Second-floor office remodel at 12500 TI Blvd
A second-floor office area is being remodeled at this multi-tenant commercial site, according to a Dallas permit filed October 21, 2026. The work includes two new drywall offices, a conference room and updates to lighting, mechanical systems, electrical service, sprinklers and the fire alarm.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 21, 2026
- Projects
- 23
- 23 filings
- Latest filing
- Oct 21, 2026
- since Sep 17, 2020
- Largest scope
- 2,751 sf
- Estimated cost
- $604K
- state registration
Permit & project history
23 projectsBu zo remodel existing 2nd floor office area by adding two new drywall offices with storefront entry and paint. add new lighting for two offices, rework mechanical, electrical, sprinklers, fire alarm to accommodate new office. install new modular high for new conference room
Bu zo remodel existing 2nd floor office area by adding two new drywall offices with storefront entry and paint. add new lighting for two offices, rework mechanical, electrical, sprinklers, fire alarm to accommodate new office. install new modular high for new conference room
City of Dallas permitCommercial Alteration Addition PermitZo bc address for job 13292 n central expy, dallas, tx, 75243address written 12500 ti blvdreason: address for drs cleanroom proj. not available to be seen on dcad.interior remodel of existing commercial space and exterior revisions to add one overhead door, one man door, and improvements to the mechanical yard
Zo bc address for job 13292 n central expy, dallas, tx, 75243address written 12500 ti blvdreason: address for drs cleanroom proj. not available to be seen on dcad.interior remodel of existing commercial space and exterior revisions to add one overhead door, one man door, and improvements to the mechanical yard
City of Dallas permitCommercial Alteration Addition PermitProposed fencing improvements include modification and repair of approximately 3,600 linear feet of existing wrought iron fence (existing height: 6’-6”), including removal of ornamental picket tops flush with the top rail, installation of a shark tooth security topper, and in-kind replacement of deteriorated or rusted fence panels and components. no change to fence height or location is proposed.work also includes replacement of an existing fence segment on the west side of the site with a new 8’-0” tall clearvu-style welded steel mesh fence system, installed in the same location as the fence to be removed.additionally, a new 8’-0” tall internal clearvu-style fence is proposed on the east side of the site, installed parallel to and approximately 8 feet west of the existing east fence line.four (4) manual, non-motorized, single-leaf swing gates (8’-0” height x 6’-0” width) are proposed for landscape maintenance access, including three (3) along the internal east fence and one (1) along the west replacement fence. gates shall consist of a steel frame with clearvu-style welded steel mesh infill, including anti-climb configuration and integrated locking hardware
Proposed fencing improvements include modification and repair of approximately 3,600 linear feet of existing wrought iron fence (existing height: 6’-6”), including removal of ornamental picket tops flush with the top rail, installation of a shark tooth security topper, and in-kind replacement of deteriorated or rusted fence panels and components. no change to fence height or location is proposed.work also includes replacement of an existing fence segment on the west side of the site with a new 8’-0” tall clearvu-style welded steel mesh fence system, installed in the same location as the fence to be removed.additionally, a new 8’-0” tall internal clearvu-style fence is proposed on the east side of the site, installed parallel to and approximately 8 feet west of the existing east fence line.four (4) manual, non-motorized, single-leaf swing gates (8’-0” height x 6’-0” width) are proposed for landscape maintenance access, including three (3) along the internal east fence and one (1) along the west replacement fence. gates shall consist of a steel frame with clearvu-style welded steel mesh infill, including anti-climb configuration and integrated locking hardware
City of Dallas permitCommercial Accessory Structure PermitMcr area 1:architectural:and demolition existing sheetrock wall to relocate team roomdoor - b1011.• construct new north & south wall to enclose new svp suite. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront doors.• construct new sheetrock wing walls at break / copy area. fabricate and install new cabinet at the break / copy area.• construct new sheetrock wall to enclose north wall of team room b1011 and install new door and storefront at east wall.• construct new north and west walls to enclose new svp office. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront door.• clean, patch, and float existing floor as necessary after carpet removal to accommodate new walls.• patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:• rework existing hvac distribution, and add vav unit to accommodate the new layoutelectrical:• relocate overhead lighting as necessary to accomodate the new layout.• add and/or relocate power to accommodate the new layout.plumbing:• new water line to serve the coffee machine at the break / copy ounter.area 2:architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, & b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout
