12500 Ti Blvd

Dallas, TX 75243 · S. Campus Wing B Remodel Project, S. Campus J2s Itar Project + 2 more

Second-floor office remodel at 12500 TI Blvd

A second-floor office area is being remodeled at this multi-tenant commercial site, according to a Dallas permit filed October 21, 2026. The work includes two new drywall offices, a conference room and updates to lighting, mechanical systems, electrical service, sprinklers and the fire alarm.

Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 21, 2026

Projects
23
23 filings
Latest filing
Oct 21, 2026
since Sep 17, 2020
Largest scope
2,751 sf
Estimated cost
$604K
state registration

Permit & project history

23 projects
  1. Bu zo remodel existing 2nd floor office area by adding two new drywall offices with storefront entry and paint. add new lighting for two offices, rework mechanical, electrical, sprinklers, fire alarm to accommodate new office. install new modular high for new conference room

    Bu zo remodel existing 2nd floor office area by adding two new drywall offices with storefront entry and paint. add new lighting for two offices, rework mechanical, electrical, sprinklers, fire alarm to accommodate new office. install new modular high for new conference room

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002586
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Zo bc address for job 13292 n central expy, dallas, tx, 75243address written 12500 ti blvdreason: address for drs cleanroom proj. not available to be seen on dcad.interior remodel of existing commercial space and exterior revisions to add one overhead door, one man door, and improvements to the mechanical yard

    Zo bc address for job 13292 n central expy, dallas, tx, 75243address written 12500 ti blvdreason: address for drs cleanroom proj. not available to be seen on dcad.interior remodel of existing commercial space and exterior revisions to add one overhead door, one man door, and improvements to the mechanical yard

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000865
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Proposed fencing improvements include modification and repair of approximately 3,600 linear feet of existing wrought iron fence (existing height: 6’-6”), including removal of ornamental picket tops flush with the top rail, installation of a shark tooth security topper, and in-kind replacement of deteriorated or rusted fence panels and components. no change to fence height or location is proposed.work also includes replacement of an existing fence segment on the west side of the site with a new 8’-0” tall clearvu-style welded steel mesh fence system, installed in the same location as the fence to be removed.additionally, a new 8’-0” tall internal clearvu-style fence is proposed on the east side of the site, installed parallel to and approximately 8 feet west of the existing east fence line.four (4) manual, non-motorized, single-leaf swing gates (8’-0” height x 6’-0” width) are proposed for landscape maintenance access, including three (3) along the internal east fence and one (1) along the west replacement fence. gates shall consist of a steel frame with clearvu-style welded steel mesh infill, including anti-climb configuration and integrated locking hardware

    Proposed fencing improvements include modification and repair of approximately 3,600 linear feet of existing wrought iron fence (existing height: 6’-6”), including removal of ornamental picket tops flush with the top rail, installation of a shark tooth security topper, and in-kind replacement of deteriorated or rusted fence panels and components. no change to fence height or location is proposed.work also includes replacement of an existing fence segment on the west side of the site with a new 8’-0” tall clearvu-style welded steel mesh fence system, installed in the same location as the fence to be removed.additionally, a new 8’-0” tall internal clearvu-style fence is proposed on the east side of the site, installed parallel to and approximately 8 feet west of the existing east fence line.four (4) manual, non-motorized, single-leaf swing gates (8’-0” height x 6’-0” width) are proposed for landscape maintenance access, including three (3) along the internal east fence and one (1) along the west replacement fence. gates shall consist of a steel frame with clearvu-style welded steel mesh infill, including anti-climb configuration and integrated locking hardware

    City of Dallas permitCommercial Accessory Structure Permit
    Record
    COM-ACC-26-000063
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Installing 10 feet of 1/2" pipe

    Installing 10 feet of 1/2" pipe

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-000647
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Installing cda

    Installing cda

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000361
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Demolition plugsadd plugs relocate 2 lights

    Demolition plugsadd plugs relocate 2 lights

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000704
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Installing 2 – vav’s

