11886 Greenville Ave
Dallas, TX 75243
Interior alterations and utility work at 11886 Greenville Ave
Permits indicate interior alterations and plumbing and electrical work at 11886 Greenville Ave, including removing a nonstructural wall, adding sink plumbing and outlets, and running gas to Bunsen burners. The first listed permit was filed Oct. 15, 2025, and the latest was filed Apr. 29, 2026.
Summarized from City of Dallas records · updated Apr 29, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Apr 29, 2026
- since Oct 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 11886 Greenville Ave
What is being built at 11886 Greenville Ave?
City of Dallas permits describe interior alterations and plumbing and electrical work, including gas lines for Bunsen burners. The records do not name an occupant or intended use.
What work was permitted at 11886 Greenville Ave?
Permit COM-ALT-ADD-25-000889, filed Oct. 15, 2025, describes removing a 7-by-15-foot nonstructural wall to create a larger space. Later permits cover outlets, plumbing for new sinks, and gas for Bunsen burners.
When were permits filed for 11886 Greenville Ave?
The listed permits were filed between Oct. 15, 2025, and Apr. 29, 2026. The latest, COM-PLM-26-001632, covers running gas to Bunsen burners.
What plumbing work is planned at 11886 Greenville Ave?
Permit COM-PLM-26-000590, filed Feb. 23, 2026, describes plumbing to designated locations for new sinks. A later plumbing permit, COM-PLM-26-001632, covers running gas to Bunsen burners.
What electrical work is permitted at 11886 Greenville Ave?
Permit COM-ELC-26-000263, filed Feb. 10, 2026, describes adding 120-volt and 208-volt electrical outlets.
Is a new building being constructed at 11886 Greenville Ave?
The listed permits describe an interior wall alteration and plumbing and electrical work. They do not describe construction of a new building.
Also being built nearby
All of 75243- 11880 Greenville AveJul 22, 2026House power meter is requesting to be released for new tenant occupant · 13 m away
- 11911 Greenville AveApr 8, 2026Apt-4120- changeout system- install 2.5 air handler and condenser · 28 m away
- 11910 Greenville AveDec 2, 2025Replace 1" rpz, 1" solenoid valve · 52 m away
- 11835 Greenville AveDec 3, 2025Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer · 109 m away
- 9131 Forest LnSep 21, 2026Clean and show.location is vacant · 173 m away
- 12000 Greenville AveSep 16, 2026Fence permit for new construction of a two-story concrete tilt-up panel building with offices, warehouse, training room, break rooms, locker rooms, restrooms, conference rooms, and balcony. the site will be developed for large fleet parking, employee staff parking, and visitor parking. the project will create a new home for water wastewater and stormwater divisions of the dallas water utilities department · 188 m away
- 9035 Forest LnMar 31, 2026Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel · 248 m away
- 9191 Forest LnAug 11, 2026Construct interior non-load barring wall to seperate restroom from kitchen area · 252 m away
- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs · 259 m away
- 8900 Forest LnApr 14, 2026Replace rpz · 273 m away
- 9009 Forest LnJun 23, 2025Adding an emergency backup generator. chaing entire electrical service and adding 2 transfer switches · 278 m away
- 11857 Judd CtJun 29, 2026Refreshment area installation with countertop, cabinets, fridge, sink, coffee machine, and microwave. additional restrooms, one for female, and one for male. exposed plumbing if allowed. wall-hung toilets. please advise if floor drain is required · 288 m away