9131 Forest Ln
Dallas, TX 75243
Electrical permit filed for vacant commercial space
A commercial electrical permit was filed for the vacant location at 9131 Forest Ln in Dallas. The City of Dallas record, filed September 21, 2026, describes the work as “clean and show.”
Summarized from City of Dallas records · updated Sep 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 21, 2026
- since Sep 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9131 Forest Ln
What is being built at 9131 Forest Ln?
The City of Dallas record does not describe a new building. It lists a commercial electrical permit for a vacant location, with the work described as “clean and show.”
What is the permit for at 9131 Forest Ln?
Permit COM-ELC-26-004598 is a commercial electrical permit. Its description says “Clean and show.location is vacant.”
When was the 9131 Forest Ln permit filed?
The permit was filed on September 21, 2026, according to the City of Dallas record.
Is 9131 Forest Ln vacant?
The permit description states that the location is vacant.
Is a business opening at 9131 Forest Ln?
The available permit record does not identify a business or say that one is opening. It describes the location as vacant.
Also being built nearby
All of 75243- 11880 Greenville AveJul 22, 2026House power meter is requesting to be released for new tenant occupant · 162 m away
- 9191 Forest LnAug 11, 2026Construct interior non-load barring wall to seperate restroom from kitchen area · 164 m away
- 11835 Greenville AveDec 3, 2025Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer · 167 m away
- 8900 Forest LnApr 14, 2026Replace rpz · 167 m away
- 11886 Greenville AveApr 29, 2026Run gas to bunsen burners · 173 m away
- 11911 Greenville AveApr 8, 2026Apt-4120- changeout system- install 2.5 air handler and condenser · 178 m away
- 9728 Greenville Ave · Bank OzkMay 22, 20257 pneumatic thermostats7 supply air diffusers6 return grilles · 196 m away
- 9035 Forest LnMar 31, 2026Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel · 201 m away
- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs · 216 m away
- 11910 Greenville AveDec 2, 2025Replace 1" rpz, 1" solenoid valve · 221 m away
- 9027 Windy Crest DrAug 20, 2025Hvac changeout – replace 1 full hvac system with a new lennox high-efficiency 5-ton gas system. existing equipment will be removed and replaced with new matched components including condenser, coil, furnace, and control system. installation will be completed in the attic with no structural modifications indicated · 227 m away
- 9100 Forest LnAug 28, 2026Mcr project address: 9100 forest ln, dallas, txscope: exterior facade alterationframing: raise 50 linear feet of the existing sign framing by 1'-0", increasing overall height from 3'-0" to 4'-0" to accommodate the new signage. new construction to be light-gauge metal stud framing, fastened to existing framing with new top track and continuous connection to existing structure. the remaining 65 linear feet of framing to remain in place at existing 3'-0" height, with no modification.finishes: new tile finish at the raised sign field, 8 linear feet per elevation for a total of 16 linear feet. interlocking split-face block faux wall panels at the remaining 65 linear feet of facade, installed per manufacturer specifications. panels to be exterior-rated, uv-stable, and class a flame spread.exclusions: no change to building footprint, occupancy, or occupant load. no modification to existing structural members, foundation, or load paths. no electrical, mechanical, or plumbing work under this permit. signage permitted separately · 228 m away