128 S Clinton Ave
Dallas, TX 75208
128 S Clinton Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 128 S Clinton Ave, Dallas, TX 75208. The most recent, filed June 26, 2025, covers: “Replace existing city sidewalk”.
Compiled from City of Dallas records · updated Jun 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 26, 2025
- since Jun 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 128 S Clinton Ave
What is being built at 128 S Clinton Ave?
The latest filing (City of Dallas permit RES-DSW-25-000209, June 26, 2025) covers replace existing city sidewalk.
How many permits and filings does 128 S Clinton Ave have?
1 filing across 1 project, from June 26, 2025 to June 26, 2025.
Is there other construction near 128 S Clinton Ave?
Yes. Nearby filings include 126 S Clinton Ave (electrical remodel, Sep 17, 2026); 116 S Clinton Ave (will be replacing the asphalt roof shingles on the back side of the house, approximately 1/5 of the entire roof. i will be replacing the old shingles with those that match the other 4/5 of the house, Jul 9, 2026); 106 S Clinton Ave (replacement of water service with prv, Jul 15, 2025).
How do I get alerts for new permits at 128 S Clinton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 126 S Clinton AveSep 17, 2026Electrical remodel · 3 m away
- 116 S Clinton AveJul 9, 2026Will be replacing the asphalt roof shingles on the back side of the house, approximately 1/5 of the entire roof. i will be replacing the old shingles with those that match the other 4/5 of the house · 15 m away
- 106 S Clinton AveJul 15, 2025Replacement of water service with prv · 28 m away
- 127 N Clinton AveSep 15, 2026Replacing the hvac system like-for-like with a new lennox 5.0-ton gas horizontal split system (furnace, condenser, coil) and install new thermostat, condenser pad, electrical whip, disconnect, fuses, locking caps, auxiliary drain pan, float safety switches, and line insulation, tying into existing ductwork and refrigerant lines. no structural change · 84 m away
- 1315 W Jefferson BlvdNov 25, 2020General repair, no structural changes · 84 m away
- 123 S Winnetka AveJun 1, 2026New furnace, evaporator coil, and condensing unit for second floor · 103 m away
- 101 S Winnetka AveSep 16, 2026Upgrade panel box · 108 m away
- 201 S Winnetka AveJul 23, 2025Roof replacement · 112 m away
- 211 S Winnetka AveMar 27, 2026Complete system · 116 m away
- 120 S Winnetka AveDec 17, 2020Build swimming pool and spa · 116 m away
- 112 S Winnetka AveJul 11, 2025Perform a gas pressure test · 117 m away
- 108 S Edgefield AveJun 24, 2025Residential new construction permit · 120 m away