Recent · latest filing Dec 2025Commercial
11910 Greenville Ave
Dallas, TX 75243
Commercial permit for RPZ and solenoid valve replacement
A commercial plumbing permit at 11910 Greenville Ave covers replacing a 1-inch RPZ and a 1-inch solenoid valve. The City of Dallas recorded the permit on December 2, 2025.
Summarized from City of Dallas records · updated Dec 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 2, 2025
- since Dec 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 11910 Greenville Ave
What work is permitted at 11910 Greenville Ave?
The permit covers replacing a 1-inch RPZ and a 1-inch solenoid valve.
Is new construction planned at 11910 Greenville Ave?
The City of Dallas permit record describes plumbing replacements: a 1-inch RPZ and a 1-inch solenoid valve.
When was the plumbing permit filed for 11910 Greenville Ave?
The City of Dallas recorded the commercial plumbing permit on December 2, 2025.
What is the permit number for work at 11910 Greenville Ave?
The permit number is COM-PLM-25-002869. It was recorded on December 2, 2025.
What does RPZ replacement mean in the 11910 Greenville Ave permit?
The permit description says to replace a 1-inch RPZ and a 1-inch solenoid valve.
Also being built nearby
All of 75243- 11886 Greenville AveApr 29, 2026Run gas to bunsen burners · 52 m away
- 11880 Greenville AveJul 22, 2026House power meter is requesting to be released for new tenant occupant · 65 m away
- 11911 Greenville AveApr 8, 2026Apt-4120- changeout system- install 2.5 air handler and condenser · 67 m away
- 12000 Greenville AveSep 16, 2026Fence permit for new construction of a two-story concrete tilt-up panel building with offices, warehouse, training room, break rooms, locker rooms, restrooms, conference rooms, and balcony. the site will be developed for large fleet parking, employee staff parking, and visitor parking. the project will create a new home for water wastewater and stormwater divisions of the dallas water utilities department · 135 m away
- 11835 Greenville AveDec 3, 2025Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer · 151 m away
- 9131 Forest LnSep 21, 2026Clean and show.location is vacant · 221 m away
- 12101 Greenville AveJan 16, 2026No work - clean & show · 246 m away
- 12250 Greenville Ave · Racetrac, INCFeb 23, 2024Racetrac #514 johnson freeway — renovation/alteration — minor exterior upgrades and improvements to interior equipment · 277 m away
- 9191 Forest LnAug 11, 2026Construct interior non-load barring wall to seperate restroom from kitchen area · 278 m away
- 11857 Judd CtJun 29, 2026Refreshment area installation with countertop, cabinets, fridge, sink, coffee machine, and microwave. additional restrooms, one for female, and one for male. exposed plumbing if allowed. wall-hung toilets. please advise if floor drain is required · 288 m away
- 9035 Forest LnMar 31, 2026Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel · 296 m away
- 8900 Forest LnApr 14, 2026Replace rpz · 302 m away