    Installing 2 – vav’s

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000362
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Mcr area 1:architectural:and demolition existing sheetrock wall to relocate team roomdoor - b1011.• construct new north & south wall to enclose new svp suite. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront doors.• construct new sheetrock wing walls at break / copy area. fabricate and install new cabinet at the break / copy area.• construct new sheetrock wall to enclose north wall of team room b1011 and install new door and storefront at east wall.• construct new north and west walls to enclose new svp office. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront door.• clean, patch, and float existing floor as necessary after carpet removal to accommodate new walls.• patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:• rework existing hvac distribution, and add vav unit to accommodate the new layoutelectrical:• relocate overhead lighting as necessary to accomodate the new layout.• add and/or relocate power to accommodate the new layout.plumbing:• new water line to serve the coffee machine at the break / copy ounter.area 2:architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, & b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout

    Mcr area 1:architectural:and demolition existing sheetrock wall to relocate team roomdoor - b1011.• construct new north & south wall to enclose new svp suite. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront doors.• construct new sheetrock wing walls at break / copy area. fabricate and install new cabinet at the break / copy area.• construct new sheetrock wall to enclose north wall of team room b1011 and install new door and storefront at east wall.• construct new north and west walls to enclose new svp office. new walls to be sheetrock and storefront to a height of 11' aff as shown. install new storefront door.• clean, patch, and float existing floor as necessary after carpet removal to accommodate new walls.• patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:• rework existing hvac distribution, and add vav unit to accommodate the new layoutelectrical:• relocate overhead lighting as necessary to accomodate the new layout.• add and/or relocate power to accommodate the new layout.plumbing:• new water line to serve the coffee machine at the break / copy ounter.area 2:architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, & b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000232
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Area 1-architectural:· remove door and demolition existing sheetrock wall to relocate team roomdoor - b1011.· construct new north & south wall to enclose new svp suite. new walls tobe sheetrock and storefront to a height of 11' aff as shown. install newstorefront doors.· construct new sheetrock wing walls at break / copy area. fabricate andinstall new cabinet at the break / copy area.· construct new sheetrock wall to enclose north wall of team room b1011and install new door and storefront at east wall.· construct new north and west walls to enclose new svp office. newwalls to be sheetrock and storefront to a height of 11' aff as shown.install new storefront door.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls.· patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:· rework existing hvac distribution, and add vav unit to accommodate thenew layoutelectrical:· relocate overhead lighting as necessary to accomodate the new layout.· add and/or relocate power to accommodate the new layout.plumbing:· install new water line to serve the coffee machine at the break / copycounter.area 2 - architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, &b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout

    Area 1-architectural:· remove door and demolition existing sheetrock wall to relocate team roomdoor - b1011.· construct new north & south wall to enclose new svp suite. new walls tobe sheetrock and storefront to a height of 11' aff as shown. install newstorefront doors.· construct new sheetrock wing walls at break / copy area. fabricate andinstall new cabinet at the break / copy area.· construct new sheetrock wall to enclose north wall of team room b1011and install new door and storefront at east wall.· construct new north and west walls to enclose new svp office. newwalls to be sheetrock and storefront to a height of 11' aff as shown.install new storefront door.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls.· patch and repair suspended ceiling grid and tiles as necessary toaccomplish the scope of work.mechanical:· rework existing hvac distribution, and add vav unit to accommodate thenew layoutelectrical:· relocate overhead lighting as necessary to accomodate the new layout.· add and/or relocate power to accommodate the new layout.plumbing:· install new water line to serve the coffee machine at the break / copycounter.area 2 - architectural:· demolition east wall at copy-b1114, east wall at office b1115, and south wall atoffice b115. demolition cabinet and ceiling at existing copy room.· construct new sheetrock wall to create two new offices - b1113 & b1114.· construct new sheetrock wall at south wall of office - b1115.· construct new storefront wall at east wall of new offices - b1113, b1114, &b1115. each office to receive new door in east wall.· clean, patch, and float existing floor as necessary after carpet removalto accommodate new walls as shown.· install new suspended acoustical ceiling & grid in new enclosed offices.mechanical:· rework existing hvac distribution and install a vav unit for new office.electrical:· relocate overhead lighting in new enclcosed offices.· add and/or relocate power to accommodate the new layout

    City of Dallas permitCommercial New Construction Permit
    Record
    COM-NEW-26-000022
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Remodel of an existing space with panel moves