Mcr area 1:architectural:and demolition existing sheetrock wall to relocate team roomdoor - b1011.• construct new north & south wall to enclose new svp suite. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront doors.• construct new sheetrock wing walls at break / copy area. fabricate and install new cabinet at the break / copy area.• construct new sheetrock wall to enclose north wall of team room b1011 and install new door and storefront at east wall.• construct new north and west walls to enclose new svp office. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront door.• clean, patch, and float existing floor as necessary after carpet removal to accommodate new walls.• patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:• rework existing hvac distribution, and add vav unit to accommodate the new layoutelectrical:• relocate overhead lighting as necessary to accomodate the new layout.• add and/or relocate power to accommodate the new layout.plumbing:• new water line to serve the coffee machine at the break / copy ounter.area 2:architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, & b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout
City of Dallas permitCommercial Alteration Addition PermitArea 1-architectural:· remove door and demolition existing sheetrock wall to relocate team roomdoor - b1011.· construct new north & south wall to enclose new svp suite. new walls tobe sheetrock and storefront to a height of 11' aff as shown. install newstorefront doors.· construct new sheetrock wing walls at break / copy area. fabricate andinstall new cabinet at the break / copy area.· construct new sheetrock wall to enclose north wall of team room b1011and install new door and storefront at east wall.· construct new north and west walls to enclose new svp office. newwalls to be sheetrock and storefront to a height of 11' aff as shown.install new storefront door.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls.· patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:· rework existing hvac distribution, and add vav unit to accommodate thenew layoutelectrical:· relocate overhead lighting as necessary to accomodate the new layout.· add and/or relocate power to accommodate the new layout.plumbing:· install new water line to serve the coffee machine at the break / copycounter.area 2 - architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, &b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout
Area 1-architectural:· remove door and demolition existing sheetrock wall to relocate team roomdoor - b1011.· construct new north & south wall to enclose new svp suite. new walls tobe sheetrock and storefront to a height of 11' aff as shown. install newstorefront doors.· construct new sheetrock wing walls at break / copy area. fabricate andinstall new cabinet at the break / copy area.· construct new sheetrock wall to enclose north wall of team room b1011and install new door and storefront at east wall.· construct new north and west walls to enclose new svp office. newwalls to be sheetrock and storefront to a height of 11' aff as shown.install new storefront door.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls.· patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:· rework existing hvac distribution, and add vav unit to accommodate thenew layoutelectrical:· relocate overhead lighting as necessary to accomodate the new layout.· add and/or relocate power to accommodate the new layout.plumbing:· install new water line to serve the coffee machine at the break / copycounter.area 2 - architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, &b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout
City of Dallas permitCommercial New Construction PermitArea 1: 1,700 sq ft, enclose area, add 1 office & 2 work stations, and break counter. area 2, ~255 sq ft, rotate entrance to existing office, convert copy room to 2 enclosed offices. — texas instruments, inc. wing b
TDLR project registrationRenovation/AlterationProject Closed1,955 sq ft$282K est.- Project #
- TABS2026009532
- Tenant / owner
- S. Campus Wing B Remodel Project
- Design firm
- Pro
- Contact
- Pro
Certificate of occupancy required prior to occupancymcr interior remodel to create an enclosed electronics laboratory space for the purpose of testing and modifying electronic components (this is not a medical facility). will construct two sheetrock walls that do reach to the ceiling, make minor modifications to selected flooring areas and install a new door. electrical work will entail relocation of subpanels and distribution of electrical service to new bench locations. mechanical work will consist of rerouting existing cda to the new bench locations
Certificate of occupancy required prior to occupancymcr interior remodel to create an enclosed electronics laboratory space for the purpose of testing and modifying electronic components (this is not a medical facility). will construct two sheetrock walls that do reach to the ceiling, make minor modifications to selected flooring areas and install a new door. electrical work will entail relocation of subpanels and distribution of electrical service to new bench locations. mechanical work will consist of rerouting existing cda to the new bench locations
City of Dallas permitCommercial Alteration Addition PermitAdd 900 sq ft room, walls only 9ft tall with light system on top of wall. turn existing panels around so they are inside new room. relocate tech benches, add soldering area. ncludes sheetrcok, electriacl adn cda, new badge reader. — texas instruments, inc. wing j2
TDLR project registrationRenovation/AlterationProject Closed900 sq ft$162K est.- Project #
- TABS2026006134
- Tenant / owner
- S. Campus J2s Itar Project
- Design firm
- Pro
- Contact
- Pro
Mechanical (process) system:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others
