8989 Forest Ln
Dallas, TX 75243
Interior paint, drywall and two doors permitted at 8989 Forest Ln
A Dallas permit filed September 15, 2026, covers painting, front drywall and two added doors at 8989 Forest Ln. Other permits filed between December 2025 and June 2026 record a gas test, electrical work to restore power and a water-heater replacement. The records do not identify a new tenant or a larger construction project.
Summarized from City of Dallas records · updated Sep 15, 2026
- Projects
- 10
- 10 filings
- Latest filing
- Sep 15, 2026
- since Dec 2, 2020
- Largest scope
- —
- Listed value
- $12
- partial · often understated
Permit & project history
10 projectsSources: City of Dallas
Questions about 8989 Forest Ln
What is being built at 8989 Forest Ln?
The latest permit, COM-ALT-ADD-26-002114, filed September 15, 2026, describes painting, front drywall and two added doors. The records do not describe a new building.
What work is planned at 8989 Forest Ln in Dallas?
A September 15, 2026, permit covers painting, front drywall and two doors. Other permits document a gas test, electrical work to restore power and a water-heater replacement.
Is a new business opening at 8989 Forest Ln?
The City of Dallas permit records provided do not identify a new business or tenant at this address.
What does the permit for unit 136 at 8989 Forest Ln cover?
Permit COM-PLM-26-001977, filed June 1, 2026, is for a gas test for meter release for unit 136. Its description says no repairs were included.
What work is happening near S. Campus Wing B Remodel Project?
At 8989 Forest Ln, about 389 meters from the S. Campus Wing B Remodel Project, a September 2026 permit covers painting, front drywall and two doors.
When was the latest permit filed for 8989 Forest Ln?
The latest filing in the records is permit COM-ALT-ADD-26-002114, dated September 15, 2026. It describes painting, front drywall and two added doors.
Also being built nearby
All of 75243- 9009 Forest LnJun 23, 2025Adding an emergency backup generator. chaing entire electrical service and adding 2 transfer switches · 30 m away
- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs · 53 m away
- 9035 Forest LnMar 31, 2026Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel · 68 m away
- 11835 Greenville AveDec 3, 2025Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer · 194 m away
- 9728 Greenville Ave · Bank OzkMay 22, 20257 pneumatic thermostats7 supply air diffusers6 return grilles · 211 m away
- 8893 Forest LnAug 17, 2026Install electrical pedestal for traffic signals · 230 m away
- 8837 Forest Green DrMay 19, 2025Install 18 total pilings · 238 m away
- 8817 Forest Green DrJun 2, 2025Replace complete system · 263 m away
- 9131 Forest LnSep 21, 2026Clean and show.location is vacant · 269 m away
- 11911 Greenville AveApr 8, 2026Apt-4120- changeout system- install 2.5 air handler and condenser · 278 m away
- 9006 Windy Crest DrJul 20, 2026Emergency meter repair · 283 m away
- 9622 Greenville AveJul 17, 2026Installing 50 gallon electric water heater in closet · 289 m away