Dallas home gets water-main and furnace replacement permits
City of Dallas permits indicate work at this residence includes replacing the water main from the meter to the home and installing a pressure-reducing valve. That plumbing permit was filed February 4, 2026; a furnace replacement permit was filed November 28, 2025.
Summarized from City of Dallas records · updated Feb 4, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Feb 4, 2026
- since Nov 28, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 124 N Edgefield Ave
What work is permitted at 124 N Edgefield Ave in Dallas?
City records list permits to replace the home's water main and pressure-reducing valve, and to replace its furnace.
Was a new home permitted at 124 N Edgefield Ave?
The records provided list plumbing and mechanical work, not a new-home construction permit.
When was the water-main permit filed for 124 N Edgefield Ave?
The City of Dallas filed permit RES-PLM-26-001303 on February 4, 2026, for a water-main replacement from the meter to the home and a pressure-reducing valve.
When was the furnace replacement permitted at 124 N Edgefield Ave?
The City of Dallas filed residential mechanical permit RES-MEC-25-003782 on November 28, 2025, for furnace replacement.
Are there other HVAC permits for 124 N Edgefield Ave?
Two City of Dallas records from February 2020 describe new HVAC installations. They list reported values of $6,498 each.
Also being built nearby
All of 75208- 130 N Edgefield AveNov 17, 2026Complete 30lf beam replacement, complete 28lf beam replacement, and install 10 spread footings · 8 m away
- 127 N Edgefield AveAug 19, 202524’ wide by 5’ long approach in alley with 5’ radius. new build no existing concrete · 13 m away
- 103 N Edgefield AveJul 7, 2026Bedroom and bathroom electrical remodel/ addition · 32 m away
- 106 S Edgefield AveMar 19, 2025Residential plumbing permit · 50 m away
- 108 S Edgefield AveJun 24, 2025Residential new construction permit · 51 m away
- 127 N Clinton AveSep 15, 2026Replacing the hvac system like-for-like with a new lennox 5.0-ton gas horizontal split system (furnace, condenser, coil) and install new thermostat, condenser pad, electrical whip, disconnect, fuses, locking caps, auxiliary drain pan, float safety switches, and line insulation, tying into existing ductwork and refrigerant lines. no structural change · 103 m away
- 201 N Edgefield AveAug 21, 2026Replace exsiting u/s hvac sull system · 113 m away
- 126 N Windomere AveAug 18, 2025The service utility meter needs to be swapped · 114 m away
- 122 N Windomere AveJul 27, 2026The bad weather knocked out their meter and riser so they have no power on the house · 114 m away
- 106 S Clinton AveJul 15, 2025Replacement of water service with prv · 127 m away
- 111 N Windomere AveDec 9, 2025Replace 71ft of sewer from front of home to city lateral · 129 m away
- 116 S Clinton AveJul 9, 2026Will be replacing the asphalt roof shingles on the back side of the house, approximately 1/5 of the entire roof. i will be replacing the old shingles with those that match the other 4/5 of the house · 133 m away