Mechanical (process) system:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others
City of Dallas permitCommercial Mechanical PermitElectrical system:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.additional scope of work:1) tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.2) install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.3) all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel
Electrical system:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.additional scope of work:1) tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.2) install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.3) all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel
City of Dallas permitCommercial Electrical PermitMcr electrical scope of work:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.16. tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.17. install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.18. all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel.mechanical scope of work:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others
Mcr electrical scope of work:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.16. tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.17. install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.18. all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel.mechanical scope of work:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others
City of Dallas permitCommercial Alteration Addition PermitRemodel 2,100 sq ft lab space, add sheet rock headers, electrical panel/epo buttons, modify existing storefront, electrical, cda, fire protection. add/relocate tech benches, remove/rework modular storage rooms. — texas instruments, south campus, wing k2
TDLR project registrationRenovation/AlterationProject Closed2,100 sq ft$604K est.- Project #
- TABS2026000421
- Tenant / owner
- K2 High Voltage Lab Expansion
- Design firm
- Pro
- Contact
- Pro
Renovate 2700 sq ft to add 6 offices, break area, new led lights, and hvac modifications
Renovate 2700 sq ft to add 6 offices, break area, new led lights, and hvac modifications
City of Dallas permitCommercial Mechanical Permit$232KAdd 6 private offices, a break/copy area, extend walls to deck, add insulation replace 3 doors. 2,751 sq ft — texas instruments, cup 1st floor
TDLR project registrationRenovation/AlterationProject Closed2,751 sq ft$265K est.- Project #
- TABS2025014102
- Tenant / owner
- Texas Instruments Cup1 Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 12500 Ti Blvd
What is being built at 12500 TI Blvd in Dallas?
A Dallas permit filed October 21, 2026, describes a remodel of an existing second-floor office area, including two new offices and a conference room. The address is a multi-tenant commercial site.
What is the latest permit for 12500 TI Blvd?
The latest listed permit is COM-ALT-ADD-26-002586, filed October 21, 2026. It covers a second-floor office remodel.
Is 12500 TI Blvd a new building?
The latest permit describes remodeling an existing second-floor office area, not building a new structure. Other records at the multi-tenant site also describe interior renovations.
What work is planned for Texas Instruments Wing B?
A TDLR registration filed January 8, 2026, describes enclosing space for an office, two workstations and a break counter, plus converting a copy room into two offices. The registration lists 1,955 square feet and an estimated project cost of $282,000.
Is an electronics lab being built at 12500 TI Blvd?
A Dallas permit filed December 29, 2025, describes an interior remodel to create an enclosed electronics laboratory for testing and modifying electronic components. The description says the work is not for a medical facility.
How much will the 12500 TI Blvd project cost?
The TDLR registration for the Wing B remodel lists an applicant-estimated project cost of $282,000. This estimate applies to that registered project; it is not a total cost for all work at the address.
Also being built nearby
All of 75243- 8893 Forest LnAug 17, 2026Install electrical pedestal for traffic signals · 219 m away
- 8817 Forest Green DrJun 2, 2025Replace complete system · 279 m away
- 8722 Forest Green DrOct 30, 2025Sewer repair · 280 m away
- 8716 Forest Green DrJul 30, 2026Single hvac system change out · 282 m away
- 8837 Forest Green DrMay 19, 2025Install 18 total pilings · 288 m away
- 8629 Forest Green DrSep 12, 2025Replace 40gal gas wh in hall closet and saw cut patio, tunnel under home 4 ft to rebuild manifold and trench to expose incoming line · 311 m away
- 8630 Forest Green DrAug 19, 2025Electrical work associated with solar + storage installation under permit res-solar-25-000074 · 321 m away
- 8618 Forest Green DrApr 10, 2026Remove existing hvac system and install new hvac system · 329 m away
- 8600 Skyline DrNov 4, 2026Floor 4 · 378 m away
- 8600 Skyline Drive · Presbyterian Village North - Corrigan BuildingMar 5, 2026Pvn - marketing center - corrigan 2nd floor — renovation/alteration — renovation of existing meeting rooms into a marketing center with, conference rooms, reception/lounge area, and private offices. public restrooms will receive new finishes and lavatory fixtures · 378 m away
- 8600 Skyline · Landings Cafe Renovation And ExpansionJun 23, 2026Pvn phase iii - landings cafe — additions to existing building — renovation of the existing landings cafe and an expansion of the cafe. there will be a new bar in the expansion · 378 m away
- 8989 Forest LnSep 15, 2026Mcr just paint, front drywall & add two doors · 389 m away
More demolitions in 75243, warehouses & industrial in 75243, medical facilities in 75243.