    Remodel of an existing space with panel moves

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000380
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Area 1: 1,700 sq ft, enclose area, add 1 office & 2 work stations, and break counter. area 2, ~255 sq ft, rotate entrance to existing office, convert copy room to 2 enclosed offices. — texas instruments, inc. wing b

    TDLR project registrationRenovation/AlterationProject Closed1,955 sq ft$282K est.
    Tenant / owner
    S. Campus Wing B Remodel Project
    Design firm
    Pro
    Contact
    Pro
  12. Certificate of occupancy required prior to occupancymcr interior remodel to create an enclosed electronics laboratory space for the purpose of testing and modifying electronic components (this is not a medical facility). will construct two sheetrock walls that do reach to the ceiling, make minor modifications to selected flooring areas and install a new door. electrical work will entail relocation of subpanels and distribution of electrical service to new bench locations. mechanical work will consist of rerouting existing cda to the new bench locations

    Certificate of occupancy required prior to occupancymcr interior remodel to create an enclosed electronics laboratory space for the purpose of testing and modifying electronic components (this is not a medical facility). will construct two sheetrock walls that do reach to the ceiling, make minor modifications to selected flooring areas and install a new door. electrical work will entail relocation of subpanels and distribution of electrical service to new bench locations. mechanical work will consist of rerouting existing cda to the new bench locations

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001782
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Add 900 sq ft room, walls only 9ft tall with light system on top of wall. turn existing panels around so they are inside new room. relocate tech benches, add soldering area. ncludes sheetrcok, electriacl adn cda, new badge reader. — texas instruments, inc. wing j2

    TDLR project registrationRenovation/AlterationProject Closed900 sq ft$162K est.
    Tenant / owner
    S. Campus J2s Itar Project
    Design firm
    Pro
    Contact
    Pro
  14. Mechanical (process) system:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others

    Mechanical (process) system:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-001067
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Electrical system:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.additional scope of work:1) tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.2) install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.3) all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel

    Electrical system:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.additional scope of work:1) tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.2) install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.3) all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002859
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Mcr electrical scope of work:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.16. tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.17. install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.18. all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel.mechanical scope of work:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others

    Mcr electrical scope of work:lighting:1. demolition (3) existing 2x2 led light fixtures and return to ti.a) lighting circuit whips shall be labeled and coiled up in ceiling plenum above.b) lighting circuits will be reused during new construction. 2. relocate and install (3) existing 2x4 led light fixtures.3. purchase and install (3) new 2x4 lithonia light fixture.a) model # 2vtl4-48l-adp-ez1-lp480.4. purchase and install (1) new ceiling mounted emergency exit sign.a) loto and extend circuit e1h-l4-n3.power:5. loto the following panel (l-w4-c) and circuits:a) panel l-w4-c2, ckts 50, 52, 54b) panel l-w4-c3, ckts 56, 58, 60c) panel l-w4-c4, ckts 44, 46, 486. relocate panel l-w4-c3 and l-w4-c4 and pull back existing feeder circuits to accommodate new distance for hv lab wall.7. reuse existing wire mold and supports where designated in drawings.8. purchase and install new wire mold and supports where designated in drawings.9. install panel l-v8-c2, sq. d nqod 42 circuit 225a main breaker.a) includes building a strut rack to support new panel.10. purchase and install shunt trip component to existing 225a main circuit breaker and make necessary connection that will make system compatible with the existing epo system.11. purchase and install lan/data pole.12. purchase and install 3p, 30a twistlock receptacle and extend dedicated circuit from panel where designated in drawings.13. purchase and install 1p, 20a twistlock receptacle and extend dedicated circuit from new panel where designated in drawings.14. purchase and install 1p, 30a quad receptacle and extend dedicated circuit from panel where designated in drawings.15. remove existing phone and phone line from column 232v and ring and string for install of new lan line on column 232v.16. tdindustries will install (22) new epos in the k2 high voltage lab.a) (20) epo units will be installed – (1) on each new bench.b) (2) epo units will be installed at the new door.17. install a new control cabinet (20”x20”x10”) next to the new door on the south end of the high voltage lab. a) dk controls to provide (22) epo units and (1) 20”x20”x10” metal enclosure.b) a ¾” conduit will be installed between the new cabinet and the existing one.18. all control wire and 120v wiring will be pulled from the cabinets to each epo, including shunt trip wiring to each electrical panel.mechanical scope of work:1. demolition of existing 1” cda piping from valve above ceiling.2. reuse existing valve assemblies and install during new construction.3. purchase and install 1-1/2” cda piping and tie into existing 3” cda loop.a) includes new valve assemblies.4. demolition of existing 1-1/2” cda piping from above ceiling.a) reinstall existing 1-1/2” cda piping and existing valve assemblies in new locations.5. install (2) new nibco ld-2100 3” butterfly valve (ductile iron, lug type, 200psi)6. purchase and install a total of (20) prefabricated 1/4” 300psi hose, 6’ lengths with 1/4” barb to 1/4” npt male & 1/4” npt female to 1/4” male quick disconnect fittings on both ends.7. unistrut supports to be purchased and installed by others

