9035 Forest Ln
Dallas, TX 75243
Electrical work for freezer and cooler circuits at 9035 Forest Ln
A City of Dallas commercial electrical permit filed March 31, 2026, describes installing four 2-pole, 20-amp circuits for freezers and coolers, relocating some circuits, and adding a 100-amp subpanel. An earlier permit record filed January 21, 2026, says the space was vacant and no work was needed.
Summarized from City of Dallas records · updated Mar 31, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 31, 2026
- since Jan 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstalling (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel
Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 9035 Forest Ln
What work is planned at 9035 Forest Ln?
A March 31, 2026, permit describes four circuits for freezers and coolers, relocation of some circuits, and a new 100-amp subpanel.
Is a new building going up at 9035 Forest Ln?
The available records describe electrical work, not construction of a new building.
What is permit COM-ELC-26-001319 for?
The City of Dallas permit, filed March 31, 2026, covers circuits for freezers and coolers, circuit relocation, and a 100-amp subpanel.
Was 9035 Forest Ln vacant?
A City of Dallas permit record filed January 21, 2026, describes the space as vacant and says no work was needed.
Is a restaurant or store opening at 9035 Forest Ln?
The available permits do not identify a business or say what will occupy the space. The March 31, 2026, filing describes electrical work for freezers and coolers.
How many permits are listed for 9035 Forest Ln?
The records list two City of Dallas commercial electrical permits: one filed January 21, 2026, and another filed March 31, 2026.
Also being built nearby
All of 75243- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs · 15 m away
- 9009 Forest LnJun 23, 2025Adding an emergency backup generator. chaing entire electrical service and adding 2 transfer switches · 38 m away
- 8989 Forest LnSep 15, 2026Mcr just paint, front drywall & add two doors · 68 m away
- 11835 Greenville AveDec 3, 2025Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer · 146 m away
- 9728 Greenville Ave · Bank OzkMay 22, 20257 pneumatic thermostats7 supply air diffusers6 return grilles · 171 m away
- 9131 Forest LnSep 21, 2026Clean and show.location is vacant · 201 m away
- 11911 Greenville AveApr 8, 2026Apt-4120- changeout system- install 2.5 air handler and condenser · 228 m away
- 11880 Greenville AveJul 22, 2026House power meter is requesting to be released for new tenant occupant · 237 m away
- 11886 Greenville AveApr 29, 2026Run gas to bunsen burners · 248 m away
- 9006 Windy Crest DrJul 20, 2026Emergency meter repair · 249 m away
- 9622 Greenville AveJul 17, 2026Installing 50 gallon electric water heater in closet · 271 m away
- 9639 Greenville AveSep 14, 2026Zo bc this is my fourth attempt at this process. i have a client who owns an office building they currently occupy. they have brought in a new tenant for the building and are looking to add a suite 100 and suite 150 certificate of occupancy. the property is already set up for multiple tenants and no construction is necessary. at the request of the city, we had a scaled plan created showing suite 100, suite 150, and the common areas. please let me know what i need to get this taken care of, as this has gone on for a couple of months and the client is getting increasingly annoyed with the process. i am going to select alternation as part of the work, but there is no work necessary to the building. it is ready to go · 292 m away