new construction permit · 117 m away
- 106 S Edgefield AveMar 19, 2025Residential plumbing permit · 117 m away
- 121 N Winnetka AveMar 10, 2026Install a new air conditioning and heating system with ductwork · 119 m away