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001541
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Mcr remodel of existing lab including storefront, drywall , electrical and mechanical

    Mcr remodel of existing lab including storefront, drywall , electrical and mechanical

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001375
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Remodel 2,100 sq ft lab space, add sheet rock headers, electrical panel/epo buttons, modify existing storefront, electrical, cda, fire protection. add/relocate tech benches, remove/rework modular storage rooms. — texas instruments, south campus, wing k2

    TDLR project registrationRenovation/AlterationProject Closed2,100 sq ft$604K est.
    Tenant / owner
    K2 High Voltage Lab Expansion
    Design firm
    Pro
    Contact
    Pro
  19. Renovate 2700 sq ft to add 6 offices, break area, new led lights, and hvac modifications

    Renovate 2700 sq ft to add 6 offices, break area, new led lights, and hvac modifications

    City of Dallas permitCommercial Mechanical Permit$232K
    Record
    2504081183_199056797-002_ME_1
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Add 6 private offices, a break/copy area, extend walls to deck, add insulation replace 3 doors. 2,751 sq ft — texas instruments, cup 1st floor

    TDLR project registrationRenovation/AlterationProject Closed2,751 sq ft$265K est.
    Tenant / owner
    Texas Instruments Cup1 Remodel
    Design firm
    Pro
    Contact
    Pro
  21. Installation of a new fire alarm/detection system for a new suppression system

    Installation of a new fire alarm/detection system for a new suppression system

    City of Dallas permitFire Alarm (FA) Commercial Renovation$3K
    Record
    2011101133
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  22. Remove existing roof and install new roof

    Remove existing roof and install new roof

    City of Dallas permitBuilding (BU) Commercial Alteration$20M
    Record
    2009146008
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. Remodel existing plumbing

    Remodel existing plumbing

    City of Dallas permitPlumbing (PL) Commercial Alteration$45
    Record
    2001243040
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas · Texas Department of Licensing and Regulation

Questions about 12500 Ti Blvd

What is being built at 12500 TI Blvd in Dallas?

A Dallas permit filed October 21, 2026, describes a remodel of an existing second-floor office area, including two new offices and a conference room. The address is a multi-tenant commercial site.

What is the latest permit for 12500 TI Blvd?

The latest listed permit is COM-ALT-ADD-26-002586, filed October 21, 2026. It covers a second-floor office remodel.

Is 12500 TI Blvd a new building?

The latest permit describes remodeling an existing second-floor office area, not building a new structure. Other records at the multi-tenant site also describe interior renovations.

What work is planned for Texas Instruments Wing B?

A TDLR registration filed January 8, 2026, describes enclosing space for an office, two workstations and a break counter, plus converting a copy room into two offices. The registration lists 1,955 square feet and an estimated project cost of $282,000.

Is an electronics lab being built at 12500 TI Blvd?

A Dallas permit filed December 29, 2025, describes an interior remodel to create an enclosed electronics laboratory for testing and modifying electronic components. The description says the work is not for a medical facility.

How much will the 12500 TI Blvd project cost?

The TDLR registration for the Wing B remodel lists an applicant-estimated project cost of $282,000. This estimate applies to that registered project; it is not a total cost for all work at the address.

Also being built nearby

All of 75243

More demolitions in 75243, warehouses & industrial in 75243, medical facilities in 75243.